• Title/Summary/Keyword: safety management costs

Search Result 331, Processing Time 0.025 seconds

A Study on Activation Policy of Smart Construction Safety Cost by Analyzing Actually Estimated Amount in Safety Management Plan (스마트건설안전 비용의 안전관리계획서 계상 현황 분석을 통한 활성화 방안 연구)

  • Won, Jeong-Hun;Jang, Nam Gwon;Yu, Ji Young
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.3
    • /
    • pp.34-44
    • /
    • 2022
  • This study analyzed the smart construction safety cost included in safety management plans that are approved before construction. Specifically, it refers to the cost incurred in constructing and operating a safety management system using wireless communication and facilities. Based on the obtained statistical results, an activation policy for the inclusion of the smart construction safety cost in building safety management plans was proposed. The smart construction safety cost must be included in the safety management cost; notably, this is mandated by the Construction Technology Promotion Act. However, there are some problems with the inclusion of smart construction safety costs. To analyze the problems encountered when calculating the smart construction safety cost and including it in safety management plans, in this study, statistical analysis was performed using the data of 1,334 safety management plans received at the Construction Safety Management Integrated Information (CSI) from June to August 2021. The results show that only 50.7% of the safety management plans included the smart construction safety cost although the current law mandates 100% inclusion of these costs. Thus, it is apparent that the smart construction safety costs are only included in a low proportion of sites. In addition, the calculated smart construction safety costs were shown to have a small correlation with the construction cost; moreover, they appeared to be distributed at a constant cost level. In this context, it is believed that perfunctory cost calculations were performed at most sites since the effect of the construction cost on the smart construction safety cost was negligible. Therefore, it is necessary to improve the inclusion of smart construction safety costs by strengthening the authorization process of the approval institute of safety management plans. In addition, institutional support, such as guidelines that promote the calculation and inclusion of appropriate smart construction safety costs according to the characteristics of sites, are needed.

Estimating Relative Risk Level of Construction Work (건설공사 상대적 위험도 산정)

  • Son, Ki-Sang;Yang, Hak-Soo;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

A Study on Improving the Occupational Safety and Health Management Cost Calculation Standards (산업안전보건관리비 계상기준 개선방안 연구)

  • An, Bang-Yul;Song, Tae-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.169-170
    • /
    • 2020
  • Occupational Safety and Health Management Cost, used to protect workers in Korean construction worksites and to create safe working environments, is a legally managed expense item. As this cost item is grounded on the Occupational Safety and Health Act, it is always implemented. However, because there is a ceiling on its rates, insufficient amounts of Safety Management Costs are often allocated to worksites, with the money not being used to areas essential to worker safety. As such, the current study raises the need to develop a set of standards to enable some items under the Occupational Safety and Health Management Costs-appropriated under the rate of indirect costs-to be appropriated as direct construction costs. As a preliminary step in this effort, the current study will provide basic data that can be used to create construction cost calculation standards for items that can be calculated as direct construction costs.

  • PDF

A Study on the Estimating Rate of Safety Management Cost in Building Work (건축공사 안전관리비 비율 산정 모형에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Yang, Hak-Su
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.33-40
    • /
    • 2007
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

Appropriate Rate for Estimating Safety Management Cost in Civil Work (토목공사 안전관리비 적정요율 산정)

  • Son, Ki-Sang;Lee, Gi-Tae;Park, Jong-Keun;Park, Jung-Bong
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.73-84
    • /
    • 2006
  • Standard safety management cost system was established in 1988 as a decree Number of 88-13, first time. And then, it has been revised fourteen times, up to now. A lot of practical investigations have been made for the revision but many problems at sites are continued to be put out so that it should be revised. This study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. Budget and actually performed amount of safety management costs in this study are investigated. costs for temporary work which is clarified in Japan is collected in order to compare domestic cost rate with Japanese one related to the total project amount. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

A Study on the Socioscientific Approach Method of GAS Safety Control Investment costs (가스안전관리 투자비용의 사회과학적 접근 방법에 관한 연구)

  • 송수정;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.2 no.1
    • /
    • pp.19-26
    • /
    • 2000
  • These days, the interest in the gas safety management has been increasing in our society, It needs the estimates to later investment in points of the gas safety management investment for prevention costs from gas accidents. It is written the general concept of gas safety management and the items that should be invested under the current policy. However they are not defined clearly and We have lots of difficulties in adapting them to actual spots and understanding them by their carry-out. When it follows the current safety standards, they doesn't meet the possibilities of mutual comparison, because gas safety management investment's definition is different. And sufficient information is not supported to efficiency adjudication of gas safety management investment. In this paper, you can find that Gas safety management is defined in order to more effective gas safety management investment, and the Socioscentific approach method was used to decide the gas safety management items that shall be invested.

  • PDF

The Study on the Application of the Safety Management Utilizing USN Using Smart Safety Equipment to Reduce Falling Accident on Construction Sites (건설현장의 추락재해 감소를 위한 스마트 안전장비를 활용한 USN 활용 안전관리의 적용에 관한 연구)

  • Nam, Wook Jin
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.6
    • /
    • pp.46-53
    • /
    • 2020
  • The domestic construction industry is becoming larger, high-rise and specialized. However, safety consciousness is still staying in low levels and falling accidents are apt to rise compared to other industries. So, the new way of safety management is required for reducing of the construction falling accidents. In this paper, we evaluate appropriateness of safety management on construction sites utilizing USN using smart safery equipment. Thus, we calculate loss costs of falling accidents considering accident rates and costs of the USN using smart safery equipment installation then compare both calculated costs. This research aims to propose the method for reduction of construction accidents in addition to conventional safety control methods by analyzing the propriety of applying USN using smart safery equipment on construction sites.

Analysis and Survey on Occupational Safety and Health Management Expenses in the Construction Industry (건설업 산업안전보건관리비 사용 실태조사 및 분석)

  • Sung-Yun Kang;Oh-Se Wook;Kim-Chang Won;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.2
    • /
    • pp.113-120
    • /
    • 2023
  • Occupational safety and health management expenses in the construction industry are statutory and separately included in the cost statement to prevent occupational accidents and health problems. The expenses are determined by multiplying the standard amount by the rate decided according to construction types and scales. However, the current expense appropriation method does not properly reflect the recent changes in the construction industry such as industry size, industry diversification, and social atmosphere about safety reinforcement. This study surveyed 1579 questionnaires in total and analyzed expense execution rate and proportion of each expense category. The expense execution rate was relative higher in complex construction (e.g., heavy construction = 126%, civil engineering = 125%) and long-period project (equal to or over 48 months construction = 133%) compared to general construction (98~116%) and short-period project (less than 48 months construction = 115%). The proportion of spending expenses was higher in the category of safety manager labor costs (25~52%), safety facility costs (22~40%), and personal protective equipment costs (10~25%). The analysis results of the study can be utilized in revising the standard expense appropriation method by reflecting the current usages of the occupational safety and health management expenses in the construction industry.

The Product Standard Costs System Constructionby Group and Application of Small and Medium Business (중소기업의 제품그룹별 표준원가시스템 구축 및 활용)

  • Kim, Pan-Soo
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.3
    • /
    • pp.153-168
    • /
    • 2011
  • In medium and small firm, the management system which is simple and where there is a practicality is required Ill)re than the management system which is complicated and minute of the centered around large company so that the introduction of the standard costs can be activated and it can be usefully used as a tool of management decisions. A difference between the standard costs introduction plan proposed in this paper and the preexistance study literature are as follows. In this paper, by breaking from the whole cost accounting aiming at all item, that is the traditional introduction method, and presenting the product cost accounting method by group the standards setting object was minimized and simplified. In this way, if the standards setting object is simplified, it is quick at the perimeter environment change as the little man power and flexibly it corresponds to and the cost information calculation which is exact with the setting up and maintenance of the efficient cost standard becomes available. As a result of applying for real through S corp., the usability of the method that the standard costs introduction method proposed in this paper produced the standard costs relatively short within period, it manages was verified. And the standard costs introduction method proposed in this paper went by the various cost information for each products, the management class did the management will decision which was objective and reasonable in the putting first.