• 제목/요약/키워드: semi-shield tunneling

검색결과 4건 처리시간 0.021초

SEMI-SHIELD 공법의 설계 및 시공상 문제점 (Design and Construction Problems of Semi-Shield Method)

  • 김종인;정성남;박영건
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.1275-1282
    • /
    • 2009
  • The tunnel excavations are used for construction of common utility tunnel, electric tunnel, communication line tunnel, water supply and public sewerage pile line in urban area. The trench cut methods were mainly used in the past, but now, tunneling method is more being used. The tunnel excavation method like as NATM, Messer-Shield, Semi-Shield Methods are being applied to small section tunnel in Korea. The actual construction results of seme-shield method are increasing due to simplified construction process and reduced noise and vibration. And also this method is being used frequently in waterway tunnel and construction of prevention flooding recently. The seme-shield method design guideline is absence except for electric line tunnel construction in Korea, because of the semi-shield method was developed in Europe and Japan. In the prescriptive design, engineer's subjects are tending to intervene, because of absence of standard and specification for details. Therefore, Design and Construction Problems of Semi-Shield Method were described and construction trouble was introduced for exam. These problem and construction troubles have to be examined thoroughly in advance.

  • PDF

A Study of the 3D Unmanned Remote Surveying for the Curved Semi-Shield Tunneling

  • Lee, Jin-Yi;Jun, Jong-Woo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.1791-1796
    • /
    • 2005
  • Semi-shield tunneling is one of the propulsion construction methods used to lay pipes underground between two pits named 'entrance' and 'destination', respectively. Usually a simple composition, such as 'a fiducial target at the entrance+a total station (TS)+a target on the machine', is used to confirm the planned course. However, unavoidable curved sections are present in small-sized pipe lines, which are laid after implementation of a road system, for public works such as waterworks, sewer, electrical power, and gas and communication networks. Therefore, if the planned course has a curved section, it is difficult to survey the course with the abovementioned simple composition. This difficulty could be solved by using the multiple total stations (MTS), which attaches the cross type linear LED target to oneself. The MTS are disposed to where each TS can detect the LED target at the other TS or the base point or the machine. And the accurate relative positions between each MTS and target are calculated from measured data. This research proposes the relative and absolute coordinate calculation algorithm by using three MTS to measure a curved course with 20m curvature at 30m maximum distance, and verifies the algorithm experimentally.

  • PDF

점성토 지반에서의 실드 터널 시공에 따른 지표침하 예측 기법 (A Prediction Method for Ground Surface Settlement During Shield Tunneling in Cohesive Soils)

  • 유충식;이호
    • 한국지반공학회지:지반
    • /
    • 제13권6호
    • /
    • pp.107-122
    • /
    • 1997
  • 본 논문에서는 점성토 지반에서의 실드 터널 시공에 따른 지표 침하 예측 기법을 제시하였다. 예측 기법을 개발하기 위해 실드 터널의 시공과정을 모사할 수 있는 3차원 유한요소해석기법을 이용하여 매개변수 변환 연구를 수행하였으며, 해석 결과를 이용하여 지반 거동메카니즘을 고찰하고 지반 거동과 영향 요소와의 관계를 나타내는 데이터 베이스를 구축 하였다. 구축된 데이터 베이스에 대한 다중 회귀분석을 통해 막장 상부에서의 지표 침하비와 변곡점의 위치를 결정하는 반경험식을 개발하고 이를 기존의 정규확률분포함수와 접목시켜 횡단면 및 종단면 지표 침하 형상을 예측하는 기법을 제안하였다. 제안된 예측 기법은 유효요소 해석 결과 및 현장 계측 자료와의 비교를 통해 그 타당성이 입증되었으며, 따라서 제시된 예측 기법은 본 연구에서 고려한 경계조건과 유사한 조건에서 효율적으로 적용될 수 있을 것으로 판단된다.

  • PDF

연속굴착 쉴드 TBM 기술 관련 해외기술 및 개발사례 조사 (Investigation of Prior Technology and Development Case for Consecutive Excavation Technique of Shield TBM)

  • 김문규;조정우;차형석
    • 터널과지하공간
    • /
    • 제33권5호
    • /
    • pp.299-311
    • /
    • 2023
  • TBM의 실굴진율을 향상시키기 위한 연속굴착 기술들이 개발되고 있다. 연속굴착은 설치중인 세그먼트를 제외한 나머지 세그먼트에 추력을 가해, 굴진 정지 시간을 줄이는 기술이다. 본 기술보고는 연속굴착 세그먼트에 관한 선행기술을 조사하였다. 주요 선행기술을 헬리컬 세그먼트, 육각형 세그먼트, 기존 세그먼트 방법으로 분류했다. 헬리컬 세그먼트 방법은 아직 시공사례가 없으며, 육각형 세그먼트 방법은 상용화에 성공하지 못했다. 기존 세그먼트를 이용한 연속굴착 방법은 실증에 성공했다. 해당 기술에 대한 추진잭 추력, 운영방법을 분석했다. 국내에서도 TBM 연속굴착 연구개발이 진행 중이며, 성공사례 분석을 통해 독자적인 연속굴착 방법이 개발되어야 할 것으로 판단된다.