• Title/Summary/Keyword: scheduling management

Search Result 1,282, Processing Time 0.03 seconds

A Study on Development of Site to Maximize Network Advertisement Effect (네트워크 광고 효과 극대화를 위한 사이트 개발에 관한 연구)

  • 이공섭
    • Journal of the Korea Safety Management & Science
    • /
    • v.2 no.2
    • /
    • pp.177-185
    • /
    • 2000
  • In recent dates, Internet advertising effects are expanded by the steep increment of the Internet users and the extension of the advertising market will be accelerated through Internet. This paper indicates the importance of Internet advertising and suggests the solution of a network advertising service. The system is divided into an Advertise Server, an Advertiser and a Web Publisher. This study proposes both the collection and the analysis of traffic data in real time. Also, the banner advertising frames are smoothed for the impression using the solution for the banner exchange engine and are developed using various impression methods, that is, Fixed/variable Banner, Scheduling Banner, Multi-Impression Banner, and Frame Remote Control to increase the advertising effect. And then to increase the advertising effect web publisher, which is specialized in lottery site, is constructed using the network advertising service and various advertising technology.

  • PDF

Research on cost control and scheduling using EVM(Earned Value Management) of ERP(Enterprise Resource Planning) Project (ERP 프로젝트에서 EVM을 활용한 일정 및 원가통제에 관한 연구)

  • Park, Soon-Bong;Lee, Seouk-Joo;In, Hoh
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.1147-1150
    • /
    • 2012
  • Earned value management(EVM)는 프로젝트 진행 상태를 파악하기 위해 주로 비용과 일정 편차, 성과지표를 통합하여 분석하는 것으로 비용/원가 관리를 위해 발전되어 사용되어 왔다. ERP 프로젝트는 국내 솔루션 시장의 가장 높은 점유율을 차지하고 있지만, 수행에 대한 성과평가 및 일정예측 가능한 신뢰성 있는 Tool 은 알려지지 않고 있다. 본 연구에서는 ERP 프로젝트의 EVM 성과지표를 분석을 통해 ERP 프로젝트가 원가측면의 계획대비 수행 적합성이 높으며, 국내 ERP 프로젝트는 분석단계에서 일정 지연이 발생한다는 것을 발견하였다 향후 본 연구를 통해 EVM 성과 지표를 이용한 현재 시점의 프로젝트 상태를 점검하며, 향후 일정과 원가를 예측하여 성공적인 ERP 프로젝트 수행에 도움이 되고자 한다.

A FRAMEWORK FOR SIMULATING CONSTRUCTION PROCESSES FOR OPTIMIZING THE FLOOR CONSTRUCTION CYCLE USING BIM

  • Seung-Jun Ahn;Hyun-Soo Lee;Moonseo Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.835-840
    • /
    • 2009
  • Lately, Building Information Modeling (BIM) emerges as the most promising technology, now is expected to bring a great deal of improvement of productivity in every aspect of the construction industry. One of the BIM based scheduling is to use BIM model as a base for applying to schedule analysis and simulation tools. This type of tools may incorporate a various types of information such as the building model, construction method information, resource information, productivity information, rules and constraints to optimize activity sequencing. This paper proposes a framework of BIM based simulating system which can be used to optimize construction processes, especially for the floor construction cycle. For the purpose, all of the necessary components of the system will be defined and represented, and next an algorithm will be introduced to demonstrate the principle of simulating operation. The benefits of this technique are basically two : to test and optimize construction methods in respect of the construction duration and to reduce the floor construction cycle.

  • PDF

Quantifying Monetary Value of Float

  • Park, Young-Jun;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.111-113
    • /
    • 2015
  • Floats are used by the parties involved in a construction project. The owner may use float by changing order(s) or by executing risk avoidance plan; the contractor may use it for leveling resources or substituting activities' construction methods to reduce costs. Floats are accepted either just as by-product obtained by critical path method(CPM) scheduling or as asset having significant value. Succinctly, existing studies involved in float value does not consider its' changes on project time domain. It is important to identify float ownership and to quantify its' corresponding values. This paper presents a method that quantifies float value of money that changes over project execution. The method which accurately computes the monetary value of float may contributes to resolve conflicts relative to float ownership and/or delay issues among project participants. It compares the difference between the monetary value of total float - on non-critical path in each and every schedule update. It makes use of critical path method (CPM) and commercial software with which practitioners are already familiar.

  • PDF

AN EXAMPLE OF REPRESENTING THREE LEVEL'S SCHEDULES WITHIN SCHEDULE HIERARCHY BY BDM TECHNIQUE

  • Seon-Gyoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.445-452
    • /
    • 2011
  • The schedule hierarchy in construction project is generally composed of three levels. The highest level is a milestone schedule and represented by Bar Chart format. The middle level is an integrated project schedule (IPS) and represented by CPM (Critical Path Method) format. The lowest level is a detail working schedule and usually represented by Bar Chart. The traditional scheduling techniques such as ADM (Arrow Diagramming Method) or PDM (Precedence Diagramming Method) cannot represent all kinds of schedule within schedule hierarchy as identical schedule format. However, the BDM (Beeline Diagramming Method) technique can represent all kinds of schedule within schedule hierarchy as identical CPM format. This paper describes the basic concept, principle, interpretation methods, and schedule computation methods of the BDM as a new networking technique that can represent all kinds of overlapping relationships between activities, and then presents an example of representing three level's schedules within schedule hierarchy by the BDM technique.

  • PDF

2Q-CFP: A Client Cache Management Scheme for Broadcast-based Information Systems (2Q-CFP: 방송에 기초한 정보 시스템을 위한 클라이언트 캐쉬 관리 기법)

  • 권혁민
    • Journal of KIISE:Databases
    • /
    • v.30 no.6
    • /
    • pp.561-572
    • /
    • 2003
  • Broadcast-based data delivery has attracted a lot of attention as an efficient way of disseminating data to very large client populations. The main motivation of broadcast-based information systems (BBISs) is that the number of clients that they serve can grow arbitrarily large without any effect on their performance. The performance of BBISs depends mainly on client caching strategies and on data broadcast scheduling mechanisms. This paper addresses the former issue and proposes a new client cache management scheme, named 2Q-CFP, that is suitable to BBISs. This paper also evaluates the performance of 2Q-CFP on the basis of a simulation model. The performance results indicate that 2Q-CFP scheme shows superior performances over GRAY, LRU and CF in the average response time.

Earned Value Management Systems Using 4D-CAD (4D CAD 활용을 통한 공정-원가 통합 시스템)

  • Park Ji-Ho;Jung Young-Soo;Kim Sung-Mo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-508
    • /
    • 2003
  • Cost and schedule are the major concerns for the successful construction project management. The four dimensional CAD (4D CAD) integrating graphical data and scheduling data has also been an area of research interests for improving construction controls. In order to achieve the benefits from these areas in an integrated way, this study proposes a 4D-EVMS system for the owners. Managerial requirements for cost and schedule control for the owners are identified first. A 4D-EVMS model is then proposed which provides functional flexibility in order to enhance the efficiency of the system. Lessons learned and practical implications are briefly summarize.

  • PDF

Limiting the Number of Open Projects to Shorten the NPD Schedule

  • Wang, Miao-Ling;Yang, Chun-I;Chang, Sheng-Hung
    • Industrial Engineering and Management Systems
    • /
    • v.10 no.1
    • /
    • pp.34-42
    • /
    • 2011
  • Many companies open multiple projects simultaneously due to market trends, which results in a crowding out effect because of limited resources. R&D engineers become overloaded and scheduling of product development is delayed resulting in timing misses and lost sales leads. The company in this case study (Company A), often opens up many projects simultaneously in order to respond to market needs quickly. The engineers are overloaded and, of course, the schedule is delayed. In order to identify problems, Company A began using Dr. Goldratt's Thinking Processes (TP) during new product development (NPD). When the analysis phase of TP was completed, Company A's core problem was identified as "the quantity of kick-off projects." Consequently, new rules and conditions and procedures were proposed for the opening, suspending, stopping, and closing of projects. Finally, the "Future Reality Tree" ensured that the proposed rules, conditions and procedures were set up as an available solution approved for practical application by executives. After a one-year trial run, the results showed that the Project Duration Rate was reduced by 53%, the Project Closed Rate was increased by 140% and the Project on Time Rate was increased from 10% to 68%. The above results give significant evidence of the benefits of the proposed methodology.

The Efficient Buffer Management for a Multimedia File System (멀티미디어 파일 시스템을 위한 효율적 버퍼 관리)

  • Hong, Chul-Eui
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.15 no.8
    • /
    • pp.1743-1749
    • /
    • 2011
  • The multimedia data for video-on-demand(VOD) service has large, continuous and real time characteristics. The frequent disk I/O operations takes much time and decrease the system performance in multimedia services. Therefore the efficient buffer management is needed in order to reduce the disk accesses to multimedia data. This paper addresses how to increase the buffer hit ratio and the number of users in a multimedia service like VOD by increasing the utility of buffer. This paper also simulated various resource management algorithms and strategies and evaluated, compared and analyzed their performances.

Design of Probabilistic Model for Optimum Manpower Planning in R&D Department (연구개발 부문 적정인력 산정을 위한 확률적 모형설계에 관한 연구)

  • Kim, ChongMan;Ahn, JungJin;Kim, ByungSoo
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.1
    • /
    • pp.149-162
    • /
    • 2013
  • Purpose: The purpose of this study was to design of a probabilistic model for optimum manpower planning in R&D department by Montecarlo simulation. Methods: We investigate the process and the requirement of manpower planning and scheduling in R&D department. The empirical distributions of necessary time and manpower for R&D projects are developed. From the empirical distributions, we can estimate a probability distribution of optimum manpower in R&D department. A simulation method of estimating the probability distribution of optimum manpower is considered. It is a useful tool for obtaining the sum, the variance and other statistics of the distributions. Results: The real industry cases are given and the properties of the model are investigated by Montecarlo Simulation. we apply the model to the research laboratory of the global company, and investigate and compensate the weak points of the model. Conclusion: The proposed model provides various and correct information such as average, variance, percentile, minimum, maximum and so on. A decision maker of a company can easily develop the future plan and the task of researchers may be allocated properly. we expect that the productivity can be improved by this study. The results of this study can be also applied to other areas including shipbuilding, construction, and consulting areas.