What is a Critical Factor for Determining the Issue-Resolving Time in the BIM-based Coordination Process?

  • Jang, Sejun;Lee, Dongmin;Lee, Ghang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.392-395
    • /
    • 2015
  • This study analyzes critical factors that affect issues of resolving time in BIM-based coordination using a case study. According to recent buildings that are meant to be more complex, BIM-based design coordination is regarded as an essential stage of the project delivery process. In the design coordination phase, a relocation of architectural, structural, mechanical, and electrical elements is conducted to avoid interference. In addition, the procedure of the development of each element in detail for the actual construction is carried out. Delays in coordination can affect delays in the entire delivery schedule of the project, and therefore many researches have focused on efficient coordination methods and how to shorten the period. In this study, we conducted a detailed analysis of the issue-resolving process using a case study, and found out that the participation of decision-makers for issue-resolving and the physical combination of trades affect delays in coordination time. In particular, we proposed the concept of organizational relation, indicating the level of decision-makers for issue-resolving, and the concept of physical relation, indicating the physical complexity of the issue, and we analyzed the effects of coordination delays.

  • PDF

무엇이 정보시스템 프로젝트 일정을 지연시키는가? (What Factors Make the Delay of the Information System Project Implementation?)

  • 성병욱;박상철;고준
    • 지식경영연구
    • /
    • 제22권1호
    • /
    • pp.1-19
    • /
    • 2021
  • 대규모 병원정보시스템 프로젝트가 계획 대비 지연되는 경우가 종종 발생하고 있다. 따라서 프로젝트 관리 측면에서 일정 지연을 촉발하는 원인을 검토하고 지연 유발 요인들 간 인과관계 분석이 필요하다. 본 연구는 근거이론 방법론을 활용하여 병원정보시스템 개발 프로젝트 사례에 대한 일정 지연 요인을 발견하고 이들 간의 인과관계를 파악하고자 한다. 연구 결과, '비현실적 일정 수립'은 도미노 현상과 같이 전반적인 일정 지연에 영향을 미치고, '기존 시스템 분석 미흡'은 분석 품질의 저하를 야기하는 반면 '서브시스템 통합 인터페이스 부실'은 설계 품질의 저하로 이어졌다. 본 연구는 학술적인 측면에서 프로젝트 지연에 영향을 미치는 요인을 찾아내고 지연 요인들 간의 인과 관계를 분석하였으며, 실무적 관점에서는 System Integration (SI) 기업, 병원, 프로젝트 관리자 입장에서 프로젝트 일정 지연을 최소화할 수 있는 방안을 제시한 점에 의의가 있다.

사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안 (Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project)

  • 조태제;최종수
    • 한국건축시공학회지
    • /
    • 제11권1호
    • /
    • pp.9-17
    • /
    • 2011
  • 건설프로젝트에서 공기지연은 공정 및 공사비 관리 측면에서 핵심 관리사항에 해당된다. 본 연구는 아파트 건설공사에서 직접비의 상당부분을 차지하는 골조공사를 대상으로 공사부위별 공기지연 수준을 분석하고 대책을 제시한 실증연구로 10개 현장의 공사비 비중분석 결과에 기반하여 골조공사에서 지연이 발생하는 부위의 순위, 원인 등을 분석하였다. 분석결과 1층 골조공사에서 가장 큰 지연이 발생하는 것으로 나타났으며 지연원인을 다양한 분류에 의거하여 분석하고 대책을 제시하였다.

MODELING MEASURES OF RISK CORRELATION FOR QUANTITATIVE FLOAT MANAGEMENT OF CONSTRUCTION PROJECTS

  • Richard C. Jr. Thompson;Gunnar Lucko
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.459-466
    • /
    • 2013
  • Risk exists in all construction projects and resides among the collection of subcontractors and their array of individual activities. Wherever risk resides, the interrelation of participants to one another becomes paramount for the way in which risk is measured. Inherent risk becomes recognizable and quantifiable within network schedules in the form of consuming float - the flexibility to absorb delays. Allocating, owning, valuing, and expending such float in network schedules has been debated since the inception of the critical path method itself. This research investigates the foundational element of a three-part approach that examines how float can be traded as a commodity, a concept whose promise remains unfulfilled for lack of a holistic approach. The Capital Asset Pricing Model (CAPM) of financial portfolio theory, which describes the relationship between risk and expected return of individual stocks, is explored as an analogy to quantify the inherent risk of the participants in construction projects. The inherent relationship between them and their impact on overall schedule performance, defined as schedule risk -the likelihood of failing to meet schedule plans and the effect of such failure, is matched with the use of CAPM's beta component - the risk correlation measure of an individual stock to that of the entire market - to determine parallels with respect to the inner workings and risks represented by each entity or activity within a schedule. This correlation is the initial theoretical extension that is required to identify where risk resides within construction projects, allocate and commoditize it, and achieve actual tradability.

  • PDF

Development of Delay Responsibility Determination Model based on the Probabilistic Risk Analysis

  • Cho, Ji Hoon;Lim, Dong Yui;Kim, Sang Bum
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.599-599
    • /
    • 2015
  • This research attempts to resolve the construction delay issues of indirect delays by developing the "Delay Responsibility Determination Model" (DRM) based on probabilistic risk analysis. DRM is envisioned to provide a way of quantitatively analyzing impacts of delayed activities while considering both direct and indirect influences. With the successful development of DRM, it would be possible to present relative probabilistic measures to all the related stakeholders in terms of their contributions to schedule delays. Upon the development completion of DRM, "Korean Construction Delay Claim/Dispute Resolution Protocols" will also be prepared to facilitate the effective use of DRM.

  • PDF

CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • 제47권3호
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

작업지연원인 기반 작업여건분석 체계 (Cause of Schedule delay-based Constraints Analysis Process)

  • 송지원;유정호;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.637-642
    • /
    • 2007
  • 건설공사 한 프로젝트의 전체공기는 개별 작업들이 수행된 날짜의 합이라 할 수 있다. 개별 작업들에서 지연이 발생할 경우 전체 공기 또한 늦어지기 마련이다. 이러한 개별 작업의 계획상에서 작업이 수행될 확률을 높인다면 프로젝트의 공기달성 확률 또한 높아지게 될 것이다. 따라서, 계획상의 작업 실행여부 확인을 위하여 건설 생산프로세스에서 각 작업의 수행을 저해하는 제약요인을 도출하여 작업여건분석을 한다. 작업여건분석을 통해 저해요인 사전 제거와 작업간의 상호의존성을 파악으로 작성된 개별 작업계획들의 실행 가능성 확임함으로써 공사전체의 공기지연을 방지하는 체계를 구축하고자 한다.

  • PDF

Construction Delay Analysis Using Daily Work Report Data for Short Construction Seasons

  • Jamal, Md Shah;Abdelaty, Ahmed;Shrestha, K. Joseph
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.616-623
    • /
    • 2022
  • Some regions and states, such as Wyoming, have harsh weather conditions, forcing most transportation projects to be completed under tight schedules. However, construction projects are not only delayed by weather conditions, but also delayed by other factors such as contractor's competency, resource availability, coordination issues, and safety. Also, the construction method, geographical location of the projects, and inability to follow baseline schedules accurately due to the contractor's resource allocation are also reasons for the delay. This paper discusses the main reasons for the delay in the public transportation projects based on Daily Work Reports (DWRs) from five different transportation projects of the last three years in Wyoming. This paper focuses on the inconsistencies of the contractor's schedules to complete the project according to the baseline schedule. First, the authors collected DWRs and baseline schedules from the Wyoming Department of Transportation (WYDOT). Second, the DWR data are compared against the baseline schedules to determine the reasons for delaying their significance. Finally, the paper presents the recommendations to mitigate the effects of delays on public transportation projects as well as to improve the documentation process of DWR data.

  • PDF

건설공사의 작업불능일 기준설정에 의한 보정계수 계산 및 적용을 통한 최적공기 산정 (Optimal Period by Calculating and Appling Correction Factor based on Setting of Non-Working Days of Construction Projects)

  • 이필윤;이성원;변요셉;조중연;이민재
    • 한국산학기술학회논문지
    • /
    • 제19권12호
    • /
    • pp.669-676
    • /
    • 2018
  • 건설공사에서 공정관리는 공사 기간을 결정하는 중요한 단계이나, 설계단계에서 작업불가능 일수 예측 및 산정이 제대로 이루어지지 않아 예정공기와 실행공기의 차이가 발생하고 있다. 이러한 차이를 최소화하기 위하여, 본 논문에서는 공정계획 수립 시 실제에 가장 근접하는 방법으로 추석 및 구정연휴를 휴무일에 반영한 작업불가능 일수 산정방법과, 주요공종별 특성분석을 통한 작업가능일수 산정방법을 제시하였으며, 이를 바탕으로 주요단위공종에 대한 공기산정시 작업불가능 일수가 포함된 최적의 단위공기 산정방법을 제안하였다. 같은 현장 동일공사에 대한 기존 방법과 개선된 방법의 보정계수를 적용하여 소요작업 일수를 산출한바 개선된 방법이 실작업일수 기준으로는 22일(9.1%) 단축됨을 확인하였으며, 공종별 작업소요일수 기준(안)을 수원지역 개착식 공동구 공사에 대하여 적용 전과 후의 차이를 비교하였다. 기준(안) 적용 전 공사일수는 총 304일 이었으나, 기준(안) 적용 후 공사일 수는 총 421일로 설계단계에서 공정계획의 중요성을 예로 확인하였다. 본 연구 결과는 그동안 현장에서 관행적으로 시행되어 오던 실 작업일수 계산과 공정표상 작업일수의 불일치로 인한 공정지연을 방지하고 보다 실제에 근접한 공정계획 수립에 도움이 될 것으로 판단한다.

코로나19가 한국 우주산업에 미친 영향과 대응방안 (COVID-19's Impact on the Space Industry and Countermeasures in Korea)

  • 김종범
    • 문화기술의 융합
    • /
    • 제6권4호
    • /
    • pp.195-201
    • /
    • 2020
  • 코로나 19가 전 세계를 강타하고 있다. 우주 분야에서도 새로운 방식의 혁신을 불러오기 위해서 우주 분야에서의 변화 양상을 분석하고, 새로운 도전전략의 설계가 필요하다. COVID-19는 우주분야에 내재된 취약성을 노출하고 있다. 특히 COVID-19는 우주산업에서 공급망 충격을 주고 있는데, 제조 단위의 전체 또는 부분적 중단으로 인한 시스템, 서브시스템 및 부품의 공급 지연을 가져온다. 뉴노멀이 초래할 산업 전방위적 영향이 총체적인 만큼, 우주분야에서도 이를 지속적으로 살펴보는 것은 필수적이라 하겠다. COVID는 우주산업에서 공급망 충격을 주고 있다. 제조 단위의 전체 또는 부분적 중단으로 인한 시스템, 서브시스템 및 부품의 공급 지연을 가져온다. 발사서비스 공급에 있어서, 발사 일정이 지연되고 있지만, 주요 발사는 여전히 이뤄지고 있다. 지구관측 활용분야에서는 환경 모니터링 등 주요 애플리케이션의 수요가 급증하고 있고, 항법에서는 자동차, 해양 분야를 다루는 항법 서비스 제공업체들은 하향을 경험할 수도 있다. 제조업에의 영향을 분석해보면, 공급업체 기반의 위축으로 시스템, 하위 시스템 및 부품의 공급 지연을 가져오고 있고, 발사 서비스 제공업체들은 발사 일정 지연을 최소화 하려고하고 있다.