• Title/Summary/Keyword: schedule delays

Search Result 69, Processing Time 0.11 seconds

A Study of Piping Leadtime Forecast in Offshore Plant’s Outfittings Procurement Management (해양플랜트 의장품 조달관리를 위한 배관 공정 리드타임 예측 모델에 관한 연구)

  • Ham, Dong Kyun;Back, Myung Gi;Park, Jung Goo;Woo, Jong Hun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.1
    • /
    • pp.29-36
    • /
    • 2016
  • In shipbuilding and offshore plant construction, pipe-stools of various types are installed. Moreover, these are many quantities but they must be installed in a successive manner. Due to these characteristics the pipe-stool installation processes easily tends to cause the schedule delays in the overall production processes. In order to reduce delay, the goal of this study is to predicts production’s lead time before manufacturing. Through this predictions it’s expected to reduce total production’s lead time by improving it's process. First of all, we made MLR(Multiple Linear Regression) and PLSR(Partial Least Square Regression) model to predict pipe-spool's lead time and then compared predictability of MLR and PLSR model. If a explanatory variable is added, it will be possible to predict results precisely.

An Overview of Seabed Storage Methods for Pipelines and Other Oil and Gas Equipment

  • Fatah, M.C.;Mills, A.;Darwin, A.;Selman, C.
    • Corrosion Science and Technology
    • /
    • v.16 no.2
    • /
    • pp.76-84
    • /
    • 2017
  • In the construction of subsea oil and gas developments, it is increasingly common that subsea oil and gas equipment will be installed in subsea well before final hookup and production. Installation of wellheads, subsea hardware, pipelines, and surface facilities (platforms, FPSO, FLNG, connected terminals, or gas plants) are increasingly driven by independent cost and vessel availability schedules; this gives rise to requirements that the subsea facilities must be stored in the seabed for a specific time. In addition, schedule delays, particularly in the installation or startup of the connected platform, FPSO, FLNG, or onshore plant may cause unexpected extensions of the intended storage period. Currently, there are two methods commonly used for storage subsea facilities in the seabed: dry parking and wet parking. Each method has its own risks, challenges, and implications for the facility life and its integrity. The corrosion management and preservation method selection is a crucial factor to be considered in choosing the appropriate storage method and achieving a successful seabed storage. An overview of those factors is presented, along with a discussion on the internal corrosion threats and assessments.

Deriving of Critical Factors for Construction Planning in Large Span Roof Construction (대공간 지붕 철골공사의 시공계획 중점관리항목 도출)

  • Lee, Myungdo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.1
    • /
    • pp.67-75
    • /
    • 2018
  • Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.

Correlation Analysis between Delay and Turnaround Time at Jeju International Airport (제주국제공항의 지연과 Turnaround Time 간의 상관관계 분석)

  • Lee, Choongsub;Kim, Dongsin;Kim, Hyewook;Baik, Hojong
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.30 no.1
    • /
    • pp.1-11
    • /
    • 2022
  • The capacity of Jeju International Airport has reached its limit due to a surge in air traffic demand such as passengers and cargo and the continuous expansion of Low Cost Carriers (LCC). Despite COVID-19 that has began in November 2019, Jeju International Airport still has continuous demand in terms of passenger and cargo transportation. As a result, it is undeniable that the delay rate also unexpectedly increased as the air traffic volume at Jeju International Airport continued to increase. In this study, the correlation between Turnaround Time and delay rates of national airlines is analyzed based on past flight data at Jeju International Airport, and the cumulative delay time trend for sampled airlines is compared with Turnaround Time. Through this study, it is expected to contribute to securing aircraft operation efficiency and on-time by analyzing delays related to Turnaround Time at Jeju International Airport.

3D WALK-THROUGH ENVIRONMENTAL MODEL FOR VISUALIZATION OF INTERIOR CONSTRUCTION PROGRESS MONITORING

  • Seungjun Roh;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.920-927
    • /
    • 2009
  • Many schedule delays and cost overruns in interior construction are caused by a lack of understanding in detailed and complicated interior works. To minimize these potential impacts in interior construction, a systematic approach for project managers to detect discrepancies at early stages and take corrective action through use of visualized data is required. This systematic implementation is still challenging: monitoring is time-consuming due to the significant amount of as-built data that needs to be collected and evaluated; and current interior construction progress reports have visual limitations in providing spatial context and in representing the complexities of interior components. To overcome these issues, this research focuses on visualization and computer vision techniques representing interior construction progress with photographs. The as-planned 3D models and as-built photographs are visualized in a 3D walk-through model. Within such an environment, the as-built interior construction elements are detected through computer vision techniques to automatically extract the progress data linked with Building Information Modeling (BIM). This allows a comparison between the as-planned model and as-built elements to be used for the representation of interior construction progress by superimposing over a 3D environment. This paper presents the process of representing and detecting interior construction components and the results for an ongoing construction project. This paper discusses implementation and future potential enhancement of these techniques in construction.

  • PDF

Cutting-edge Technologies to Achieve a Higher Level of Modular Construction - Literature Review

  • Lee, Seungtaek;Choi, Jin Ouk;Song, Seung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.536-542
    • /
    • 2022
  • Cost overruns, schedule delays, and a shortage of skilled labor are common problems the construction industry is currently experiencing. Modularization and standardization strategies have the potential to resolve the various problems mentioned above and have been applied for various construction applications for a long time. However, the level of modularization remains low, and modular construction projects have not been getting the full benefits. Thus, this review investigated the cutting-edge technologies currently being utilized to develop the modular construction field. For this paper, qualified research papers were identified using predetermined keywords from previous related research papers. Identified literature was then filtered and analyzed. According to the included reviews, several technologies are being developed for modular construction. For example, automated design and monitoring systems for modularization were developed. In addition, research labs are utilizing robotic arms for modular construction to achieve a high level of completion in the construction industry, as is seen in the manufacturing industry. Despite these efforts, more research and development are necessary because some automation technologies still require manual activities. Thus, there is great potential for further development of modularization techniques, and further research is recommended to achieve high levels of modularization.

  • PDF

A Framework for developing the automated management system of environmental complaints in construction projects

  • Hong, Juwon;Kang, Hyuna;Hong, Taehoon;An, Jongbaek;Jung, Seunghoon
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.417-422
    • /
    • 2020
  • Vast quantities of environmental pollutants from construction projects are causing significant damage to nearby local communities and thus generate environmental complaints. The construction company, responsible for compensating and resolving environmental complaints, suffers economic damages due to additional expenditures and schedule delays in construction projects. Meanwhile, the construction industry can stagnate from a broader perspective. Therefore, this study aimed to propose a framework for developing an automated management system which consists of two models for environmental complaints in construction projects: (i) the prediction model: a model for predicting environmental complaints based on factors related to environmental complaints; and (ii) the prevention model: a model for providing construction companies with the optimal prevention measure to effectively prevent environmental complaints according to the results of the prediction model. In addition, the algorithm for integrating the developed models into the management system in construction projects was proposed. Eventually, the application of the management system to construction projects can ensure the profitability of construction companies and mitigate damage from environmental pollutants to the nearby local community.

  • PDF

LEED PERCEPTION DISPARITIES: DESIGNERS VERSUS NON-DESIGNERS

  • Hyun Woo Lee;Youngchul Kim;Doyoon Kim;Kunhee Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.36-41
    • /
    • 2013
  • With the increased interest in green buildings, the building industry has been experiencing a fast-growing demand for LEED (Leadership in Energy and Environmental Design) certification for the last decade. Still, it is not unusual to see various barriers and issues during its implementation, and experience tells that they can result in harming the overall project performance with reworks, lower productivity, schedule delays, and cost overruns. In order to better understand the industry's observation on issues and their consequences during LEED implementation, we distributed an online survey, and a total of 53 responses were received. The survey results indicate that (1) both designers and non-designers (e.g., contractors) select 'added costs to design and construction' as the biggest barrier; (2) both designers and non-designers select 'decision made too late in the design process' as the most frequently observed issue; and (3) non-designers indicate higher perceived severity in every consequence criteria than designers. The statistical analyses reveal that cost overruns are the most severe impact observed and have a statistically significant relationship with responses in regard to the barrier to LEED implementation.

  • PDF

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

Automated Supervision of Data Production - Managing the Creation of Statistical Reports on Periodic Data

  • Schanzenberger, Anja;Lawrence, D.R.
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.11a
    • /
    • pp.39-53
    • /
    • 2004
  • Data production systems are generally very large, distributed and complex systems used for creating advanced (mainly statistical) reports. Typically, data is gathered periodically and then subsequently aggregated and separated during numerous production steps. These production steps are arranged in a specific sequence (workflow or production chain), and can be located worldwide. Today, a need for improving and automating methods of supervision for data production systems has been recognized. Supervision in this context entails planning, monitoring and controlling data production. Two significant approaches are introduced here for improving this supervision. The first is a 'closely-coupledd' approach (meaning direct communication between production jobs and supervisory tool, informing the supervisory tod immediately about delays in production) - based upon traditional production planning methods typically used for manufacturing (goods) and adopted for working with data production. The second is a 'loosely-coupled' approach (meaning no direct communication between supervisory tool and production jobs is used) - having its origins in proven traditional project management. The supervisory tool just enquires continuously the progress of production. In both cases, dates, costs, resources, and system health information is made available to management. production operators and administrators to support a timely and smooth production of periodic data. Both approaches are theoretically described and compared. The main finding is that, both are useful, but in different cases. The main advantages of the closely coupled approach are the large production optimisation potential and a production overview in form of a job execution plan, whereas the loosely coupled method mainly supports unhindered job execution and offers a sophisticated production overview in form of a milestone schedule. Ideas for further research include investigation of other potential approaches and theoretical and practical comparison.

  • PDF