DOI QR코드

DOI QR Code

Functional Analysis of Production Planning & Scheduling Solutions from SCM Perspective

공급망 관리 관점에서의 생산계획 솔루션 기능 분석

  • 한관희 (경상대학교 산업시스템공학부/공학연구원)
  • Received : 2018.04.20
  • Accepted : 2018.05.04
  • Published : 2018.06.28

Abstract

External environment of enterprises are rapidly changing brought about mainly by global competition, cost and profitability pressures, and emerging new technology. In particular, frequent change of customer requirements is a tough challenge to manufacturing company. To cope with these challenges, a production planning and scheduling (PP&S) function might be established to provide accountability for both customer service and operational efficiency. PP&S deals with short-term decision making in the production process of whole supply chain. The task of PP&S is to seek a balance between customer orders and limited resources. At present, many PP&S software solutions have been utilized in many enterprises to generate a realistic production plan and schedule efficiently. The aim of this paper is to analyze the PP&S functionalities and its system architecture from the perspective of SCM (Supply Chain Management), and propose the PP&S solution classification framework to facilitate the comparison among various solutions.

최근 들어 기업의 외부 환경은 글로벌 경쟁, 원가 절감과 이윤 확보에 대한 압박 및 신기술의 급격한 발전 등에 의해 매우 급속하게 변화하고 있다. 특히, 고객 요구 사항의 빈번한 변화는 제조 기업에게 심각한 도전이 되고 있다. 이러한 도전에 대응하기 위해서는, 고객 서비스 향상과 운영 효율성 제고를 위해 여러 관리 기능 중에서 생산계획 기능이 우선적으로 정립되어야 한다. 생산계획은 전체 공급망 관리 중에서 생산 프로세스에서의 단기적 의사결정을 다루며, 그 역할은 고객 주문과 제한된 자원 사이에서 균형을 찾는 것이다. 본 논문의 목적은 공급망 관리 관점에서 생산계획의 기능성과 시스템 아키텍처를 분석하고, 이를 기반으로 생산계획 솔루션들 간의 비교를 가능케 하기 위한 분류 프레임워크를 제시하는 것이다.

Keywords

References

  1. T. Vitzthum and F. Herrmann, "Evidence of the Relevance of Master Production Scheduling for Hierarchical Production Planning," Proceedings of the 31st European Conference on Modeling and Simulation, Budapest, Hungary, May 2017.
  2. 한관희, "지속적 프로세스 개선을 위한 성과 중심의 생애 주기 기반 비즈니스 프로세스 관리 프레임워크," 한국콘텐츠학회논문지, 제17권, 제4호, pp.221-233, 2017.
  3. W. Shen, I. Wang, and Q. Hao, "Agent-Based Distributed Manufacturing Process Planning and Scheduling: A State-of-the-Art Survey," IEEE Transactions on Systems, Man and Cybernetics-Part C: Applications and Reviewers, Vol.36, No.4, pp.563-577, 2006. https://doi.org/10.1109/TSMCC.2006.874022
  4. 아체 사례이도렛하니, 한관희, "효율적인 비즈니스 프로세스 진단 및 설계를 위한 프로세스 마이닝과 시뮬레이션 통합 프레임워크," 한국콘텐츠학회논문지, 제17권, 제5호, pp.44-55, 2017.
  5. 김상국, 신성호, "BPM을 기반으로 한 ISO 9001 품질 경영 시스템 구축," 한국콘텐츠학회논문지, 제6권, 제4호, pp.38-45, 2006.
  6. M. Christopher, Logistics and Supply Chain Management. Strategies for Reducing Cost and Improving Service, Pitman Publishing, London, 1998.
  7. H. Stadtler, "Basics of Supply Chain Management," In: Stadtler, H., Kilger, C. (Eds.), Supply Chain Management and Advanced Planning-Concepts, Models, Software and Case Studies, Springer, Berlin, pp.7-28, 2005.
  8. B. Fleischmann and H. Meyr, Planning Hierarchy, Modeling and Advanced Planning Systems (Chapter 9), A. G. de Kok and S. C. Graves, Eds., Handbooks in OR & MS, Vol.11, Elsevier B. V., 2003.
  9. www.sap.com/solution/lob/scm.html
  10. www.oracle.com/applications/supply-chain-management/
  11. H. Stadtler and C. Kilger (Eds.), Supply Chain Management and Advanced Planning-Concepts, Models, Software and Case studies, Springer, Berlin, 2005.
  12. Y. Cai, E. Kutanoglu, and J. Hasenbein, Production Planning and Scheduling: Interaction and Coordination (Chapter2), K. G. Kempf et al. (eds.), Springer, 2011.
  13. M. Fera, F. Fruggiero, A. Lambiase, G. Martino, and M. F. Nenni, Production Scheduling Approaches for Operations Management, www.intechopen.com, 2013.
  14. C. J. Lin and M. L. Huang, "Modified artificial bee colony algorithm for scheduling optimization for printed circuit board production," Journal of Manufacturing Systems, Vol.44, No.1, pp.1-11, 2017. https://doi.org/10.1016/j.jmsy.2017.04.006
  15. S. Z. hang and T. N. Wong, "Integrated process planning and scheduling: an enhanced ant colony optimization heuristic with parameter tuning," Journal of Intelligent Manufacturing, Vol.29, No.3, pp.585-601, 2018. https://doi.org/10.1007/s10845-014-1023-3
  16. K. Ko, S. K. Yoo, B. H. Kim, B. C. Park, and E. S. Park, "Simulation Based Fab Scheduler: SeePlan," Proceedings of the 2010 Winter Simulation Conference, pp.40-48, Baltimore, Dec. 2010.
  17. K. Ko, B. H. Kim, and S. K. Yoo, "Simulation Based Planning & Scheduling System: Mozart," Proceedings of the 2013 Winter Simulation Conference, pp.4103-4104, Washington DC, Dec. 2013.
  18. B. C. Park, B. K. Choi, and E. S. Park, "Simulation Based Planning and Scheduling System for TFT-LCD Fab," Proceedings of the 2008 Winter Simulation Conference, pp.2271-2276, Miami FL, Dec. 2008.
  19. Y. H. Chung, S. C. Park, B. H. Kim, and J. C. Seo, "Due Date Control in Order-Driven Fab with High priority Orders," Proceedings of the 2014 Winter Simulation Conference, pp.2544-2551, Savannah, Georgia, Dec. 2014.
  20. www.ibm.com/analytics/data-science/prescriptive-analytics/cplex-optimizer