• 제목/요약/키워드: scheduling management

Search Result 1,293, Processing Time 0.026 seconds

DECISION SUPPORT SYSTEM FOR OPTIMAL SELECTION OF HAUL ROUTES BASED ON TIME SLOTS IN EARTHMOVING OPERATION

  • Sang-Hyeok Kang;Kyeong-Geun Baik;Hyun-Gi Baek;Hyeong-Gi Park;Jong-Won Seo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1134-1139
    • /
    • 2009
  • Haul routes for earthmoving operation need to be carefully selected because the decision on the haul routes could make a significant difference in the project's cost and time. This paper proposes a decision support system for improving productivity of earthmoving operation that helps construction managers choose the best haul routes of trucks based on time slots. Also, a methodology for optimal selection of haul routes considering traffic conditions and topographic conditions of the routes is explained. Raster data model is used to find an available shortest path based on cost weighted distance. A system was developed on a geographic information system environment for efficient database management and easy manipulation of graphical data. A real-world case study was conducted to verify the applicability of the proposed system.

  • PDF

DEVELOPMENT OF A RESOURCE LEVELING MODEL USING OPTIMIZATION

  • Jin-Lee Kim;Ralph D. Ellis
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.558-563
    • /
    • 2005
  • This paper presents a GA-based optimal algorithm for a resource leveling model that levels the resources of a set of non-critical activities experiencing conflicts simultaneously up to an assumed level of resource rates specified by the planner using a pair-wise comparison of the activities being considered. A parameter called the future float is adopted and applied as an indicator for assigning leveling priorities to the sets of activities experiencing conflicts. A construction project network example was worked out to demonstrate the performance of the proposed method. The histogram obtained using the algorithm proposed was shown to be the same as, or very close to that produced by the existing resource leveling method based on the least total float rule, which shifts non-critical activities individually.

  • PDF

EVALUATING THE FEASIBILITY OF THE HIGHWAY ENGINEERING SCHEDULE USING SIMULATION TECHNIQUE

  • Liu Weijun;Yuan Jianbo;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.897-901
    • /
    • 2005
  • In the highway engineering, the performance, quantity and status of machines available for the project have direct impact on the project time. For instance, the status of machines, such as working or in trouble, have great influence on the activity execution. Therefore, while scheduling the project, the project manager always increases the spare machines or prolong the activity time to avoid delaying the project time when some of the machines are in trouble in construction site. However, how many are the spare machines and how long are the prolonged activity time, which are estimated subjectively by the manager. This subjective estimation has been criticized for systematically overestimating or underestimating quantity of the machines and the activity time. In the paper, we propose and prototype a model to simulate the status of the machines in construction site, and then to evaluate the schedule feasibility considering the performance, quantity and statues of the machines involved.

  • PDF

Study of Optimization of Ground Vehicles Routes Aiming to Reduce Operational Costs and to Contribute to a Sustainable Development with the Reduction of Carbon Dioxide in the Atmosphere

  • Clecio, A.;Thomaz, F.;Hereid, Daniela
    • The Journal of Economics, Marketing and Management
    • /
    • v.4 no.1
    • /
    • pp.1-8
    • /
    • 2016
  • The purpose of this paper is to discuss the methodology of optimizing delivery route scheduling using a capacity integer linear programming problem model developed to a previous case study. The methodology suggests a two-stage decision: the first, automatic, where the manager will obtain guidance generated by the solution of the linear programming model, later they could use post-optimization techniques to fine tune to the best operational solution. This study has the goal to reduce the size of service companies' ground transportation fleets, aiming not only to reduce costs and increase competitive advantages but also to lower levels of air pollution and its consequences, traffic and, therefore, the levels of carbon dioxide, allowing for a reduction in envir onmental disasters.

A PATH ENUMERATION APPROACH FOR CRITICAL ANALYSIS IN PROJECT NETWORKS WITH FUZZY ACTIVITY DURATIONS

  • Siamak Haji Yakchali
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.575-581
    • /
    • 2011
  • A novel approach for analysis of criticality with respect to path and to activity in networks with fuzzy activity durations is proposed. After recalling the Yager ranking method, the relative degree of criticality of activities and paths are defined. An efficient algorithm based on path enumeration to compute the relative degree of criticality of activities and paths in networks with fuzzy durations is proposed. Examples of former researches are employed to validate the proposed approach. The proposed algorithm has been tested on real world project networks and experimental results have shown that the algorithm can calculate the relative degree of criticality of activities and paths in a reasonable time.

  • PDF

An Adaptive Batching Scheduling Policy for Efficient User Services (효율적인 사용자 서비스를 위한 적응적 배칭 스케줄링 정책)

  • Choe, Seong-Uk;Kim, Jong-Gyeong;Park, Seung-Gyu;Choe, Gyeong-Hui;Kim, Dong-Yun;Choe, Deok-Gyu
    • Journal of the Institute of Electronics Engineers of Korea CI
    • /
    • v.37 no.2
    • /
    • pp.44-53
    • /
    • 2000
  • The waiting delays of users are inevitable in this policy since the services are not taken immediately upon requests but upon every scheduling points. An inefficient management of such delays makes an unfair service to users and increases the possibility of higher reneging rates. This paper proposes an adaptive batch scheduling scheme which improves the average waiting time of users requests and reduces the starvation problem of users requesting less popular movies. The proposed scheme selects dynamically multiple videos in given intervals based on the service patterns which reflect the popularity distribution(Zipf-distribution) and resource utilizations. Experimental results of simulations show that the proposed scheme improves about 20-30 percentage of average waiting time and reduces significantly the starving requesters comparing with those of conventional methods such as FCFS and MQL.

  • PDF

DNS-based Dynamic Load Balancing Method on a Distributed Web-server System (분산 웹 서버 시스템에서의 DNS 기반 동적 부하분산 기법)

  • Moon, Jong-Bae;Kim, Myung-Ho
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.33 no.3
    • /
    • pp.193-204
    • /
    • 2006
  • In most existing distributed Web systems, incoming requests are distributed to servers via Domain Name System (DNS). Although such systems are simple to implement, the address caching mechanism easily results in load unbalancing among servers. Moreover, modification of the DNS is necessary to load considering the server's state. In this paper, we propose a new dynamic load balancing method using dynamic DNS update and round-robin mechanism. The proposed method performs effective load balancing without modification of the DNS. In this method, a server can dynamically be added to or removed from the DNS list according to the server's load. By removing the overloaded server from the DNS list, the response time becomes faster. For dynamic scheduling, we propose a scheduling algorithm that considers the CPU, memory, and network usage. We can select a scheduling policy based on resources usage. The proposed system can easily be managed by a GUI-based management tool. Experiments show that modules implemented in this paper have low impact on the proposed system. Furthermore, experiments show that both the response time and the file transfer rate of the proposed system are faster than those of a pure Round-Robin DNS.

An Uplink Scheduling Algorithm for VoIP in IEEE 802.16d Systems (IEEE 802.160에서 상향링크 VoIP 스케줄링 알고리즘 방식 연구)

  • Kang, Min-Seok;Jang, Jae-Shin
    • Journal of the Korea Society for Simulation
    • /
    • v.15 no.3
    • /
    • pp.87-91
    • /
    • 2006
  • With the growth of the internet, the number of wireless internet users has increased continuously up to date. However, mobile communications could not support high speed transmission rate with cheap communication fee and wireless LAN has problems in providing terminal mobility and wide area connectivity, respectively. So the WMAN standard has been newly designed to make up for these limits. The initial 802.16 specification effectively offers a solution for providing fixed users with high speed wireless communication but it does not offer terminal mobility. So the 802.16d and 802.16e have been developed as the next generation solution that can support various PHY layer (SC, SCa, OFDM, OFDMA) and offer the terminal mobility. In this paper, we propose an effective uplink scheduling algorithm for VoIP with using UGS, and we show that our proposed algorithm is superior in view of average delay and management of uplink bandwidth to conventional rtPS algorithm and the scheme in reference, with using NS-2 network simulator.

  • PDF

Loan/Redemption Scheme for I/O performance improvement of Virtual Machine Scheduler (가상머신 스케줄러의 I/O 성능 향상을 위한 대출/상환 기법)

  • Kim, Kisu;Jang, Joonhyouk;Hong, Jiman
    • Smart Media Journal
    • /
    • v.5 no.4
    • /
    • pp.18-25
    • /
    • 2016
  • Virtualized hardware resources provides efficiency in use and easy of management. Based on the benefits, virtualization techniques are used to build large server clusters and cloud systems. The performance of a virtualized system is significantly affected by the virtual machine scheduler. However, the existing virtual machine scheduler have a problem in that the I/O response is reduced in accordance with the scheduling delay becomes longer. In this paper, we introduce the Loan/Redemption mechanism of a virtual machine scheduler in order to improve the responsiveness to I/O events. The proposed scheme gives additional credits for to virtual machines and classifies the task characteristics of each virtual machine by analyzing the credit consumption pattern. When an I/O event arrives, the scheduling priority of a virtual machine is temporally increased based on the analysis. The evaluation based on the implementation shows that the proposed scheme improves the I/O response 60% and bandwidth of virtual machines 62% compared to those of the existing virtual machine scheduler.

A Case Study on Capacitated Lot-sizing and Scheduling in a Paper Remanufacturing System (제지 재제조 시스템에서의 자원제약을 고려한 로트 크기 결정 및 일정 계획에 대한 사례연구)

  • Kim, Hyeok-Chol;Doh, Hyoung-Ho;Yu, Jae-Min;Kim, Jun-Gyu;Lee, Dong-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.77-86
    • /
    • 2012
  • We consider the capacitated lot-sizing and scheduling problem for a paper remanufacturing system that produces several types of corrugated cardboards. The problem is to determine the lot sizes as well as the sequence of lots for the objective of minimizing the sum of setup and inventory holding costs while satisfying the demand and the machine capacity over a given planning horizon. In particular, the paper remanufacturing system has sequence-dependent setup costs that depend on the type of product just completed and on the product to be processed. Also, the setup state at one period can be carried over to the next period. An integer programming model is presented to describe the problem. Due to the complexity of the problem, we modify the existing two-stage heuristics in which an initial solution is obtained and then it is improved using a multi-pass interchange method. To show the performances of the heuristics, computational experiments were done using the real data, and a significant amount of improvement is reported.