• 제목/요약/키워드: scheduling management

검색결과 1,280건 처리시간 0.021초

NEW TREND OF SCHEDULING IN LINEAR CONSTRUCTION PROJECT

  • S. Sankar;J. Senthil
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.917-923
    • /
    • 2005
  • Scheduling is one of the main functions in construction project to determine the sequence of activities necessary to complete a project. The scheduling techniques provide important information crucial to a project's success. Highway construction project the paving activity can be considered a linear activity. Linear scheduling technique may be better suited for linear projects than other scheduling techniques. A new type of scheduling in linear project is calling Linear Scheduling Model (LSM). The Project monitoring and controlling is very ease to identify that all the stage of linear project and have more advantages.

  • PDF

건설 공정관리 솔루션의 활용성 증대를 위한 공정표 작성 지원 프로그램 개발 (Development of a Scheduling Assistant Program for Usability Improvement of Construction Scheduling Solutions)

  • 박성환;이시욱;우성권;신도형
    • 대한토목학회논문집
    • /
    • 제30권4D호
    • /
    • pp.413-421
    • /
    • 2010
  • 공정관리는 건설 프로젝트의 효율적인 수행을 위한 핵심 역량 중의 하나이다. 공정관리를 수행하기 위한 지원 도구로서 많은 상용 공정관리 솔루션이 개발되었지만, 건설 현장에서는 사용법을 잘 알지 못하고 있는 등 여러 가지 이유로 인해 활용도가 높지 않은 것이 현실이다. 본 연구에서는 설문조사를 통해 공정관리 및 관련 솔루션 사용에 관한 현황 및 문제점을 파악하고, 이를 기반으로 상용 공정관리 솔루션 활용도를 높이기 위한 공정표 작성 지원 프로그램을 개발하였다. 개발된 프로그램을 통하여 현장에서의 상용 공정관리 솔루션의 활용성을 높이고, 결과적으로 효율적인 공정관리를 기대할 수 있을 것이다.

작업준비시간이 없는 이종 병렬설비에서 총 소요 시간 최소화를 위한 미미틱 알고리즘 기반 일정계획에 관한 연구 (A Study on Memetic Algorithm-Based Scheduling for Minimizing Makespan in Unrelated Parallel Machines without Setup Time)

  • 이태희;유우식
    • 대한안전경영과학회지
    • /
    • 제25권2호
    • /
    • pp.1-8
    • /
    • 2023
  • This paper is proposing a novel machine scheduling model for the unrelated parallel machine scheduling problem without setup times to minimize the total completion time, also known as "makespan". This problem is a NP-complete problem, and to date, most approaches for real-life situations are based on the operator's experience or simple heuristics. The new model based on the Memetic Algorithm, which was proposed by P. Moscato in 1989, is a hybrid algorithm that includes genetic algorithm and local search optimization. The new model is tested on randomly generated datasets, and is compared to optimal solution, and four scheduling models; three rule-based heuristic algorithms, and a genetic algorithm based scheduling model from literature; the test results show that the new model performed better than scheduling models from literature.

공정관리 지식기반 구축을 위한 기초적 연구 (A Basic Study for Accumulating Scheduling Knowledge-Base)

  • 장세한;김경래
    • 한국건설관리학회논문집
    • /
    • 제2권3호
    • /
    • pp.83-91
    • /
    • 2001
  • 1990년 중반부터 지식(Knowledge)은 국가 및 기업 경쟁력의 원천으로 부상하고 있으며, 건설기업의 공정관리는 건설기업의 핵심 역량 중의 하나이다. 그러나 국내 건설기업은 공정관리에 대한 지식을 체계적으로 저장, 활용하지 못하고 있는 실정이다. 국내 건설기업의 공정관리 지식기반화에 대한 수준은 공정관리 지식기반 인프라 구축 단계에 머물러 있으며, 상위 건설기업 조차도 공정관리 지식 활동 단계의 초기 수준에 머물러 있다. 이는 공정관리 지식의 중요성에 대한 인식 부재, 관련 절차의 부재가 원인이라고 할 수 있을 것이다. 본 연구에서는 건설기업의 공정관리 지식기반화의 문제점을 분석한 후, 건설기업 차원에서 현행 공정관리 표준 절차서의 내용에 공정관리 지식기반 인프라 요소와 공정관리 지식 활동 요소를 보안할 수 있는 공정관리 지식기반화를 위한 공정관리 절차서 모델을 제시하였다. 본 연구의 결과물인 공정관리 지식기반화를 위한 절차서 모델을 통해, 국내 건설기업이 공정관리 지식 활동의 절차를 마련할 수 있는 방안을 제시하고, 추후 국내 건설기업의 건설통합시스템 및 KMS(Knowledge Management System)과의 연계를 위한 공정관리 지식 기반의 구축의 틀을 마련하고자 한다.

  • PDF

A PROACTIVE APPROACH FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS

  • Balasubramanian Kanagasabapathi;Kuppusamy Ananthanarayanan
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.744-747
    • /
    • 2005
  • The AEC (Architecture/Engineering/Construction) industry is facing a competitive world after it entered into the 21st century. Due to improper planning and scheduling, the construction projects face severe delays in completion. Most of the present day construction organisations operate in multiple project environments where more than one projects are to be managed simultaneously. But the advantages of planning and scheduling as multiple projects have not been utilized by these organisations. Change in multi-project planning and scheduling is inevitable and often frequent, therefore the traditional planning and scheduling approaches are no more feasible in scheduling multiple construction projects. The traditional scheduling tools like CPM and PERT do not offer any help in scheduling in a resource-constrained environment. This necessitated a detailed study to model the environment realistically and to make the allocation of limited resources flexible and efficient. This paper delineates about the proactive model which will help the project managers for scheduling the multiple construction projects.

  • PDF

A Modular Decomposition Model for Software Project Scheduling

  • Kim, Kiseog;Nag, Barin N.
    • 한국경영과학회지
    • /
    • 제18권3호
    • /
    • pp.129-149
    • /
    • 1993
  • The high level of activity in the development and maintenance of computer software makes the scheduling of software projects an importnat factor in reducing operating costs and increasing competitiveness. Software activity is labor intensive. Scheduling management of hours of software work is complicated by ther interdependencies between the segments of work, and the uncertainties of the work itself. This paper discusses issues of scheduling in software engineering management, and presents a modular decomposition model for software project scheduling, taking advantage of the facility for decomposition of a software project into relatively independent work segment modules. Modular decomposition makes it possible to treat scheduling as clustering and sequencing in the context of integer programming. A heuristic algorithm for the model is presented with some computational experiments.

  • PDF

APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION

  • Fitria H. Rachmat;Lingguang Song;Sang-Hoon Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.907-913
    • /
    • 2009
  • Pipeline construction is a highly repetitive and resource-intensive process that is exposed to various constraints and uncertainties in the working environment. Effective look-ahead scheduling based on the most recent project performance data can greatly improve project execution and control. This study enhances the traditional linear scheduling method with stochastic simulation to incorporate activity performance uncertainty in look-ahead scheduling. To facilitate the use of this stochastic method, a computer program, Stochastic Linear Scheduling Method (SLSM), was designed and implemented. Accurate look-ahead scheduling can help schedulers to better anticipate problem areas and formulate new plans to improve overall project performance.

  • PDF

공간 일정 계획의 이슈들과 접근방법 (Issues and approaches to spatial scheduling)

  • 이경전;이재규
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1995년도 춘계공동학술대회논문집; 전남대학교; 28-29 Apr. 1995
    • /
    • pp.758-759
    • /
    • 1995
  • In large-scale industry such as shipbuilding, aircraft manufacturing, and construction industry etc., it is required to consider two or three-dimensional spatial availability as one of bottlenecked resource constraints. We call this kind of scheduling a spatial scheduling, which considers the dynamic spatial layouts of objects as well as the traditional resource constraints. Since 1991, we have researched on the spatial scheduling for shipbuilding plant (Lee & Lee, 1992; Lee et al., 1994, Lee et al., 1995). In this paper, we present the various issues of spatial scheduling for the researchers and developers attacking spatial scheduling problems.

  • PDF

건설공사 진도관리의 현황 분석에 대한 연구 (Analysis of Construction Schedule Progress Management Practice)

  • 신윤경;윤석현;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.207-211
    • /
    • 2010
  • As mega-sized and complex building construction projects are increased, the importance of project scheduling and control is emphasized. Project scheduling and control technic is not used widely yet in Korea, but interests in it is progressively increased. By now, most research projects mainly have focused on scheduling issues. Project progress management is also as much important as project scheduling issues. Current state about project progress management in Korea is analysed and way for improvements are suggested in this paper. At first, research projects undergone and practice are analysed and fields experts are survey about current state about project progress management. This study suggests the progress management method for quantitative and qualitative project progress analysis.

  • PDF

중소 제조기업을 위한 엑셀기반 스케쥴링 시스템 (An Excel-Based Scheduling System for a Small and Medium Sized Manufacturing Factory)

  • 이창수;최경일;송영효
    • 품질경영학회지
    • /
    • 제36권2호
    • /
    • pp.28-35
    • /
    • 2008
  • This study deals with an Excel-based scheduling system for a small and medium sized manufacturing factory without sufficient capability for managing full-scale information systems. The factory has the bottleneck with identical machines and unique batching characteristics. The scheduling problem is formulated as a variation of the parallel-machine scheduling system. It can be solved by a two-phase method: the first phase with an ant colony optimization (ACO) heuristic for order grouping and the second phase with a mixed integer programming (MIP) algorithm for scheduling groups on machines.