• Title/Summary/Keyword: scheduling management

Search Result 1,293, Processing Time 0.033 seconds

SPEEDUP applications in control and optimization of process plant

  • Mushin, D.A.;Ward, P.S.;Pantelides, C.C;Macchietto, S.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1989.10a
    • /
    • pp.841-843
    • /
    • 1989
  • Aspects of modelling, performance monitoring, control and optimisation are discussed, with particular reference to the application of SPEEDUP. A new facility is described which allows SPEEDUP to operate in conjunction with other systems and several examples are briefly given of its power and flexibility. In particular, its use in on-line applications alongside plant management and distributed control systems is described and how it can be used in scheduling/sequencing problems in investigating batch and cyclic problems.

  • PDF

Real-time distributed industrial process control system (실시간 분산 공정 제어 시스템)

  • 이도영;윤창진;전태웅
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1986.10a
    • /
    • pp.158-163
    • /
    • 1986
  • This article surveys techniques and issues related to real time process control system developed for industrial control applications. It covers the system architecture and software engineering issues such as the design of data structures, scheduling of asynchronous task activities, management of shared resources, handling of interrupt and implementing an user friendly man-machine interface. Also problems associated with implementing a real-time system that supports dynamic configuration of data base is addressed.

  • PDF

On the Size of the Constraint Buffer in the TOC(Theory of Constraints) (제약이론에서 제약버퍼의 크기 결정)

  • Koh, Shie-Gheun;Yoon, Hoon-Yong
    • IE interfaces
    • /
    • v.14 no.4
    • /
    • pp.334-340
    • /
    • 2001
  • The theory of constraints (TOC) has become a valuable system in modern operations management. Using the ideas and methods of the TOC, companies can achieve a large reduction of work-in-process and finished-goods inventories, significant improvement in scheduling performance, and substantial earnings increase. The purpose of this paper is to calculate the optimal size of the time buffer which is used to accommodate disruptions in production processes and provide maximum productivity of capacity constrained resources. After the problem formulation in terms of single server queueing model, we observed the system behavior by sensitivity analyses.

  • PDF

A Study on Scheduling Multiple Workflows for Workflow Management System (워크플로우 관리 시스템에서의 다중 워크플로우 스케줄링 기술 연구)

  • Joo, Kyung-no;Youn, Chan Hyun
    • Annual Conference of KIPS
    • /
    • 2014.04a
    • /
    • pp.124-125
    • /
    • 2014
  • 워크플로우 관리 시스템은 사용자의 어플리케이션 실행 요청들을 받아서 클라우드 위에서 수행시켜주는 역할을 한다. 따라서, 다중 워크플로우 요청을 스케줄링할 수 있는 알고리즘이 반드시 필요하다. 본 논문은 다중 워크플로우를 스케줄링하기 위한 기법들을 분석하고자 한다.

Introducing and Surveying 4D Models in AEC Industry (4D 공정관리시스템의 개발현황 조사연구)

  • Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2001
  • The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.

  • PDF

Application of CCPM to Construction Project (건설프로젝트에 CCPM의 적용)

  • Kim Young;Lee Young-Dae;Kim Ok-Su;Kim Sung-Hwan;Park Hyeok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.95-101
    • /
    • 2003
  • The Theory of Constraints (TOC) is an approach and a philosophy that is used to develop specific management techniques. It was first popularized by the novel, The Coal, that applied the principles to operations management. Since 1997 it has found application in two areas within project management The first application is scheduling of a sing1e project to reduce project duration and simplify project control. there is a further application to allocate resources that are shared by concurrent project. It is the objective of this paper to explore the fundamentals of critical chain and to pursue an application of critical chain method to construction project by a case study.

Buffer Management Method for Multiple Projects in the CCPM-MPL Representation

  • Nguyen, Thi Ngoc Truc;Takei, Yoshinori;Goto, Hiroyuki;Takahashi, Hirotaka
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.4
    • /
    • pp.397-405
    • /
    • 2012
  • This research proposes a framework of buffer management for multi-project systems in the critical chain project management (CCPM) method, expressed in the form of max-plus linear (MPL) representation. Since time buffers are inserted in the projects for absorbing uncertainties in task durations and protecting the completion times, the proposed method provides a procedure for frequently surveying the rates of consumed buffers and the rate of elapsed times. Their relation expresses the performance of the projects which is plotted on a chart through the completed processes. The chart presents the current performance of the projects and their interaction, which alerts managers to make necessary decisions at the right time for managing each project and the entire multi-project system. The proposed framework can analyze the complex system readily, and it enables managers to make an effective decision on scheduling. The effectiveness of the framework is demonstrated through a numerical example.