• Title/Summary/Keyword: scheduling management

Search Result 1,293, Processing Time 0.032 seconds

Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing -Focusing on One Cycle Time Scheduling Mechanism of Typical Floor- (아파트 골조공사의 공기단축 및 효과적 공정운영 방안 -기준층 사이클 공정분석을 중심으로-)

  • Han Choong-Hee;Bang Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.87-96
    • /
    • 2004
  • The construction duration in apartment construction is an important factor which affects project cost. Henceforth, the time shortening is essential to retrench project cost and project risk when there adopt Five-Day Workweek and introduce apartment sales after completion of construction. Therefore, the purpose of this study is to examine closely the affecting factors on the duration of framework which forms about $40\sim50\$ percent of total time in apartment construction by analyzing the schedule mechanism of typical floor and to show the reasonable time shortening methods by case study. The shown schedule mechanism and basic schedule table can utilize as a guideline in case of scheduling of framework in the existing construction method. Also, the shown time shortening methods by three case studies will guide the direction and process of time shortening while there need time shortening in many-sided projects.

Functional Analysis of Production Planning & Scheduling Solutions from SCM Perspective (공급망 관리 관점에서의 생산계획 솔루션 기능 분석)

  • Han, Kwan Hee
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.6
    • /
    • pp.564-573
    • /
    • 2018
  • External environment of enterprises are rapidly changing brought about mainly by global competition, cost and profitability pressures, and emerging new technology. In particular, frequent change of customer requirements is a tough challenge to manufacturing company. To cope with these challenges, a production planning and scheduling (PP&S) function might be established to provide accountability for both customer service and operational efficiency. PP&S deals with short-term decision making in the production process of whole supply chain. The task of PP&S is to seek a balance between customer orders and limited resources. At present, many PP&S software solutions have been utilized in many enterprises to generate a realistic production plan and schedule efficiently. The aim of this paper is to analyze the PP&S functionalities and its system architecture from the perspective of SCM (Supply Chain Management), and propose the PP&S solution classification framework to facilitate the comparison among various solutions.

TACT Scheduling & Monitoring of Apartment Finish Works based on the BDM Technique (BDM기법을 적용한 공동주택 마감공사 TACT공정계획 수립 및 운영)

  • Kim, Seon-Gyoo;Yoo, Jae-Woo;Kim, Dong-Sub;Park, Jong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.3-11
    • /
    • 2014
  • As the recent construction projects have been carried out as a mixed-use complex project that includes architecture, civil, mechanical, electrical, and landscape, as well as become bigger and high-rise with the increased repetitive works, the TACT technique has received more attention as an effective method for achieving a target completion date by securing the continuous works. Although the TACT technique can maintain a steady flow without the interruption of works in order to utilize the resources of the repetitive works, it can not be considered as the systematic scheduling technique because the schedule computations are not possible as well as a critical path can not be recognized. This paper proposes the applicabilities of scheduling and monitoring the TACT schedule by the BDM technique as comparing and analyzing the methodologies for apartment finish works by the Excel, the Primavera(P6) based on the PDM technique, and the Beeliner based on the BDM technique that is a new networking technique, respectively.

Probability Distribution of Project Completion Times in Simulation based Scheduling (시뮬레이션 일정기법;최종공사기간의 확률 통계적 특성 추정)

  • Lee, Dong-Eun;Kim, Ryul-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.327-330
    • /
    • 2007
  • This paper verifies that the normality assumption that the simulation output data, Project Completion Times (PCTs), follow normal distribution is not always acceptable and the existing belief may lead to misleading results. A risk quantification method, which measures the effect caused by the assumption, relative to the probability distribution of PCTs is implemented as an algorithm in MATLAB. To validate the reliability of the quantification, several series of simulation experiments have been carried out to analyze a set of simulation output data which are obtained from different type of Probability Distribution Function (PDF) assigned to activities'duration in a network. The method facilitates to find the effect of PDF type and its parameters. The procedure necessary for performing the risk quantification method is described in detail along with the findings. This paper contributes to improving the reliability of simulation based scheduling method, as well as increasing the accuracy of analysis results.

  • PDF

A study of Cluster Tool Scheduler Algorithm which is Support Various Transfer Patterns and Improved Productivity (반도체 생산 성능 향상 및 다양한 이송패턴을 수행할 수 있는 범용 스케줄러 알고리즘에 관한 연구)

  • Song, Min-Gi;Jung, Chan-Ho;Chi, Sung-Do
    • Journal of the Korea Society for Simulation
    • /
    • v.19 no.4
    • /
    • pp.99-109
    • /
    • 2010
  • Existing research about automated wafer transport management strategy for semiconductor manufacturing equipment was mainly focused on dispatching rules which is optimized to specific system layout, process environment or transfer patterns. But these methods can cause problem as like requiring additional rules or changing whole transport management strategy when applied to new type of process or system. In addition, a lack of consideration for interconnectedness of the added rules can cause unexpected deadlock. In this study, in order to improve these problems, propose dynamic priority based transfer job decision making algorithm which is applicable with regardless of system lay out and transfer patterns. Also, extra rule handling part proposed to support special transfer requirement which is available without damage to generality for maintaining a consistent scheduling policies and minimize loss of stability due to expansion and lead to improve productivity at the same time. Simulation environment of Twin-slot type semiconductor equipment was built In order to measure performance and examine validity about proposed wafer scheduling algorithm.

On the Technology for High-speed Router Design (고속 라우터 기술)

  • 주성순
    • Proceedings of the IEEK Conference
    • /
    • 1999.11a
    • /
    • pp.105-108
    • /
    • 1999
  • In this paper, we define the high-speed router as a router, which can support aggregated ports over 25Gbps, and provide issues and trends in high-speed router design. We propose design considerations on IP packet forwarding, switching fabric, packet scheduling and buffer management, network resource reservation, and router operation and administration.

  • PDF

Design of a Change Management Framework for Group Collaborative Systems (그룹협동 시스템을 위한 변화관리 모형의 설계)

  • 허순영
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.3
    • /
    • pp.1-16
    • /
    • 1995
  • Group collaborative systems are recently emerging to support a group of users engaged in common tasks such as group decision making, engineering design, group scheduling, or collaborative writing. This paper provides an change management framework for the group collaborative system to facilitate managing dependency relationship between shared objects and dependent user views, and coordinating change and propagation activities between the two in distributed computing environments. Specifically, the framework adopts an object-oriented database paradigm and presents several object constructs capturing dependency management and change notification mechanisms. First, it introduces change management mechanisms with transient shared objects and secondly, it extends them into presistent object computing environment by integrating transaction management mechanisms and change notification mechanisms. A prototype change management framework is developed on a commercial object-oriented database management system.

  • PDF

The Epidemiology of Delays in a Teaching Hospital (부적절 재원의 이유)

  • Kim, Yoon;Lee, Kun-Sei;Kim, Chang-Yup;Kim, Yong-Ik;Shin, Young-Soo;Lee, Sang-Il
    • Journal of Preventive Medicine and Public Health
    • /
    • v.26 no.4 s.44
    • /
    • pp.650-660
    • /
    • 1993
  • This study aims to describe the causes of medically unnecessary hospital stay at a teaching tertiary hospital, using modified version of Delay Tool in which the causes of delay are divided into slx major categories : delay related to test scheduling, test results, surgery, medical staff, patient/family, and administration. For the analysis of hospital stay, 6,479 inpatient-days were reviewed in two medical and four surgical departments for one month. Initially inappropriate hospital stays were identified using Appropriateness Evaluation Protocol (AEP), and causes of delay listed in Delay Tool were assigned to each of them. In both medical and surgical services, the most important cause of delay was related to medical staffs, ranging from 3.6% to 51.6% of total inpatient days. Next important category was delay related to test scheduling in medical services ($4.7{\sim}9.2%$), and delay related to surgery in surgical services ($7.3{\sim}15.0%$). Among subcategories of delay related to medical staffs, delay due to conservative care was the most important cause of inappropriate hospital stay ($2.9{\sim}6.4%$). Each clinical departments had different distribution among delay categories, which could not be fully justified by their clinical charateristics. The Delay Tool would be helpful in exploring factors related to the inefficient use of hospital beds. As a measurement tool of inappropriate hospital stay, however, the Delay Tool should be refined in the definitions of categories and its contents.

  • PDF

A Study on the Generation of Crew Scheduling Diagram Using Neighborhood Search Method for Improving Railway Operation Management (철도 운영관리 효율화를 위한 이웃해 탐색기법을 사용한 승무다이아 생성방안)

  • Lee, Jaehee;Park, Sangmi;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.42-51
    • /
    • 2019
  • The train operation institution establishes a transportation plan based on the forecast of transport demand and the ability of train vehicles to transport, and establishes a train operation plan accordingly. The train operation plan adjusts the intervals between trains, creates a timetable (train diagram) for trains, and establishes a plan for the operation of train vehicles used for train operation. The train operation institution shall establish a crew schedule to determine and place the crew members of the trains arranged in the diagram in order to enhance the efficiency of the operation management of the trains. In this study, the authors apply the neighborhood search method that satisfies the constraints at the phase of generating the crew diagram. This suggests a methodology for efficient management of crew schedule plan. The crew diagram generated in this study compared with the existing crew diagram in accordance with the actual operating train timetable, and verified the effectiveness of the suggested method.