• Title/Summary/Keyword: schedule analysis

Search Result 870, Processing Time 0.03 seconds

THE ROOT CAUSE ANALYSIS METHOD FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석방법)

  • Ji, Kun-Chang;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.131-136
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity. and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay. Moreover, the analysis method did not consider the trait, which cause the schedule delay, in constructing projects. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

  • PDF

An Analysis of Effect and Limitation when Adapting Earned Schedule Method for Schedule Management and Estimation in Korean Defense Research & Development Projects (한국 국방 연구개발 프로젝트 일정 관리 및 예측을 위한 Earned Schedule 기법의 적용 효과와 한계 분석)

  • Cho, Jungho;Lim, Jaesung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.3
    • /
    • pp.396-402
    • /
    • 2018
  • Earned Value Management(EVM) has been used to manage and forecast defense project schedule and cost over the last two decades in the world. However to support the lacking ability of schedule analysis in traditional EVM, earned schedule(ES) has been introduced as a tool to more accurately estimate schedule performance. This paper compares which method EVM or ES, provides more accurate schedule predictors in 32 Korean defense research and development projects. As a result of comparison, the ES method can predict the future schedule more reliably than the EVM method. We also analyze early warning function of schedule performance index considering project duration extension point. Through the analysis results, we confirm that both the EVM and the ES method lack the ability of the early warning in terms of the current schedule management criterion.

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

THE ROOT CAUSE ANALYSIS PROCESS FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석 프로세스)

  • Ji, Kun-Chang;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.138-148
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity, and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay, and the range of analysis method of the cause structure of schedule delay has been multifarious from industrial views to views of specific work. Moreover, the classifying system and analysis method did not consider the trait, which cause the schedule delay, in constructing projects. For this reason, it is difficult to compare the cause of delay factors of the projects and to understand the effect of schedule delay by each factor. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

A Case Study on Reason Analysis for Schedule Delay of Apartment House (공동주택의 공기지연 원인분석 사레 연구)

  • Park, Chang-Wook;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.89-94
    • /
    • 2009
  • A study was performed the analysis for the schedule delay of the public housing. To perform this study, the first study existing research literature on the cause of the schedule delay was considered. The based on existing study, this study selected the cause of schedule delay. For check of the schedule delay, this study was compared the monthly schedule and the work diary. Survey was conducted for using the selected cause of schedule delay. And the importance was calculated for using the AHP method. In a case site, the cause of the schedule delay was analyzed. The last, the delay cause was presented the map of cause of effect the based on the delay cause of a case site.

A Delay Analysis based on the Comparison of the As-planned Schedule, As-built Schedule including All Delays and As-built Schedule absent Owner Delays (계획공정표, 모든 지연을 포함한 준공공정표, 발주자 지연을 제외한 준공공정표의 비교를 통한 공기지연분석)

  • Yun Chul-Sung;Chu Hae-Keum;Kim Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.426-429
    • /
    • 2003
  • In the construction process, there are many change orders differing to the initial contracts came from the social needs and environmental changes. Most of them will impact to the construction process so that its effects occur project delays. Time extension and liquidated damage in the construction process come from schedule delay whether it is excusable or not non-excusable by the owner. However, those become the delay claims if the owner and the contractor are not agreed on this situation. One of the most important thing on the delay claims is the calculation of delay. The purpose of this study is to present the method of the time delay calculation by comparison of As-Planned schedule, As-Built schedule including all delay and As-Built schedule absent owner delay.

  • PDF

A Study on the Pass Schedule of Multi-Pas Shape Drawing Process for Cross Roller Guide (크로스 롤러가이드의 다단형상인발공정 패스 스케쥴에 관한 연구)

  • Lee, T.K.;Lee, C.J.;Lee, S.K.;Lee, S.B.;Kim, B.M.
    • Transactions of Materials Processing
    • /
    • v.18 no.7
    • /
    • pp.550-555
    • /
    • 2009
  • In the multi-pass shape drawing process, the pass schedule that includes the determination of reduction ratio and intermediate die shape is very important. This study used the equal reduction, equal load, and electric field analysis method for pass schedule of the multi-pass shape drawing. The reduction ratio was calculated by the equal reduction and equal load method. And the intermediate die shape was determined by the result of the electric field analysis and the calculated reduction ratio. The proposed pass schedule method was applied to a shape drawing for producing cross roller guide. Finally, FE-analysis and shape drawing experiment were performed to verify the effectiveness of the proposed method.

Pass Redesign for Reduction of Wire Breakage in the Wet Wire Drawing Process (습식 신선공정의 단선율 저감을 위한 패스 재설계)

  • Lee S. K.;Kim M. A.;Kim B. M.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2002.11a
    • /
    • pp.71-77
    • /
    • 2002
  • The Production of fine wire through wet wire drawing process with appropriate pass schedule would be impossible without understanding of relationship among many process parameters. Therefore, this paper investigates the relationship among process parameters of wet wire drawing process. In this study, it is possible to obtain the important basic data that can be used in the pass schedule of multi-pass wet wire drawing process. In order to verify the effectiveness of the analysis, pass redesign was performed based on the result of analysis to reduce the wire breakage. The wire breakage between the conventional pass schedule and the redesigned pass schedule was compared by the FE analysis and the wet win drawing experiment.

  • PDF

Analysis of wet Wire Drawing Process and Pass Redesign to Reduce Wire Breakage (습식 신선공정 해석 및 단선율 저감을 위한 패스 재설계)

  • 이상곤;김민안;김병민
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.1034-1037
    • /
    • 2002
  • Wet wire drawing process is used to produce fine wire in the industrial field. The production of fine eire by using wet wire drawing process with appropriate dies pass schedule would be impossible without understanding of relationship between process parameters such as material properties, dies reduction, friction conditions, drawing speed etc. However, up to new, dies pass schedule of wet wire drawing process has performed by trial and error of expert. Therefore, this study investigates the relationship between process parameters quantitatively and analyzes a conventional wet wire drawing process. Using the results, the conventional pass schedule can be redesigned to reduce the wire breakage during wet wire drawing. To verily the result of this study, the wet wire drawing experiment was performed. And the results between conventional process and redesigned pass schedule were compared. As the comparison of results, the wire breakage was considerably reduced in the redesigned pass schedule more than conventional pass schedule.

  • PDF

Evaluating Schedule Management Capability in Korean Construction Industry through Importance-Performance Analysis (IPA 방법을 활용한 국내 건설 산업 공정관리 역량 평가)

  • Lee, Jin Gang;Song, Bohyeon;Kim, Dain;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.145-156
    • /
    • 2024
  • In an era where construction projects are becoming increasingly large and complex, the Korean construction industry faces the challenge of implementing systematic and cohesive schedule management practices. This study initially delineates the concept of schedule management capabilities, systematically categorizing them into five distinct domains: law and regulations, requirements of project owners, capabilities of professionals and organizations, task capability, and the adoption of smart construction technologies for schedule management. Through a survey targeting industry professionals, this research assesses the perceived importance and the actual proficiency level in schedule management across these categories, employing an Importance Performance Analysis(IPA) to scrutinize these capabilities. The findings underscore the acknowledged significance of diverse aspects of schedule management, yet reveal discrepancies between the current proficiency levels and their perceived importance, pinpointing areas necessitating enhancement. Critical improvement needs identified encompass the planning of budgets for schedule management, development of regulations for assessing construction periods, deployment of specialized on-site staff for schedule management, and investment in advanced schedule management software solutions. Consequently, this study offers a nuanced analysis and strategic insights for enhancing schedule management practices, aiming to facilitate their effective implementation in the field.