Examining Understanding and Knowledge of Time Management Perception for the Architectural Education in the United States

  • Soh, In Chul
    • Architectural research
    • /
    • v.8 no.2
    • /
    • pp.1-10
    • /
    • 2006
  • This research has acquired preliminary information about the existing conditions and understanding of members regarding time management for members in the architectural field. The goal of this research is to construct a basis for the time management education framework in architectural field in the future. This research mainly focuses on following questions based on limited objectives: Do groups of academics and professionals have understanding and knowledge of time management? Can the level of an individual's scheduling techniques be correlated to the patterns of knowledge and understanding of time management principles and practices? Can the time management practice status in individual's working environment be correlated to the patterns of knowledge and understanding of time management principles and practices? Can an individual's self-confidence level be correlated to the patterns of knowledge and understanding of time management principles and practices? Data have been collected through comprehensive questionnaires given to academics and professionals in United States. By means of statistical analysis, the hidden patterns, deficiencies and relationships in attitudes about time management have been revealed. The statistical analysis has produced conclusions that, among several subdivisions, self-discipline and planning have strong relationships and confidence, personal organization, control, and information gathering subdivisions have certain relationships with objectives of time management education in this research.

An Adaptive Smart Grid Management Scheme Based on the Coopetition Game Model

  • Kim, Sungwook
    • ETRI Journal
    • /
    • v.36 no.1
    • /
    • pp.80-88
    • /
    • 2014
  • Recently, the idea of the smart grid has been gaining significant attention and has become a hot research topic. The purpose of this paper is to present a novel smart grid management scheme that uses game theory principles. In our proposed scheme, power appliances in the smart grid adaptively form groups according to the non-cooperative hedonic game model. By exploiting multi-appliance diversity, appliances in each group are dynamically scheduled in a cooperative manner. For efficient smart grid management, the proposed coopetition game approach is dynamic and flexible to adaptively respond to current system conditions. The main feature is to maximize the overall system performance while satisfying the requirements of individual appliances. Simulation results indicate that our proposed scheme achieves higher energy efficiency and better system performance than other existing schemes.

Essence Applicability Matrices for the Reduction of Project Cycle Time

  • Hong, Tae Hoon;Son, Jae Ho
    • Architectural research
    • /
    • v.8 no.1
    • /
    • pp.57-68
    • /
    • 2006
  • Global competition and reduced project life cycle ultimately puts greater performance requirements on the capital project delivery systems used to maintain competitiveness. Despite continuing improvements in delivery cycle time, business owners of facilities continue to demand greater improvements in project delivery cycle time. Therefore, it is very important to investigate the various techniques and methods leading to reduction in project cycle time and also identify the applicability of identified techniques and methods. This paper introduces reduction techniques identified through literature review (i.e, Schedule Reduction Techniques (SRTs), Management Techniques (MTs), and Construction Institute Industry (CII) Best Practices (BPs). In order to collect applicability of these techniques under different project phases (Pre-project planning (PPP), Design (D), Material Management (MM), Construction (C), and Start-up (SU)), the Essence Applicability Matrices (EAM) is used.

A Study on Project Management Scheduling Module Development using the Rule and CBR (규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구)

  • Sin, Ho-Gyun;Kim, Yeong-Jun;Jeon, Seung-Ho
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

Water Management Program for TM/TC (물관리자동화시스템(TM/TC)을 위한 물관리프로그램 개발)

  • go, Gwang Don;Lim, Chang Young;Kwak, Yeong Cheol
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.790-793
    • /
    • 2004
  • TM/TC system is composed of control center, reservoirs, pumping stations and twelve canal systems. For this system we developed water management program which includes flood forecast program, drought reduction program, irrigation scheduling program and database program. With these program we expect that operators improve the irrigation efficiencies of the irrigation systems due to the timely irrigation on a right place, in a proper quantity and refute tile cost of maintenance and reduce flood and drought damages. In agricultural engineering respect, the databases including water level, rainfall, the amount of flowing can be useful to the researcher who make a study of hydrology and hydraulics in . rural area. Water management program records all of the TM/TC data to MDB format file per 10 minutes.

  • PDF

A study activating devices in scheduling management for analyzing progress payment in Korea (기성지급방식 비교분석을 통한 국내 공정관리 활성화 방안에 관한 연구 -경부고속철도 공사와 대만 고속철도공사 비교 중심으로-)

  • 이태식;김영현;정현진;김영환;김대영;윤철수;노시현
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.66-71
    • /
    • 2001
  • Most payments in domestic construction are issued in lumpsum unit price contracts according to the completed construction rate. This method generates problems in losing time and increased costs for the owner and contactor. In overseas projects, payments are issued in accordance to completed milestones. The milestones themselves base on the original schedule and allow effective schedule management on the tasks. In domestic construction, however, introduction of milestone payments requires enhanced management capability of owners and contractors. Hence, this study investigating how to activate schedule management devices to analyze progress payments in domestic construction.

  • PDF

Perceptual Differences between IS Project Service Providers and Customers on Information System Project Risk Factors: a Koran case (정보시스템 프로젝트의 위험요인에 대한 현업인력과 서비스제공인력과의 인식도 차이)

  • Lee, Seog-Jun;Cho, Suk-Jin;Park, Jung-Sun;Hahm, Yu-Keun;Kim, Yong-Jae
    • Journal of Information Technology Applications and Management
    • /
    • v.14 no.3
    • /
    • pp.79-94
    • /
    • 2007
  • Cases of botched information systems implementation have been surfaced due to poor IS project management and control. One major source of such failures is the perceptual difference between the participants of IS projects who should define potential risk factors well before considered IS projects are launched. Based on risk factors cited from prior works, this paper empirically examines the risk factors associated with IS service project management to analyze perceptual differences between the IS service providers and customers in Korea. Data analyses found significant differences in the area of scheduling/resource, technological newness, communications, and sponsorship/ownership while statistically significant differences were observed in eleven individual factors out of forty six risk factors. Risk factors are also ordered in terms of perceived importance to highlight the critical differences.

  • PDF

Femtocell Networks Interference Management Approaches

  • Alotaibi, Sultan
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.4
    • /
    • pp.329-339
    • /
    • 2022
  • Small cells, particularly femtocells, are regarded a promising solution for limited resources required to handle the increasing data demand. They usually boost wireless network capacity. While widespread usage of femtocells increases network gain, it also raises several challenges. Interference is one of such concerns. Interference management is also seen as a main obstacle in the adoption of two-tier networks. For example, placing femtocells in a traditional macrocell's geographic area. Interference comes in two forms: cross-tier and co-tier. There have been previous studies conducted on the topic of interference management. This study investigates the principle of categorization of interference management systems. Many methods exist in the literature to reduce or eliminate the impacts of co-tier, cross-tier, or a combination of the two forms of interference. Following are some of the ways provided to manage interference: FFR, Cognitive Femtocell and Cooperative Resource Scheduling, Beamforming Strategy, Transmission Power Control, and Clustering/Graph-Based. Approaches, which were proposed to solve the interference problem, had been presented for each category in this work.

STOCHASTIC SCHEDULING CONSIDERING INTERDEPENDENT ACTIVITY DURATIONS

  • I-Tung Yang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.791-795
    • /
    • 2005
  • A simulation model is proposed to evaluate the effect of correlations between activity durations on the overall project duration. The proposed model incorporates NORTA, a recent developed statistical method, into the simulation process to allow arbitrarily specified marginal distributions for activity durations and any desired correlation structure. The generality is of practical value when systematic data is not available and planners have to rely on arbitrary experts' estimation, which may involve a mixed situation when some activity durations are continuously distributed whereas others are discrete outcomes. The proposed model is validated by showing that the correlation coefficients of the simulation results are close to the originally specified ones. The simulation results are compared to two conventional approaches: PERT and simulation without correlation. The comparisons illustrate that the proposed model can provide important management information, which would otherwise be distorted due to the neglect of the correlations between activity durations.

  • PDF

BASIC DESIGN OF A SCHEDULING TOOL FOR SMART DEVICES

  • Myunghoun Jang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.521-524
    • /
    • 2013
  • Schedule management of construction work is important in order to complete construction projects within a given period of time. Many efforts have been made and many tools have been developed in order to manage construction projects by a smart device such as smart phones and smart pads. This research proposed a basic design to manage construction schedules via a smart device using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A basic structure was designed for a user to be able to make and change a schedule by touching the smart device's screen. And a prototype was implemented by Adobe Flash/Flex Builder, it is applied to a sample network in a smart phone.

  • PDF