• Title/Summary/Keyword: rock anchor

Search Result 91, Processing Time 0.024 seconds

Lateral Load Test on the Bar-type Anti-buoyancy Anchors in the Weathered Rock (풍화암에 시공된 Bar Type 부력앵커의 수평재하시험)

  • Park, Chan-Duk;Lee, Kyu-Hwan;Ryu, Nam-Jae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.165-174
    • /
    • 2004
  • This study is about a horizontal load test of buoyance anchor installed in the section where underground water level happens in the depth of 5m under the ground when the ground is excavated, because the section as a excavation section of high speed railway ${\bigcirc}{\bigcirc}$ station is near a rivers and because the section always has a reservoir of full water level on the left. Therefore, in this study we will appraise the long-term stability of the structure permanently being taken buoyance by the underground water level, through the spot test of the buoyance anchor installed in the section where underground water level happens. For that, Bar Type anchor is used, which can get enough pulling-out force by a method to resist buoyance by using friction force against the ground by high strength steel rod or steel wire. Anti-buoyance anchor is installed on the bottom slab of underground structure being taken horizontal force by the braking and accelerating of high speed train. And, It is aimed to analyze and grasp the review result of stability for the horizontal force that happens at the parking and stopping of high speed train, by executing horizontal load test for the grasping of the movements characteristic of buoyance anchor.

The design and the full load test results of 765kV tower foundation (765kV 철탑기초 설계 및 기초재하시험)

  • Kim, J.B.;Cho, S.B.
    • Proceedings of the KIEE Conference
    • /
    • 1995.11a
    • /
    • pp.447-449
    • /
    • 1995
  • In terms of a new development on the foundation design of 765kV tower and its applications, a revolutionary turning point comes out through this study in approaching the new concept, what we call "Rock anchor" "Deep foundation" to tower foundation which was officially approved by the full load test. this contents is described of the foundation design and the results of full load test for two types foundation.

  • PDF

Plan of Construction Management for Reinforcement Method of Slope (사면보강 공사시 관리 방안)

  • 박종호;정희석;이재덕;홍익표
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.44-51
    • /
    • 2002
  • The construction road and addition work are increasing now. Therefore, slope stability is important in construction slope on the fault and fractured zone. Rock bolt method, soil nailing method and anchor method are applied to reinforcement method of slope. This paper is the study for construction management on reinforcement method of slope.

  • PDF

Preliminary Study on the Behavior of Rock Anchors Subjected to Repeated Loadings (반복하중을 받는 락앵커의 거동에 대한 기초적 연구)

  • 원상연;조남준;황성일
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.1
    • /
    • pp.25-34
    • /
    • 2001
  • 송전철탑의 기초로써 락앵커는 바람에 의해 반복적인 하중을 받고 있다. 반복하중은 락앵커의 인발 지지력 감소와 누적변위의 증가를 유발할 수 있다. 그러므로 송전철탑의 락앵커 설계시 세심한 주의가 요구된다. 본 논문에서는 세 가지 암반형태에 시공된 모형 락앵커에 대하여 반복하중 시험을 수행한 결과들을 제시하였다. 시험결과에 의하면 정적 극한하중의 50%보다 작은 최대 반복하중(Q$_{max}$)이 락앵커에 작용할 경우, 락앵커의 지지력에 대하여 반복하중의 영향이 없다. 최대 반복하중이 정적 극한하중의 50%에서 75%로 작용할 경우 누적변위의 증가를 유발하고, 정적 극한하중의 75%이상인 경우 락앵커의 지지력에 심각한 영향을 미친다. 따라서 정적 극한하중의 50% 이상의 반복하중을 받는 락앵커는 불안정하다.

  • PDF

Supporting Characteristics of a Spiral Bolt through Pull-out Test (인발시험을 통한 스파이럴 볼트의 지보특성)

  • Kim, Jang-Won;Kang, Choo-Won;Song, Ha-Lim
    • Explosives and Blasting
    • /
    • v.29 no.1
    • /
    • pp.10-16
    • /
    • 2011
  • To make large slopes or rock structures stable, supporting systems, such as anchor bolt, rock bolt and spiral bolt which are developed recently, are commonly used. In this study, in-situ pull-out tests were carried out to compare the characteristics of rock bolt that is most widely used with ones of spiral bolt that is newly developed. Re-pull-out test for the spiral bolt in which loading and unloading cycles are repeated three times showed that the maximum pull-out load is almost constant irrespective of the number of loading cycles, which may be due to no failure between spiral bolt and filler. On the other hand, the maximum pull-out load for the conventional rock bolt decreases with the number of loading cycles due to the partial failure between rock bolt and filler.

Probabilistic analysis of anisotropic rock slope with reinforcement measures

  • Zoran Berisavljevic;Dusan Berisavljevic;Milos Marjanovic;Svetlana Melentijevic
    • Geomechanics and Engineering
    • /
    • v.34 no.3
    • /
    • pp.285-301
    • /
    • 2023
  • During the construction of E75 highway through Grdelica gorge in Serbia, a major failure occurred in the zone of reinforced rock slope. Excavation was performed in highly anisotropic Paleozoic schist rock formation. The reinforcement consisted of the two rows of micropile wall with pre-stressed anchors. Forces in anchors were monitored with load cells while benchmarks were installed for superficial displacement measurements. The aim of the study is to investigate possible causes of instability considering different probability distributions of the strength of discontinuities and anchor bond strength by applying different optimization techniques for finding the critical failure surface. Even though the deterministic safety factor value is close to unity, the probability of failure is governed by variability of shear strength of anisotropic planes and optimization method used for locating the critical sliding surface. The Cuckoo search technique produces higher failure probabilities compared to the others. Depending on the assigned statistical distribution of input parameters, various performance functions of the factor of safety are obtained. The probability of failure is insensitive to the variation of bond strength. Different sampling techniques should yield similar results considering that the sufficient number of safety factor evaluations is chosen to achieve converged solution.

Tension Force Monitoring of Tension Type Ground Anchor Using Optical FBG Sensors (광섬유 센서를 이용한 인장형 그라운드 앵커의 장력측정)

  • Sung, Hyun-Jong;Kim, Young-Sang;Kim, Jae-Min;Park, Gui-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.6
    • /
    • pp.17-26
    • /
    • 2011
  • Ground anchor method is one of the most popular reinforcing technology in Korea. For the sound monitoring of slope reinforced by permanent anchor for a long period, monitoring the tension force of ground anchor is very important. However, special technology except conventional load cell has not been developed for this purpose. In this paper, a new method is described to replace the conventional strain gauge and V.W. type load cell which has been commonly used as a prestress force monitoring tool for a short-term and long-term. Four 11.5 m long strain detectable tension type anchors were made using FBG sensor embedded tendon since FBG sensor is smaller than strain gauge type load cell and does not have noise from electromagnetic wave. Each two set strain detectable tension type anchors were installed into the different ground conditions, i.e., soft rock and weathered granite soil. Prestress force of ground anchor was monitored during the loading-unloading step from in-situ pullout test using proposed FBG sensor embedded in the tendon and the conventional load cell Test results show that the prestress force monitored from FBG sensor may well be used practically, for it almost matches with that measured from expensive load cell.

Motion Analysis of Two Point Moored Oil Tanker (2점 계류된 선박에 대한 운동 해석)

  • Lee, Ho-Young;Lim, Choon-Gyu
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2003.10a
    • /
    • pp.232-236
    • /
    • 2003
  • The anchor is laid on seabed and the main engine is worked to against incident environmental loads in typoon. As the main engine is broken down in the storm, the anchor chain is cutted and the vessel is drifted. Although a ship is moored by two point mooring lines to keep the her position, a ship is crashed into a rock because of typoon and the accident of oil spilling may be occured. In this paper, we studied the position-keeping of a ship which is analyized based on the slow motion maneuvering equations considering wave, current and wind. The direct integration method is employed to estimate wave loads. The current forces are calculated by using mathematical of MMG. The two point mooring forces are quasisatatically evaluated by using the catenary equation. The coefficeints of wind forces are modeled from Isherwood’s emperical data and the variation of wind speed is estimated by wind spectrum. The nonlinear motions of a two point moored ship are simulated considering wave, current, wind load in time domain.

  • PDF

Drift Motion Analysis on Horizontal Plane of a Two-Point Moored Oil Tanker (2점 계류된 선박에 대한 수평면상 표류운동 해석)

  • 이호영;임춘규
    • Journal of Ocean Engineering and Technology
    • /
    • v.18 no.3
    • /
    • pp.8-12
    • /
    • 2004
  • The anchor is laid on the seabed, and the main engine is working against incident environmental loads in a typhoon. As the main engine is broken Mum in the storm, the anchor chain is cut and the vessel drifts. Although a ship is moored by two-point mooring lines to maintain her position, it has crashed into a rock because of a typhoon, resulting in a possible accidental oil spillage. In this paper, we studied maintenance of a ship's position, which is analyzed based on the slow motion maneuvering equations considering wave, current, and wind. To estimate wave loads, the direct integration method is employed. The current forces are calculated, using MMG (Mathematical Modeling Group). Th two-point mooring forces are quasi-statistically evaluated, using the catenary equation. Th coefficients of wind forces are modeled from Isherwood's empirical data, and the variation of wind speed is estimated by wind spectrum. The nonlinear motions of a two-point moored ship are simulated, considering wave, current, and wind load, in specific domain of time.

Long-term monitoring of ground anchor tensile forces by FBG sensors embedded tendon

  • Sung, Hyun-Jong;Do, Tan Manh;Kim, Jae-Min;Kim, Young-Sang
    • Smart Structures and Systems
    • /
    • v.19 no.3
    • /
    • pp.269-277
    • /
    • 2017
  • Recently, there has been significant interest in structural health monitoring for civil engineering applications. In this research, a specially designed tendon, proposed by embedding FBG sensors into the center king cable of a 7-wire strand tendon, was applied for long-term health monitoring of tensile forces on a ground anchor. To make temperature independent sensors, the effective temperature compensation of FBG sensors must be considered. The temperature sensitivity coefficient ${\beta}^{\prime}$ of the FBG sensors embedded tendon was successfully determined to be $2.0{\times}10^{-5}^{\circ}C^{-1}$ through calibrated tests in both a model rock body and a laboratory heat chamber. Furthermore, the obtained result for ${\beta}^{\prime}$ was formally verified through the ground temperature measurement test, expectedly. As a result, the ground temperature measured by a thermometer showed good agreement compared to that measured by the proposed FBG sensor, which was calibrated considering to the temperature sensitivity coefficient ${\beta}^{\prime}$. Finally, four prototype ground anchors including two tension ground anchors and two compression ground anchors made by replacing a tendon with the proposed smart tendon were installed into an actual slope at the Yeosu site. Tensile forces, after temperature compensation was taken into account using the verified temperature sensitivity coefficient ${\beta}^{\prime}$ and ground temperature obtained from the Korean Meteorological Administration (KMA) have been monitored for over one year, and the results were very consistent to those measured from the load cell, interestingly.