본 논문에서는 단일 임무운용 개념에서 벗어나 향후 다수의 위성들을 동시에 직접 제어 하거나, 임무가 상이하더라도 주요 핵심시스템을 근간으로 각 위성마다 소요되는 임무운용 시스템을 개발함에 있어 개발기간을 획기적으로 줄일 수 있는 차세대 통합형 임무운용시스템 개발을 위한 분석 및 설계결과를 기술하였다. 이를 위해 우주개발선진국들의 통합지향형 임무운용시스템 개발 추세 및 개발 동향을 살펴보고, 각 시스템들의 주요 기능을 수행하는 공통 핵심시스템의 구조도 분석하였으며 설계 결과를 제시하였다.
In this paper, an integration of stochastic dynamic programming (SDP), integer goal programming (IGP) and analytic hierarchy process (AHP) is proposed to handle multiobjective-multicriteria sequential decision making problems under uncertainty inherent in R & D investment planning. SDP has its capability to handle problems which are sequential and stochastic. In the SDP model, the probabilities of the funding levels in any time period are generated using a subjective model which employs functional relationships among interrelated parameters, scenarios of future budget availability and subjective inputs elicited from a group of decision makers. The SDP model primarily yields an optimal investment planning policy considering the possibility that actual funding received may be less than anticipated one and thus the projects being selected under the anticipated budget would be interrupted. IGP is used to handle the multiobjective issues such as tradoff between economic benefit and technology accumulation level. Other managerial concerns related to the determination of the optimal project portifolio within each stage of the SDP model. including project selection, project scheduling and annual budget allocation are also determined by the IGP. AHP is proposed for generating scenario-based transformation probabilities under budgetary uncertainty and for quantifying the environmental risk to be considered.
Wireless Video Sensor Networks (WVSNs) have become a leading solution in many important applications, such as disaster recovery. By using WVSNs in disaster scenarios, the main goal is achieving a successful immediate response including search, location, and rescue operations. The achievement of such an objective in the presence of obstacles and the risk of sensor damage being caused by disasters is a challenging task. In this paper, we propose a fault tolerance model of WVSN for efficient post-disaster management in order to assist rescue and preparedness operations. To get an overview of the monitored area, we used video sensors with a rotation capability that enables them to switch to the best direction for getting better multimedia coverage of the disaster area, while minimizing the effect of occlusions. By constructing different cover sets based on the field of view redundancy, we can provide a robust fault tolerance to the network. We demonstrate by simulating the benefits of our proposal in terms of reliability and high coverage.
The 9th International Conference on Construction Engineering and Project Management
/
pp.1254-1254
/
2022
The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.
An, Dawn;Choi, Joo-Ho;Kim, Nam H.;Pattabhiraman, Sriram
Structural Engineering and Mechanics
/
제37권4호
/
pp.427-442
/
2011
In fatigue life design of mechanical components, uncertainties arising from materials and manufacturing processes should be taken into account for ensuring reliability. A common practice is to apply a safety factor in conjunction with a physics model for evaluating the lifecycle, which most likely relies on the designer's experience. Due to conservative design, predictions are often in disagreement with field observations, which makes it difficult to schedule maintenance. In this paper, the Bayesian technique, which incorporates the field failure data into prior knowledge, is used to obtain a more dependable prediction of fatigue life. The effects of prior knowledge, noise in data, and bias in measurements on the distribution of fatigue life are discussed in detail. By assuming a distribution type of fatigue life, its parameters are identified first, followed by estimating the distribution of fatigue life, which represents the degree of belief of the fatigue life conditional to the observed data. As more data are provided, the values will be updated to reduce the credible interval. The results can be used in various needs such as a risk analysis, reliability based design optimization, maintenance scheduling, or validation of reliability analysis codes. In order to obtain the posterior distribution, the Markov Chain Monte Carlo technique is employed, which is a modern statistical computational method which effectively draws the samples of the given distribution. Field data of turbine components are exploited to illustrate our approach, which counts as a regular inspection of the number of failed blades in a turbine disk.
건설사업 수행에서 정해진 공사기간은 가장 중요하게 이행 및 관리되어야 하는 것으로, 공정관리를 건설사업관리의 최우선으로 두고 있으나, 최근 공공건설사업, 특히 토목사업의 대부분에서 공사기간이 연장되고 있고, 그 비용 또한 막대하여 이에 대한 시급한 대책이 요구되고 있는 실정이다. 공사기간연장에 대한 예방 및 해결의 문제는 어제오늘의 문제가 아니라 오랜 시간 동안 많은 연구를 통하여 그 문제점과 해결방안을 제시해 왔다. 그러나 문제점의 근본이 되는 공기연장사유에 대한 연구가 없었다. 이는 공기연장예방과 해결의 핵심으로서 이에 대한 구체적인 분석이 없이는 관리 및 해결방안은 형식적일 수밖에 없음은 자명하다. 사업의 특성에 따라 관련 RISK는 다르고, 연장사유 역시 사업특성에 따라 동일하지 않음이 분명한 바, 본 연구에서는 공종별 특성, 계약유형별 특성, 사업수행주체별 특성, 계약조건상의 특성 등을 비교하여 그 상이함을 도출하였고, 이는 공기연장예방 및 클레임해결과 연관하여 중점사유 대상선정, 사전적 관리 및 해결방안 도출 등의 연구에 기여할 수 있을 것이다.
Summary: We report the first hepatic adverse effect of tosufloxacin tosylate in a muscle invasive bladder cancer patient with normal liver functions and with scheduling to undergo a surgical operation for a neobladder. Tosufloxacin tosylate 150 mg was administered to a 57-year-old man who maintained transurethral resection of bladder tumor (TUR-BT) postoperative multiple medications. His labs presented significant increases in alanine amino transferase (ALT) and aspartate amino transferase (AST) levels with 2-week compliance of 150 mg tablet three times a day. After discontinuing tosufloxacin tosylate, the levels slowly decreased and completely returned to normal ranges without any intervention in a few weeks. The Naranjo Causality Algorithm indicates a probable relationship between increased ALT and tosufloxacin. The patient was to have the second surgical operation as scheduled after getting normal range of ATL level. Therefore, tosufloxacin should be avoided in patients at risk for having liver dysfunctions or diseases if the patients have a schedule for any operation. Background: Tosufloxacin tosylate has been shown to have favorable benefits as an antibiotic. Tosufloxacin tosylate may be considered to have the adverse effects such as nauseas, vomiting, diarrhea, abdominal pain, stomatitis, tendonitis, tendon rupture, headache, dizziness, drowsiness, insomnia, weakness, agitation including hemolysis in the event of glucose-6-phosphate dehydrogenase deficiency as other fluoroquinolones. More severe adverse reactions of tosufloxacin tosylate over the above common adverse effects of fluoroquinolones were thrombocytopenia and nephritis. It also is not well known that tosufloxacin can cause hepatic problem. Here the study reports the first hepatic reaction from tosufloxacin and might arouse heath care providers' attention to appropriate drug choice for patients.
One of the important applications in Enterprise Resource Planning(ERP) systems is the Manufacturing Resource Planning(MRPII) system using Bill of Material(BOM). The manufacturing resource planning determines the quantity and timing of the production or purchase of subassemblies and raw materials needed to support the Master Production Scheduling(MPS). The bill of material is the recipe, a list of the materials needed to make a product. This paper intends to suggest a component-based materials management system using Unified Modeling Language(UML), as an application system for automobile part industry. Applying component based materials management systems designed with UML methodology, we analyzed the workflow and the document on materials management process from production planning to inventory management, and implemented a prototype of efficient materials management system, as a surrogate of existing material requirement planning(MRPI) system. To produce many other assemblies for a automobile part firm, component parts are assembled into subassemblies that are joined to assemble the finished product. Through the system suggested in this study, the level of inventory has cut down and the cost of inventory management has decreased. Also, the development method using UML makes the analysis and design phase to shorten in implementation period of MRPII system. The implementation of materials management system using CBD shows the ease of use in software reuse and the interoperability with corporate Internal information system. The result of applying object-oriented CBD technique is to minimize the risk of life cycle and facilitate the reuse of software as mentioned to limitation of information engineering methodology.
플랜트건설 산업은 엔지니어링과 기계설비의 조달, 시공이 융합된 복합산업(EPC)으로 건설업체의 수주에 따라 기계 ${\cdot}$ 설비 등 타 분야의 성장을 함께 도모할 수 있는 높은 고부가가치 산업이다. 따라서 플랜트건설 수주의 증대는 향후 건설업체뿐만 아니라 국가경제 전반의 성장에 지대한 영향을 끼치는 중요한 이슈이다. 특히, 근래에 중동지역의 경우 고유가에 자극 받은 국가들의 가스와 석유화학 등의 시설에 대한 지속적인 투자로 플랜트 분야의 수요가 급증하는 등 해외 건설시장에서의 플랜트 분야의 시장이 매우 성장하고 있다. 하지만 국내의 해외플랜트 건설업체들이 미국, 유럽 및 일본의 선진기업들과의 경쟁에서 우의를 점하여, 매출과 이윤을 늘리고 꾸준히 사업을 영위하기 위해서는 플랜트 건설산업의 국제 경쟁력을 조속히 확보하는 것이 필요하다. 따라서 본 연구는 해외 건설시장에서 국내 플랜트 관련 업체들의 프로젝트 수행기술 전반을 향상시켜 지속적인 경쟁력을 확보하기 위하여 플랜트 건설사업의 각종 표준과 프로젝트 관리 및 정보관리체계 등 플랜트 프로젝트 관리의 선진화된 기술을 개발하고자 한다.
Load distribution is vital to the performance of multipath transport. The task becomes more challenging in real-time multimedia applications (RTMA), which impose stringent delay requirements. Two key issues to be addressed are: 1) How to minimize end-to-end delay and 2) how to alleviate packet reordering that incurs additional recovery time at the receiver. In this paper, we propose sub-packet based multipath load distribution (SPMLD), a new model that splits traffic at the granularity of sub-packet. Our SPMLD model aims to minimize total packet delay by effectively aggregating multiple parallel paths as a single virtual path. First, we formulate the packet splitting over multiple paths as a constrained optimization problem and derive its solution based on progressive approximation method. Second, in the solution, we analyze queuing delay by introducing D/M/1 model and obtain the expression of dynamic packet splitting ratio for each path. Third, in order to describe SPMLD's scheduling policy, we propose two distributed algorithms respectively implemented in the source and destination nodes. We evaluate the performance of SPMLD through extensive simulations in QualNet using real-time H.264 video streaming. Experimental results demonstrate that: SPMLD outperforms previous flow and packet based load distribution models in terms of video peak signal-to-noise ratio, total packet delay, end-to-end delay, and risk of packet reordering. Besides, SPMLD's extra overhead is tiny compared to the input video streaming.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.