• Title/Summary/Keyword: scheduling management

Search Result 1,280, Processing Time 0.028 seconds

Productivity Analysis of Tunnel Muck Hauling Operations (터널 버력처리 공정의 생산성 분석;경부고속철도 원효터널을 중심으로)

  • Hwang, Ho-Jung;Kang, Chan-Sung;Kim, Kyoung-Min;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.827-831
    • /
    • 2007
  • For applying simulation to the construction process, much effort is needed to collect input data and to build the model including the characteristics of site. This study introduces the methodology to collect operation data of construction equipment and build the simulation model, then verifies the model with the operation data. In addition, this study identifies main factors to determine the cycle time of the muck hauling system and offers reasonable decision making data using the simulation based planning of construction equipment operation.

  • PDF

Congestion Detection for QoS-enabled Wireless Networks and its Potential Applications

  • Ramneek, Ramneek;Hosein, Patrick;Choi, Wonjun;Seok, Woojin
    • Journal of Communications and Networks
    • /
    • v.18 no.3
    • /
    • pp.513-522
    • /
    • 2016
  • We propose a mechanism for monitoring load in quality of service (QoS)-enabled wireless networks and show how it can be used for network management as well as for dynamic pricing. Mobile network traffic, especially video, has grown exponentially over the last few years and it is anticipated that this trend will continue into the future. Driving factors include the availability of new affordable, smart devices, such as smart-phones and tablets, together with the expectation of high quality user experience for video as one would obtain at home. Although new technologies such as long term evolution (LTE) are expected to help satisfy this demand, the fact is that several other mechanisms will be needed to manage overload and congestion in the network. Therefore, the efficient management of the expected huge data traffic demands is critical if operators are to maintain acceptable service quality while making a profit. In the current work, we address this issue by first investigating how the network load can be accurately monitored and then we show how this load metric can then be used to provide creative pricing plans. In addition, we describe its applications to features like traffic offloading and user satisfaction tracking.

Microgrid energy scheduling with demand response

  • Azimian, Mahdi;Amir, Vahid;Haddadipour, Shapour
    • Advances in Energy Research
    • /
    • v.7 no.2
    • /
    • pp.85-100
    • /
    • 2020
  • Distributed energy resources (DERs) are essential for coping with growing multiple energy demands. A microgrid (MG) is a small-scale version of the power system which makes possible the integration of DERs as well as achieving maximum demand-side management utilization. Hence, this study focuses on the analysis of optimal power dispatch considering economic aspects in a multi-carrier microgrid (MCMG) with price-responsive loads. This paper proposes a novel time-based demand-side management in order to reshape the load curve, as well as preventing the excessive use of energy in peak hours. In conventional studies, energy consumption is optimized from the perspective of each infrastructure user without considering the interactions. Here, the interaction of energy system infrastructures is considered in the presence of energy storage systems (ESSs), small-scale energy resources (SSERs), and responsive loads. Simulations are performed using GAMS (General Algebraic modeling system) to model MCMG, which are connected to the electricity, natural gas, and district heat networks for supplying multiple energy demands. Results show that the simultaneous operation of various energy carriers, as well as utilization of price-responsive loads, lead to better MCMG performance and decrease operating costs for smart distribution grids. This model is examined on a typical MCMG, and the effectiveness of the proposed model is proven.

PD-DESYNC: Practical and Deterministic Desynchronization in Wireless Sensor Networks

  • Hyun, Sang-Hyun;Kim, Geon;Yang, Dongmin
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.13 no.8
    • /
    • pp.3880-3899
    • /
    • 2019
  • Distributive desynchronization algorithms based on pulse-coupled oscillator (PCO) models have been proposed for achieving collision-free wireless transmissions. These algorithms do not depend on a global clock or infrastructure overheads. Moreover, they gradually converge to fair time-division multiple access (TDMA) scheduling by broadcasting a periodic pulse signal (called a 'firing') and adjusting the next firing time based on firings from other nodes. The time required to achieve constant spacing between phase neighbors is estimated in a closed form or via stochastic modeling. However, because these algorithms cannot guarantee the completion of desynchronization in a short and bounded timeframe, they are not practical. Motivated by the limitations of these methods, we propose a practical solution called PD-DESYNC that provides a short and deterministic convergence time using a flag firing to indicate the beginning of a cycle. We demonstrate that the proposed method guarantees the completion of desynchronization within three cycles, regardless of the number of nodes. Through extensive simulations and experiments, we confirm that PD-DESYNC not only outperforms other algorithms in terms of convergence time but also is a practical solution.

The Correlation between Online Comments before Broadcasting and Television Content Viewers' Behavior Pattern: The Anchoring Effect Perspective

  • Ma, Alice Kyoungran;Ahn, Jongchang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.13 no.6
    • /
    • pp.3023-3036
    • /
    • 2019
  • This study investigated the television (TV) content viewers' behavior influenced by online communication at the choice of new TV series on a terrestrial streaming platform. For exploring the impact of the anchoring effect on the TV content consumption, this study analyzed the correlation between the first episode's TV ratings and the data of online comments or reactions. These data were potential audiences' communication, which were generated on the online article three weeks before the first broadcasting began. To avoid the crucial influence by external factors, such as season and social issue, the test was done with eight (8) TV series which have same genre (drama), similar core audience targeting (20-49's women), similar broadcasting period (Jun-Oct 2016), same scheduling (10.00 to 11.00 pm, weekdays) and aired on terrestrial TV platforms. This research found that not only the amount of comments and reactions, but also the attitude about the comments created before broadcasting, positively influence the audiences' decision-making behavior for new TV content choices. This investigation contributes to the literature on media economics and management by exploring the media content users' consuming behavior with behavioral economics perspectives (anchoring effect) and making a first step for finding a new effect on the media content consumption.

A Theoretical Examination on Appraisal System of Public Records in Korea : Comparative Study on Archival Selection and Concepts of Values (공공기록물의 평가체제에 대한 이론적 검토 -선별 방식 및 가치 범주를 중심으로-)

  • Kim, Myoung-hun
    • The Korean Journal of Archival Studies
    • /
    • no.6
    • /
    • pp.3-40
    • /
    • 2002
  • Appraisal is a basic archival function that analyzes values of records and determines the eventual disposal of records based upon their archival values. In Korea, this appraisal concept introduces in earnest through Public Records and Archives Act(PRA, 공공기관의 기록물관리에관한법률) with which Korean record management systems settle inflexibly. In theoreical and methodological area, therefore, it is necessary to analyze appraisal system in this Act with it in archival science. In PRA Act, appraisal system is founded on the Tables of Transaction for Records Scheduling(TRS, 기록물분류기준표) through which disposal activities of all records are definited in a concrete form. In this system, selection of archival materials which has been recognized as a important function of record center is carried out by record creators and archival institutions; Primary value between semi-currenty and non-currenty are reflected at the same time. In view of values, this appraisal system intends to separate reasonably consideration for continuing utility of achives from current use of records throughout agencies duration. Ultimately, appraisal based upon TRS makes up not separated management course but organic courses reflecting the Continuum of Care. Of course, this appraisal system makes up the deficiency partially. TRS regarded as 'mainboard' of current appraisal system will have to be enacted elaborately. And appraisal strategies of electronic records must set up in detail in PRA Act and TRS. Lastly, arrangement and description concepts immanent in TRS will have to supplement in archival institutions.

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

Ontology for estimating excavation duration for smart construction of hard rock tunnel projects under resource constraint

  • Yang, Shuhan;Ren, Zhihao;Kim, Jung In
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.222-229
    • /
    • 2022
  • Although stochastic programming and feedback control approaches could efficiently mitigate the overdue risks caused by inherent uncertainties in ground conditions, the lack of formal representations of planners' rationales for resource allocation still prevents planners from applying these approaches due to the inability to consider comprehensive resource allocation policies for hard rock tunnel projects. To overcome the limitations, the authors developed an ontology that represents the project duration estimation rationales, considering the impacts of ground conditions, excavation methods, project states, resources (i.e., given equipment fleet), and resource allocation policies (RAPs). This ontology consists of 5 main classes with 22 subclasses. It enables planners to explicitly and comprehensively represent the necessary information to rapidly and consistently estimate the excavation durations during construction. 10 rule sets (i.e., policies) are considered and categorized into two types: non-progress-related and progress-related policies. In order to provide simplified information about the remaining durations of phases for progress-related policies, the ontology also represents encoding principles. The estimation of excavation schedules is carried out based on a hypothetical example considering two types of policies. The estimation results reveal the feasibility, potential for flexibility, and comprehensiveness of the developed ontology. Further research to improve the duration estimation methodology is warranted.

  • PDF

Activity Segmentation and 3D-Visualization of Pusher-Loaded Earthmoving Operations from Position Data

  • Ahn, Sanghyung;Dunston, Phillip S.;Kandil, Amr;Martinez, Julio C.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.328-332
    • /
    • 2015
  • By logging position data from GPS-equipped construction machines, we re-create daily activities as 3D animations to analyze performance and facilitate look-ahead scheduling. The 3D animation enables going back to any point in time and space to observe the activities as they took place. By segmenting data into a set of activities, it is possible to obtain actual measures of performance such as cycle times, production, speed profiles and idle times. The measures of performance can then be compared to those expected (e.g., theoretical speed profiles vs. observed profiles), and instances of significant difference can be flagged for further investigation. Idle times and queues that exceed prescribed thresholds can also be identified. In general, many of the traditional real-time performance analyses can be performed after the fact. Situations of interest can be identified automatically and the events in this manner enhances effective performance improvement in construction. The proposed research is explained and demonstrated using a real push-loaded earthmoving operation.

  • PDF

SYSTEM MODELLING OF ON-SITE ENERGY CONSUMPTION PROFILE IN CONSTRUCTION SITES AND A CASE STUDY OF EARTH MOVING

  • Kyoo-Jin Yi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.287-293
    • /
    • 2013
  • The annual expenditure on diesel oil and heavy oil in the construction sector is the second largest among all industrial sectors. According to the greenhouse reduction scheme of Korean Government, construction sector targeted 7.1% reduction by 2020. Although this target is not higher than other industrial sectors, it is not easy to achieve the reduction target without radical advance in technology, which cannot be expected to happen soon, considering the conservative characteristics of construction industry. Most researches on environmental issues focus on the issues related to energy saving matters during material production stage or maintenance stage, such as heating and insulation, and few deal with the issues directly related to the energy use in the construction sites. This research regards the operation of equipment for the on-site construction processes as a system and attempts to model the energy use processes related to the activities in construction sites, and provides simulation results of earth excavation and hauling processes. The result of this research is expected to aid construction planners estimating the time-based patterns of energy use and assessing greenhouse gas emission and to help selecting more energy efficient alternatives at the planning stage.

  • PDF