• Title/Summary/Keyword: scaffolding construction

Search Result 80, Processing Time 0.02 seconds

The Survey of the Current Situation for System Scaffolding in the Domestic Construction Site (국내 건설현장의 시스템비계 사용 실태 조사)

  • Park, Jong-Keun;Jeong, Se-Gyun
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.3
    • /
    • pp.107-111
    • /
    • 2010
  • Recently, the domestic construction companies are increasingly using the scaffolding system in order to secure safety although it may increase the construction cost. However since the actual situation of scaffolding system has not been checked yet, no safety standards and work method were made. Hence, various risk factors are involved in the scaffolding system work. Accordingly, this study is intended not only to check the installation/use status of scaffolding system in the domestic construction sites through the in-depth survey and investigation but also to suggest the measures of using the scaffolding system more effectively and systematically while basing the study results.

The practical analysis of the gap of ledger scaffolding - focus on Pipe scaffolding - (강관비계 띠장 간격의 실무적 해석 - 단관비계 중심으로 -)

  • Bae, Jun-Tae;Kim, Chi-Gyeong
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.301-311
    • /
    • 2012
  • The law(construction standard specification, construction, standard-work regulation, Industry safety standard related regulation) related to the installation of scaffolding being used commonly on the construction site is regulated that the gap of ledger is within 1.5m and first ledger is within 2m. The gap of ledger here is essential for the stability of scaffolding structure. But it is determined that it is possible for the gap of ledger is applied by explaining safety handrail as ledger, because of the fact that in current, on the construction site, safety handrail is installed with the material of scaffolding ledger as a steel tube pipe. On this study, it is aimed to guarantee the safety by analyzing the ledger of scaffolding practically and prevent the accident of manager and laborer through the actualization.

  • PDF

A Study on the Actual Condition of Scaffolding Construction in Accordance with the Revision of Safety Standards (비계공사 안전기준 개정에 따른 현장적용 실태에 관한 연구)

  • Kim, Ja Yeon;Cho, Youn Hee
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.4
    • /
    • pp.15-22
    • /
    • 2020
  • Scaffolding works are demolished after this structure is completed, and safety accidents often occur because they are installed differently from legal standards or frequently change during work. Therefore, in order to strengthen the safety of scaffolding, the Ministry of Land, Infrastructure and Transport required a need for design standards for temporary facilities that can systematically prevent and solve large-scale safety accidents that are repeatedly increasing during temporary construction. It has been enacted, and some contents have been revised for the past three years. However, construction site personnel do not know or know the revised matters, but often install scaffolding by the installer's experience rather than complying with relevant laws and regulations. It is the situation that the ground strength test of the foundation ground for the load applied to the floor of the column is omitted in most sites. Therefore, this study grasped the actual situation on the degree of recognition of the revised laws and regulations of the construction site and the foundation-based treatment of the floor working load of the scaffolding column, and derived problems. In addition, we intend to provide reference materials for the endurance test according to the ground conditions to small-scale small sites where it is difficult to conduct the test by carrying out the endurance test of the scaffolding ground according to the revised standards.

The Survey of the Current Situation for System Scaffolding in the Domestic Construction Site(II) (국내 건설현장의 시스템비계 사용 현황 분석(II))

  • Park, Jongkeun
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.2
    • /
    • pp.35-40
    • /
    • 2015
  • It is a tendency for enterprises in the domestic construction field to harness the system scaffolding with an aim to securing safety, despite slight increase in terms of the construction cost. Nevertheless, given that putting the system into service in reality is not accurately surveyed by far and that safety standards and methods for safe work therewith are not yet established, hazardous factors involving the system scaffolding remain latent leaving unrecognized. In this regard, the current study attempts to understand the status of implementation and use of the system scaffolding in the local construction sites as for the year 2009 and the year 2013 through questionnaire surveying and in-depth interviewing, while further proposing, based on the result thereof, ways for activating introduction of the system scaffolding in an effective and systematic manner.

Development of a Bracing System Preventing Falling Down of Movable Scaffoldings in Temporary works (가설공사의 이동식 비계 전도방지 버팀대 개발)

  • Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.31-33
    • /
    • 2012
  • Movable scaffolding has been used to work in high places. The scaffolding is economical and convenient to move to other places, but it has the risk of falling down. This paper proposes a fixed bracing system to prevent the falling down of a movable scaffolding, and evaluates its usability by making a small-sized model. Further studies of structural stability, safety, and economical efficiency is necessary to use the system practically.

  • PDF

The Evolution and Structural Characteristics of Scaffolding Constructions in Macao Area from Historical Documents and Visual Materials (문헌 및 도상(圖像) 사료를 통해 본 마카오 '붕식(棚式)' 건축의 연원(淵源)과 구조 형식)

  • Hong, Shu-ying;Han, Dong-Soo
    • Journal of architectural history
    • /
    • v.32 no.1
    • /
    • pp.7-20
    • /
    • 2023
  • The construction method of scaffolding structures is different from Mortise and Tenon and bucket arch structure of traditional large woodwork. It forms an independent construction system-fixing nodes with knots, a large number of diagonal braces are used to fix shelves and the structures mostly contain X-shape and triangular shape details. Simple ones include stalls, sheds, rain sheds, altars, lamp racks etc. But the scaffolding with larger scale and more complicated structure are modeled on archways, theatres and other buildings which are used in commercial and festival activities. At present, Macao, Hong Kong, Guangdong, Sichuan, Shanxi and other places in China have retained the custom of using scaffolding structures in important festival activities, but their uses, techniques and building types are slightly different from place to place. Due to building and demolishing at any time, the construction and service cycle is short. As a result, there are almost no physical objects left. We can only deduce the use and technical characteristics of ancient scaffolding skills through the colorful building styles that have been preserved with folk activities in various parts of China, the craftsmanship handed down from generation to generation by the scaffolding guild and artisans, and the description of cultural and historical materials and the mutual corroboration of visual materials.

An Analysis of Teacher's Scaffolding for Promoting Social Construction of Scientific Models in Middle School Science Classes (중학교 과학수업에서 과학적 모형의 사회적 구성을 촉진하는 교사 스캐폴딩 분석)

  • Do, Hayoung;Park, Jeongwoo;Yoo, Junehee
    • Journal of The Korean Association For Science Education
    • /
    • v.36 no.4
    • /
    • pp.643-655
    • /
    • 2016
  • The purpose of this study is to figure out the characteristics of teacher's scaffolding that can promote the social construction of scientific models by analyzing a teacher's scaffolding that actually promoted the social construction in a real classroom context, so that we can better understand the teacher's scaffolding. For this study, a total of 32 middle school students and their science teacher in Seoul were observed and videotaped. The level of social construction were categorized in four stages. We divided the teacher's scaffolding by whether the level of social construction has changed or not, and analyzed teacher's scaffolding in each group. Teacher's scaffolding were categorized based on its object, purpose and means. The object were categorized into two types; small-group and individual. The purpose were categorized into two types; process-help and product-help. The means were coded into Diagnostic strategies(Reading, Listening, Questioning), Checking diagnosis and Intervention strategy(Instruct, Explain, Hint, Confirm). The result show that teacher's scaffolding is helpful in the social construction of scientific models when it supports small-groups more than individuals, and process-help more than product-help. It also shows that in diagnostic strategies, questioning and listening are effective. Finally, using checking diagnosis promoted interactions among students and a 'confirm' intervention strategy should be avoided because it has no positive effect on changes in the level of social construction. This study provides the features of the teacher's scaffolding that promotes social construction of scientific models in middle school classes.

A Study on the Buckling Characteristics of Steel Pipe Scaffold (강관비계의 좌굴특성에 관한 연구)

  • Paik, Shin-Won;Song, In-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.1
    • /
    • pp.57-61
    • /
    • 2010
  • Formwork is a temporary structure that supports its weight and that of fresh concrete as well as construction live loads. Scaffoling is a temporary frame used to support people and material in the construction or repair of buildings and other large structures. It is usually a modular system of metal pipes, although it can be made out of other materials. Bamboo is still used in some Asian countries like China. The purpose of a working scaffold is to provide a safe place of work with safe access suitable for the work being done. In construction site, steel pipes are usually used as scaffolds. In this study, scaffolding systems which is changed according to sleeper and joist space were measured by buckling test. Buckling load of respective scaffolding system was analyzed by structural analysis program(MIDAS). Buckling load of scaffold with/without wall connection and footboard was got by test and structural analysis. According to these results,we know that scaffolding system of case 3 is suitable. Buckling load of scaffold with wall connection is higher than without wall connection. So wall connection is important in scaffoling systems. Footboard in the scaffolding systems is not effective against promotion of buckling load. Finally, the present study results will be used to design scaffolding systems safely in the construction sites.

Building Information Modeling for Temporary Structure Planning and Safety Analysis (BIM을 활용한 가설물 계획 및 안전 관리)

  • Kim, Kyungki;Cho, Yong Kwon;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.6 no.2
    • /
    • pp.12-18
    • /
    • 2016
  • The entire construction safety is significantly influenced by proper uses of temporary structures. However, in current practices, temporary structures are used without sufficient planning and analysis on their impact on safety. Consequently, problems in worker safety and loss of productivity are frequently caused related to temporary structures. This paper introduces an approach that uses Building Information Modeling (BIM) to automatically create temporary structures as part of construction plans and identifies potential safety hazards related to the temporary structures. In this study, the type of temporary structure is limited to scaffolding. Automation algorithms were developed and applied to (1) analyze daily construction site conditions (2) create required scaffolding objects, and (3) identify potential safety hazards related to scaffolding. A case study using a real-world construction project demonstrated that scaffolding objects were properly created based on user-input and potential safety hazards were successfully identified without human intervention.

A Study on Standards for Components for Tied Post System Scaffolding and Shoring (조립형 비계 및 동바리 부재 기준에 관한 연구)

  • Moon, Seong-Oh;Lee, Sang-Yeol;Youn, Ye-Bin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.25-26
    • /
    • 2021
  • System scaffolding and shoring are temporary structures in which vertical members, horizontal members, bracing members and trusses are assembled and installed. In order to ensure quality and safety, the quality test shall be carried out in accordance with the Guidelines for Quality Management of Construction Works (MOLIT Notice No. 2020-750). The quality test method (national standard) for Components for tied post system scaffolding and shoring is based on the Korean standards (KS F 8021) and the Safety certification standards (MOEL Notice No. 2021-22). However, the two standards differ in some aspects such as performance standards and etc, so cause confusion when applying them on-site. In addition, the standard for truss are applied only to trusses for shoring and cannot be applied to trusses for scaffolding. Therefore, this study aims to unify the two national standards and establish realistic standards.

  • PDF