• Title/Summary/Keyword: scheduling management

Search Result 1,280, Processing Time 0.024 seconds

An Algorithm for Resource-Unconstrained Earliness-Tardiness Problem with Partial Precedences (자원 제약이 없는 환경에서 부분 우선순위를 고려한 Earliness-Tardiness 최적 일정계획 알고리즘)

  • Ha, Byung-Hyun
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.38 no.2
    • /
    • pp.141-157
    • /
    • 2013
  • In this paper, we consider the minimization of the total weighted earliness-tardiness penalty of jobs, regarding the partial precedences between jobs. We present an optimal scheduling algorithm in O(n(n+m log m)) where n is the number of jobs and m is the number of partial precedences. In the algorithm, the optimal schedule is constructed iteratively by considering each group of contiguous jobs as a block that is represented by a tree.

Flow-shop Scheduling Problem with Weighted Work-In-Process

  • Yang, Jae-Hwan
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.193-206
    • /
    • 2005
  • This paper considers a new flow-shop scheduling problem where a different WIP (work-in-process) state has different weight on the duration time. For the two machine case, the recognition version is NP-Complete in the strong sense. Several special cases are solved by different polynomial time algorithms. Finally, we develop a heuristic and provide an upper-bound on relative error which is tight in limit.

  • PDF

Multi-product, multi-site production and transportation scheduling problem (다품종 복수공장 생산에서의 생산분배 및 수송계획 문제연구)

  • 장병만
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1993.04a
    • /
    • pp.36-45
    • /
    • 1993
  • This paper presents a model and a heuristic procedure to design production planning and transportation scheduling systems of critical items, components and products on the basis of material requirement planning concept and transportation planning model. These systems are stemmed from a multi-site multi-product production company in a international economic zone. An example is provided to validate the heuristic procedure developed.

  • PDF

On-line 스케줄링을 고려한 off-line 스케줄링

  • 김경훈;김영호;강석호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1997.10a
    • /
    • pp.162-165
    • /
    • 1997
  • 본 연구에서는 off-line 스케쥴링과 on-line 스케쥴링을 함께 고려하는 스케쥴링 메카니즘에 대해 설명하였다. 일반적으로 스케쥴링은 off-line 문제를 주로 다룬다. 그러나, off-line으로 생성된 스케쥴은 실시간으로 발생하는 여러 문제들(기계 고장, 긴급 주문등) 때문에 현실과 맞지 않게 되어 유용성이 떨어지는 경우가 자주 발생한다. 따라서 off-line 스케쥴링의 결과를 수행할때 위와 같은 문제가 발생할 경우, 스케쥴의 변화를 흡수하면서 off-line 스케쥴링의 결과를 최대한 유지할수 있는 on-line 스케쥴링에서 이 같은 스케쥴 실행시의 문제를 해결할 수 있도록 bidding 알고리즘을 사용하는 방법을 제시하였다.

  • PDF

Bottleneck Scheduling for Cycletime Reduction in Semiconductor Fabrication Line (반도체 FAB공정의 사이클타임 단축을 위한 병목일정계획)

  • 이영훈;김태헌
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.298-301
    • /
    • 2001
  • In semiconductor manufacturing, wafer fabrication is the most complicated and important process, which is composed of several hundreds of process steps and several hundreds of machines involved. The productivity of the manufacturing mainly depends on how well they control balance of WIP flow to achieve maximal throughput under short manufacturing cycle time. In this paper mathematical formulation is suggested for the stepper scheduling, in which cycle time reduction and maximal production is achieved.

  • PDF

Network Enlarging Search Technique (NEST) for the Crew Scheduling Problem

  • Paek, Gwan-Ho
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.19 no.2
    • /
    • pp.177-198
    • /
    • 1994
  • We consider an algorithm for the Crew Scheduling Problem (CSP) based on the Transportation Problem approach. The main flows of the algorithm are arranged in three steps. First we propose a heuristic algorithm of the greedy principle to obtain an initial feasible solution. Secondary we present a method of formulating CSP into a Modified Transportation Problem format. Lastly the procedures of network search to get the optimal solution are presented. This algorithm can be applied to the general GSP and also to most combinatorial problems like the Vehicle Routing Problems. The computational results show that the large size CSP's could be tackled.

  • PDF

Selection of Assembly Sequences Based on Flexible Assembly Systems Performance

  • Jeong, Bong-Ju
    • Management Science and Financial Engineering
    • /
    • v.1 no.1
    • /
    • pp.67-90
    • /
    • 1995
  • In planning an assembly system, choosing the proper assembly sequence is one of the most important decisions because it significantly affects the costs associated with the assembly process. This paper deals with the selection of assembly sequences in flexible assembly systems. The selection criterion is the minimization of makespan to complete all assembly products. This problem is formulated as a "modified FAS scheduling problem" (MFASSP) and its scheduling procedure is described. The experimental results show that the procedure is very efficient for both quality of solution and computation time.

  • PDF

Multi-objective Scheduling with Stochastic Processing Times

  • Jung, Young-Sik
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.1
    • /
    • pp.179-193
    • /
    • 1995
  • A multi-objective, single-stage scheduling problem with stochastic processing times is considered where the objective is to simultaneously minimize the expected value and the variance of total flowtime, and the mean probability of tardiness. In cases where processing times follow normal distributions, a method using pairwise interchange of two jobs(PITJ) is proposed to generate a set of the approximate efficient schedules. The efficient schedules are not dominated by the criterion vectors of any other permutation schdules in the feasible region. Numerical experiments performed to ascertain the effectiveness of PITJ algorithm are also reported in the results.

  • PDF

Next station selection rules for FMS scheduling against due-date (납기를 고려한 FMS 일정계획에서의 기계선정규칙)

  • 문일경;김태우
    • Korean Management Science Review
    • /
    • v.13 no.2
    • /
    • pp.147-161
    • /
    • 1996
  • Due-date is an important factor in Flexible Manufacturing System scheduling. Even though most of researchers have focused part selection and loading problem using fixed due-date assignment rules, FMSs consist of multi-function machines which facilitate alternative processes. This research investigates interactions of three dispatching mechanisms, three NSS (Next Station Selection) rules and four due-date assignment rules using simulation. Both cost-based and time-based performance measures are considered in this research.

  • PDF

An optimization model for scheduling unloading operations at an integrated steel mill (일관제철소 원료 부두 하역 일정계획 최적화 모형)

  • Jang, Su-Yeong;Kim, Byeong-In
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.11a
    • /
    • pp.273-276
    • /
    • 2006
  • At an integrated steel mill, various raw material such as coal and iron ore are unloaded from a large ship. The unloaded raw material is then transported to storage yards through a complex belt conveyer network. We propose an optimization model for scheduling the unloading operations under the limitations of available berths, unloading equipments and transportation capacity of the belt conveyer network. We show that the problem is NP-Hard and propose a heuristic approach to the problem.

  • PDF