• Title/Summary/Keyword: segmental bridges

Search Result 43, Processing Time 0.021 seconds

Long Term Behavior and Analysis of Full Span Precast Segmental Bridge (풀스팬 프리캐스트 세그먼트 교량의 해석 및 장기거동 해석)

  • 오병환;채성태;정상화;박지언
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.434-441
    • /
    • 1999
  • The newly proposed Precast Segmental Mettled (PSM), which makes use of precast elements for election, is relatively new, efficient and fast mettled for the construction of prestressed box girder bridges. A precast segment of 25m long pretensioned in the fabrication yard is transported by a special trailer and a launching truss to its final position. The segments are then connected in the site by post-tensioning to make a continuous prestressed concrete box girder bridges. The purpose of this parer is to analyze and evaluate the design of precast prestressed concrete box girder bridges. The detailed analyses including time-dependent behavior of PSM bridges are conducted. The major results and findings, which have been obtained from finite element analysis of PSM bridge, are discussed in this paper and these results will be a good base for the design and analysis of a new precast bridges.

  • PDF

Safety Assessment and Behavior Control System using Monitoring of Segmental PSC Box Girder Bridges during Construction (세그멘탈 PSC박스거더교량의 시공간 계측모니터링을 통한 확률적 구조안정성 평가 및 제어 시스템)

  • Shin, Jae-Chul;Cho, Hyo-Nam;Park, Kyung-Hoon;Bae, Yong-Il
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.3
    • /
    • pp.191-201
    • /
    • 2001
  • In spite of the increasing construction of segmental PSC box girder bridges, the techniques associated with real-time monitoring, construction control and safety assessment during construction have been less developed compared with the construction techniques. Thus, the development of an integrated system including real-time measurement and monitoring, control and safety assessment system during construction is necessary fur more safe and precise construction of the bridges. This study presents a prototype integrated monitoring system for preventing abnormal behavior and accidents under construction stages, that consist of behavior control system for precise construction, reliability-based safety assessment system, and structural analysis. Also, a prototype software system is developed on the basis of the proposed model. It is successfully applied to the Sea-Hae Grand Bridge built by FCM. The integrated system model and software system can be utilized for the safe and precise construction of segmental PSC bridges during construction.

  • PDF

Proof Load Test and Integrity Assessment of Segmental PC Box-girder Bridges (Segmental PC 박스거더교의 검증재하시험 및 건전성평가)

  • 조효남;임종권;옥승범;지광습
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1995.10a
    • /
    • pp.132-141
    • /
    • 1995
  • This study is intended to propose practical but systematic and rational approaches for proof load test and integrity assessment of segmental PC box-girder bridges. The proposed models cover the whole range of field tests and assessment of such as inspections, nondestructive tests, static and dynamic load tests, structural analysis, and integrity assessment for the evaluation of load carrying capacity, serviceability, and durability of PC box-girder bridges. They are applied to a newly constructed precast segmental PC box-girder bridge which is a part of the Seoul interior circuit elevated expressway.

  • PDF

Time-Dependent Behavior of Prestressed Concrete Bridges Constructed by the Segmental Cantilever Method (캔틸레버 시공법에 의한 프리스트레스트 콘크리트 교량의 장기 거동 해석)

  • 오병환;최계식;이상희
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1989.10a
    • /
    • pp.73-76
    • /
    • 1989
  • A numerical procedure is developed to analyze the time-dependent behavior of prestressed concrete bridges constructed by the segmental cantilever method. The developed computer program accounts for the time-dependent properties of prestressed concrete materials due to the varing modulus of elasticity, creep and shrinkage of concrete and the stress relaxation of prestressing steel. It also accounts for the stiffness increase due to the presence of the steel reinforcements and the effects of the shear deformation of the prestressed concrete bridge girders. The program is applied to a multi-span continuous segmental prestressed concrete bridge to demonstrate its capabilities.

  • PDF

A Study on the Geometry Control of the Precast Segmental Bridges and the Fabrication of Precast Segments (프리캐스트 세그멘탈 교량의 선형관리와 세그멘트 제작에 관한 연구)

  • 이환우;이만섭;이경철
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1996.10a
    • /
    • pp.514-519
    • /
    • 1996
  • In this study, an investigation on the geometry control of the precast segmental method(PSM) was performed and GEOCON was developed. It is an interactive software to control the 3-dimensional geometry of precast segmental bridges during the construction progress. Specially, this paper emphasized that the fabrication stage of the precast segment is the most important for the geometry control in the PSM and also descussed about some problems which can be overlooked in developing and using the geometry control softwares by explaining the GEOCON's characteristics. GEOCON was successfully applied to the surrounding road of Pusan harbor.

  • PDF

An Experimental Study on the Joints in Ultra High Performance Precast Concrete Segmental Bridges (초고성능 프리캐스트 콘크리트 세그멘탈 교량 접합부에 대한 실험 연구)

  • Lee, Chang-Hong;Chin, Won-Jong;Choi, Eun-Suk;Kim, Young-Jin
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.2
    • /
    • pp.235-244
    • /
    • 2011
  • Failures of segmental bridges have been attributed to the inadequate joint connection techniques, which led to corrosion of the post-tensioned tendons connecting the segmental joints. The principal objective of this study is to evaluate the performances of the in-situ cast joint and epoxy applied shear key joints as a function of shear and ultimate strengths. Furthermore, shear behavior and strength of shear key joints in ultra high performance precasted concrete segmental bridges are experimentally evaluated to understand its shear failure behavior. The test parameters of shear key shape and type, load-displacement relations, cracking behavior, concrete strength, and fracture modes are considered in the study. Also, several parameters which influence the mechanical behavior of the shear key joint are analyzed. Based on the study results, the optimal shear key shape and joint type are proposed for the joint design and analysis guidelines.

An innovative geometry control method for short-line match precast segmental bridges

  • Xuzheng Liu;Huibing Xu;Jianyang Yu;Wei Quan
    • Advances in concrete construction
    • /
    • v.16 no.2
    • /
    • pp.79-89
    • /
    • 2023
  • The occurrence of unexpected horizontal offset in the instrument or target will result in accumulated horizontal deviation in segment alignment with traditional short-line match method. A geometry control method, the four-point method, is developed for precast segmental bridges to avoid the influences of unexpected horizontal offset. The concept of the four-point method is elucidated. Furthermore, the detailed instruments and instructions are introduced. Finally, the four-point method is validated through a practical engineering application. According to the survey data, after short-line match precast construction, the vertical deviations on both sides vary between -5 mm and 5 mm in almost all segments, and the horizontal deviations vary between -4 mm and 4 mm in all segments. Without on-site adjustment, the maximum vertical and horizontal closure gaps are 12.3 and 26.1 mm, respectively. The four-point method is suggested to alleviate the issues associated with relatively poor soil conditions in casting yard.

Time-Dependent Deflections of Prestressed Concrete Bridges Constructed by the Segmental Cantilever Method (캔틸레버 시공법에 의해 가설되는 프리스트레스트 콘크리트 교량의 장기처짐해석)

  • Oh, Byung Hwan;Choi, Kye Shick
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.10 no.2
    • /
    • pp.49-58
    • /
    • 1990
  • A numerical procedure is developed to analyze the time-dependent deflections of prestressed concrete bridges constructed by the segmental cantilever method. The developed computer program accounts for the time-dependent properties of prestressed concrete materials due to the varying modulus of elasticity, creep and shrinkage of concrete and the stress relaxation of prestressing steel. It also accounts for the stiffness increase due to the presence of the steel reinforcements and the effects of the shear deformation of the prestressed concrete bridge girders. The program is applied to a multi-span continuous segmental prestressed concrete bridge to demonstrate its capabilities and to explore the behavior characteristics of the segmental bridges.

  • PDF

Study on Affecting Factors for the Segmental Joint Behavior of Spliced Girder Bridges (분절교량 접합부 거동의 영향인자에 대한 연구)

  • Nam, Jin-Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.3
    • /
    • pp.9-16
    • /
    • 2019
  • Recently, precast PSC girder bridges have been widely applied for short and middle span bridges. The construction of the spliced girder bridges has been increasing to overcome the length limit of girder and transportation restrictions. In case of the spliced girder, the integrity of the segmental joints is very important to secure the structural soundness of bridge because the discontinuity on the segmental joints between adjacent segments could be vulnerable point. The study of segmental joint behavior with different influence factors of joint type, shear key installation, confining force is very important. In this research, finite element analysis and scaled model test with different shear key shapes and confining forces were carried out and the comparative study was performed to evaluate the segmental joint behavior of precast spliced PSC girder bridge. It was confirmed that the installation of shear key with height and depth ratio of 1/2~1/3 and applying of confining force of 1/2 of the concrete strength at the joint was effective in improving the integrity of segmental joint. In addition, the field loading test for existed precast spliced PSC girder bridge was performed and the measurement of the difference of deflection between adjacent segments at segmental joint was proposed as the assessment solution of the integrity of segmental joint.

Long-term behavior of segmentally-erected prestressed concrete box-girder bridges

  • Hedjazi, S.;Rahai, A.;Sennah, K.
    • Structural Engineering and Mechanics
    • /
    • v.20 no.6
    • /
    • pp.673-693
    • /
    • 2005
  • A general step-by-step simulation for the time-dependent analysis of segmentally-erected prestressed concrete box-girder bridges is presented. A three dimensional finite-element model for the balanced-cantilever construction of segmental bridges, including effects of the load history, material nonlinearity, creep, shrinkage, and aging of concrete and the relaxation of prestressing steel was developed using ABAQUS software. The models included three-dimensional shell elements to model the box-girder walls and Rebar elements representing the prestressing tendons. The step-by-step procedure allows simulating the construction stages, effects of time-dependent deformations of materials and changes in the structural system of the bridges. The structural responses during construction and throughout the service life were traced. A comparison of the developed computer simulation with available experimental results was conducted and good agreement was found. Deflection of the bridge deck, changes in stresses and strains and the redistribution of internal forces were calculated for different examples of bridges, built by the balanced-cantilever method, over thirty-year duration. Significant time-dependent effects on the bridge deflections and redistribution of internal forces and stresses were observed. The ultimate load carrying capacities of the bridges and the behavior before collapse were also determined. It was observed that the ultimate load carrying capacity of such bridges decreases with time as a result of time-dependent effects.