• Title/Summary/Keyword: scheduling management

Search Result 1,293, Processing Time 0.027 seconds

Event Oriented Modeling Approach on Tunnel Muck Hauling Operations (터널 버력처리 공정의 시뮬레이션 모델 구축에 관한 연구)

  • Kim, Kyoung-Min;Seo, Hyeong-Beom;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.574-578
    • /
    • 2006
  • Simulation has considerable potential as the tool of construction management, but in the case of domestic, it is at an early stage applying simulation to micro-process assesment. For applying simulation to the construction process, much effort is needed to collect input data and to build the model including the characteristics of the fields. This study introduces the methodology to build the simulation model, then verifies the model with the operation data.

  • PDF

K-WFMS: An Intelligent Workflow Management System for Changing Organization (조직변화에 유연한 지능형 워크플로우 자동화 시스템: K-WFMS)

  • Lee, Ha-Bin;Park, Sung-Joo
    • Asia pacific journal of information systems
    • /
    • v.11 no.3
    • /
    • pp.149-164
    • /
    • 2001
  • In this paper, an adaptive workflow management system, called K-WFMS, is proposed. The K-WFMS integrates database system and knowledge-based system to automate business processes that are executed with complex and various business rules such as task scheduling, role resolution, and exception handling rules. The K-WFMS is adaptable in the sense that it allows its users to change workflow schema in the course of workflow execution as well as it provides rule-based modeling constructs to handle predictable exceptions during workflow modeling. The overall architecture and implementation of K-WFMS are explained, and the change propagation mechanism to maintain validity of workflow model is suggested.

  • PDF

Factors for the Improvement of APS (APS개선을 위한 요인 분석)

  • Hwang, Deok-Hyeong;Yang, Gwang-Mo;O, Seon-Il;Park, Hyeon-Sun;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.585-602
    • /
    • 2012
  • In order for the companies under current business environment to survive, develop, and to grow more complicated than the companies under a simple competition, they have to make a management decision considering the relationships among companies and constraints. Since product life is shortening and customers' needs is changing, companies should reflect the change in their agenda, and should be spontaneous to the change. In this study, I will analyze and improve the factors of APS systmem.

  • PDF

Improving Overall Equipment Effectiveness(OEE) in Korean Small and Medium Manufacturing Industries (중소제조업체의 설비효율향상 방안에 대한 연구)

  • Baek, Jong-Yeop;Gang, Yun-Jin;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.04a
    • /
    • pp.219-230
    • /
    • 2010
  • Remarkably improvements have occurred recently in the maintenance management of physical assets and productive systems, so that less wastages of energy and resources occur. The technology of maintenance is about finding and applying cost-effective ways of avoiding or overcoming performance deterioration. Maintenance is thus a vital support function in business, especially as increasingly large investments are being required in physical assets. TPM(Total Productive Maintenance) focuses on optimizing planning scheduling. Availability, performance and quality rate are other factors that affect productivity. Especially there are some losses that affect the overall equipment effectiveness(OEE). These losses lead to low values of OEE, which provides an indication of how effective the production precess is. This study explores the ways in which Korean small and medium manufacturing industries can improve OEE.

  • PDF

A Method on building SCM between manufacturer and supplier (제조업체와 협력업체간 SCM구축에 관한 방법론)

  • 심상용;박재현;김봉진
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.1
    • /
    • pp.35-44
    • /
    • 2001
  • Today's environment of enterprise is changing. They have to face customers' demands with the right product, the right service and supply them at the right time. And aIso cut down logistics and inventory cost and bring up the Profit as much as they can. This means the change of putting enterprise first in importance to putting customer first in importance. therefore to correspond to customer's demand, shorting lead time is becoming a essential condition. The answer to this changes of environment is supply chain management In this study, we use Goldratt's drum-buffer-rope scheduling in between manufacturer and supplier. And when shortage of inventory occur, search for the supply chain's CCR. Pressing CCR for more production, and supply Inventory from logistic center to guide for inventory buffing. using logistic warehouse between manufacturer and supplier, can execute function of buffer.

  • PDF

Determine Customer Value for Scheduling (일정계획을 위한 고객가치 결정에 관한 연구)

  • 양광모;박재현;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2002.05a
    • /
    • pp.115-120
    • /
    • 2002
  • Today's environment of enterprise is changing. They have to face customer' demands with the right product, the right service and supply them at the right time. And also cut down logistics and inventory cost and bring up the profit as much as they can. This means the change of putting enterprise first in importance to putting customer first importance. therefore to correspond to customer's demand, shorting lead time is becoming a essential condition. The answer to this changes of environment is supply chain management. In this paper, It consolidates the necessity on a LTV(Life Time Value) and analyzes data which is concerned of Customer Value. Under the these environments, defines the LTV(Life Time Value) rule that can improve the customer value.

  • PDF

A Study on the Construction of Knowledge Base in a Project Management System by Using SOM

  • Yoon, Kyung-Bae;Park, Jun-Hyeong;Wang, Chang-Jong
    • Proceedings of the IEEK Conference
    • /
    • 2002.07c
    • /
    • pp.1764-1767
    • /
    • 2002
  • Recent explosive increases in information 'volume have led to a rapid development or a change of information technology which stores, searches, and manages a vast amount of information. It is considered that an effective share and utilization of a large amount of digital information produced by work performances is a pivotal element which can make decisive contributions to a great success of business management. This common property of information reflects a changing social paradigm including a change of business processes. This paper is aimed at designing and embodying the construction of knowledge base in an efficient project management system using unsupervised data mining techniques in order to extract information and utilize it as knowledge about standard data (statistical data, template etc.,), size prediction and a danger precaution notice which are needed for a plan and a scheduling of a new project from data coming from already-established projects.

  • PDF

A Development of Web-based Inventory System using a RFID in Injection Molding Industry (RFID를 이용한 사출산업에서의 웹기반 재고관리시스템 개발)

  • Lim, Seok-Jin
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.3
    • /
    • pp.177-182
    • /
    • 2010
  • Industrial business environments have rapidly changed and face severe competitive challenges. The effective inventory system enables to product and deliver the products quickly for meeting due date of customer's order in this environment. This study have developed a web-based inventory system using RFID for an injection molding industry. The system analysis inventory problem issues such as inventory planning, warehouse assignment and assist to develop production scheduling. In this study, web-based inventory system using Java language and RFID technology is proposed and implemented. As the result of implementation of the system, we expected that it manages to inventory planning continually and systematically.

A Study on Proto-type Development of BIM based Stochastic Duration Estimation Module (BIM기반 추계학적 공기 예측 모듈 프로토 타입 개발에 관한 연구)

  • Park, Jae-Hyun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.159-162
    • /
    • 2009
  • Today's construction is more various and more complex. Because of that, a lot of uncertain factors are occurred and they related uncertain construction duration. For management complex architecture project, importance of construction schedule management also increased. In previous studies, one of solutions to overcome those problems is suggested. It was BIM based construction simulation process which focused on construction schedule and construction schedule management. But latest process had limited point which has no duration estimation function. So this paper suggested duration estimation method and developed duration estimation module. Duration estimation module developed with current scheduling tool MS Project and their macro function. However, this module has just developed Reinforced Concrete Structure and has to do more development and research.

  • PDF

Bounding Space Management for Real-time Visual Simulation of GK-DEVS (GK-DEVS의 실시간 시각 시뮬레이션을 위한 외곽공간의 관리)

  • 황문호
    • Journal of the Korea Society for Simulation
    • /
    • v.11 no.4
    • /
    • pp.1-14
    • /
    • 2002
  • This paper presents bounding space(BS) management for real-time visual simulation when using GK-DEVS models. Since GK-DEVS, extended from DEVS formalism, has information of 3D geometry and 3D hierarchical structure, we employs three types of bounding spaces: BS of its own shape, BS of its children GK-DEVS, and total BS. In addition to next-event scheduling functionality of previous GK-Simulator, its abstract simulation algorithms is extended to manage the three types of BSs so that BSs can be utilized in the rendering process of a renderer, so called GK-Renderer, We have implemented the method and evaluated it with an automated manufacturing system. In the case study, the proposed BSs management method showed about 2 times improvement in terms of rendering process speed.

  • PDF