• Title/Summary/Keyword: roadway support

Search Result 30, Processing Time 0.027 seconds

Coordinated supporting method of gob-side entry retaining in coal mines and a case study with hard roof

  • Liu, X.S.;Ning, J.G.;Tan, Y.L.;Xu, Q.;Fan, D.Y.
    • Geomechanics and Engineering
    • /
    • v.15 no.6
    • /
    • pp.1173-1182
    • /
    • 2018
  • The coal wall, gob-side backfill, and gangues in goaf, constitute the support system for Gob-side entry retaining (GER) in coal mines. Reasonably allocating and utilizing their bearing capacities are key scientific and technical issues for the safety and economic benefits of the GER technology. At first, a mechanical model of GER was established and a governing equation for coordinated bearing of the coal-backfill-gangue support system was derived to reveal the coordinated bearing mechanism. Then, considering the bearing characteristics of the coal wall, gob-side backfill and gangues in goaf, their quantitative design methods were proposed, respectively. Next, taking the No. 2201 haulage roadway serving the No. 7 coal seam in Jiangjiawan Mine, China, as an example, the design calculations showed that the strains of both the coal wall and gob-side backfill were larger than their allowable strains and the rotational angle of the lateral main roof was larger than its allowable rotational angle. Finally, flexible-rigid composite supporting technology and roof cutting technology were designed and used. In situ investigations showed that the deformation and failure of surrounding rocks were well controlled and both the coal wall and gob-side backfill remained stable. Taking the coal wall, gob-side backfill and gangues in goaf as a whole system, this research takes full consideration of their bearing properties and provides a quantitative basis for design of the support system.

Evaluation on Bending Moment of Bridge Approach Slabs under Vehicle Load Considering Soil Settlement (지반침하를 고려한 교량 접속판의 차량하중에 의한 휨모멘트 평가)

  • Back, Sung-Yong;Kim, Jung-Gang;Cho, Baik-Soon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5939-5946
    • /
    • 2013
  • The bridge approach slabs (BAS) to provide a transitional roadway between a roadway pavement and a bridge structure have not performed adequately due to various factors. The current Korean Roadway Design Guidelines treat the BAS as a simply supported beam with 70% of the span length and do not consider settlement and void development underneath the slab. To investigate the effect of soil settlements on the bending moment of BAS, a beam on elastic support (BAS-ES) was used in the present study. The parameters used in this study were span length, washout length, washout location, and soil modulus. It was shown from the parametric study that washout regions closer to the midspan exhibit maximum moment in the slab. Since voids under the BAS have typically been observed to be closer to bridge abutments, the springs from the abutment were removed to simulate settlement and void development in the model. The design moments based on AASHTO LRFD Bridge Design Specifications were compared to those of Korean Standard Specifications for Highway Bridge and Design Trucks for Highway Bridges. Even if the design moment from BAS-ES was used to incorporate the effect of the potential washout, significant savings could still be achieved compared to the current BAS design.

A Study on Integrated Cross Beam Improvement of Through Railway Plate Girder Bridge Support (철도 하로판형교 지점부의 일체형 가로보 개선에 관한 연구)

  • Ha, Yun-Soo;Kim, Doo-Hwan;Song, Kwan-Kwon;Kim, Seong-Pil;Lee, Seong-Geun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.4
    • /
    • pp.114-120
    • /
    • 2018
  • Recently, the plate girder bridge is offen designed a temporary bridge for underground roadway construction have not interrupt railroad operation. The integral support plate girder bridge which have longitudinal girder and cross-girder is improved workability and reduction cost and of construction time. The cross beam of the integral support plate girder bridge has a normal box shape to distribute load on the main girde to end both side girder. In this study, On the change to the web distance of the cross box shows characteristics of related to the stresses and displacements on the flange and web plate. Afterward, the various analysis contributed to the safety improvement of crossbeam of the integral support crossbeam plate girder bridge.

WEB-BASED GEOGRAPHIC INFORMATION SYSTEM FOR CUT-SLOPE COLLAPSE RISK MANAGEMENT

  • HoYun Kang;InJoon Kang;Won-Suk Jang;YongGu Jang;GiBong Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1260-1265
    • /
    • 2009
  • Topographical features in South Korea is characterized that 70% of territory is composed of the mountains that can experience intense rainfall during storms in the summer and autumn. Efficient planning and management of landscape becomes utmost important since the cutting slopes in the mountain areas have been increased due to the limited construction areas for the roadway and residential development. This paper proposed an efficient way of slope management for the landslide risk by developing Web-GIS landslide risk management system. By deploying the Logistic Regression Analysis, the system could increase the prediction accuracy that the landslide disaster might be occurred. High resolution survey technology using GPS and Total-Station could extract the exact position and visual shape of the slopes that accurately describe the slope information. Through the proposed system, the prediction of damage areas from the landslide could also make it easy to efficiently identify the level of landslide risks via web-based user interface. It is expected that the proposed landslide risk management system can support the decision making framework during the identification, prediction, and management of the landslide risks.

  • PDF

Development of Model for Selecting Superstructure Type of Small Size Bridge Using Dual Classification Method (이원분류기법을 이용한 소규모 교량 상부형식선정 모형에 관한 연구)

  • Yun, Su Young;Kim, Chang Hak;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1413-1420
    • /
    • 2015
  • On the design phase of small size bridge, owing to the lack of related guidelines or standards to determine a superstructure type of bridge, many designers tend to select the type depending on expert's experience and knowledge. Moreover, recently, as types of bridge superstructure become diverse and more conditions need to be considered in the project, the decision makes process become complex. This research covered the selection of a superstructure type of a middle or small size bridge with span length of about 50m, which frequently built for national roadway, selecting type of bridge superstructure more systematic way rather than the existing ways to compare construction methods or to depend on expert's experiences. This study proposes to build a bridge superstructure type selection model using one of the techniques of artificial intelligence techniques SVM by applicability of the model examined through the verification of the actual case.

In-vehicle Dilemma Zone Warning System at Signalized Intersections (신호교차로 내 딜레마구간 차내경고시스뎀 개발)

  • Moon Young-Jun;Lee Joo-Il
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.2 no.1 s.2
    • /
    • pp.53-62
    • /
    • 2003
  • This paper demonstrates the in-vehicle dilemma zone warning system (DZWS) project developed as a part of the Driver Advisory and Collision Warning System in Automated Vehicle and Highway System (AVHS). The DZWS project, one of the Korea national ITS projects in 2000 develops the in-vehicle warning device to support drivers' decision making on whether to stop or to proceed to clear the intersection prior to the onset of yellow signal for avoiding the high risk of collision at signalized intersections through the dedicated short range communication (DSRC). This paper explores the design of optimal communication systems between roadway and vehicles, the operational and functional concepts of dilemma zone warning system based on appropriate approach speeds, and the system integration for field test at two sites of signalized intersections. Findings from the system integration indicated that the system would be implemented in eliminating the dilemma zone relative to approach speeds and in reducing red light violations and intersection collisions through the in-vehicle warning device at signalized intersection.

  • PDF

A GIS and Expert System Based Transportation Facility Management System for Local Government (전문가시스템과 지리정보시스템을 이용한 지방정부의 교통시설물관리시스템 개발)

  • Choi, Kee-Choo;Suh, Bon-Yang;Park, In-Cheol
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.5 no.2 s.10
    • /
    • pp.179-192
    • /
    • 1997
  • The purpose of this paper is to implement a GIS and expert system based integrated computing environment for urban facility management, especially with an emphasis on transportation facilities. GIS has been utilized for constructing and managing the database of various transportation facilities, while expert system for executing human expert's role of making priorities, budgeting, and other functions associated with facility management Focusing on roadway sign system, the integrated system proposes new concept of managing sign facilities which leads to the birth of effective decision support system that may be used in local government like Seoul. The proposed concept and system, if supplemented with more functions required by local governments, can be a low cost solution for such facility management tasks. Son discussion and future research agenda have also been addressed.

  • PDF

Development of Urban Flood Analysis Model Adopting the Unstructured Computational Grid (비정형격자기반 도시침수해석모형 개발)

  • Lee, Chang Hee;Han, Kun Yeun;Kim, Ji Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5B
    • /
    • pp.511-517
    • /
    • 2006
  • Flood damage is one of the most important and influential natural disaster which has an effect on human beings. Local concentrated heavy rainfall in urban area yields flood damage increase due to insufficient capacity of drainage system. When the excessive flood occurs in urban area, it yields huge property losses of public facilities involving roadway inundation to paralyze industrial and transportation system of the city. To prevent such flood damages in urban area, it is necessary to develop adequate inundation analysis model which can consider complicated geometry of urban area and artificial drainage system simultaneously. In this study, an urban flood analysis model adopting the unstructured computational grid was developed to simulate the urban flood characteristics such as inundation area, depth and integrated with subsurface drainage network systems. By the result, we can make use of these presented method to find a flood hazard area and to make a flodd evacuation map. The model can also establish flood-mitigation measures as a part of the decision support system for flood control authority.

Assessment of the Locations for Carbon Monoxide Monitoring Stations in Daegu according to Emission Distribution (배출량 분포에 따른 대구시 일산화탄소 측정망 위치의 적절성 평가)

  • Kim, Hyo-Jeong;Jo, Wan-Kuen
    • Spatial Information Research
    • /
    • v.20 no.2
    • /
    • pp.25-34
    • /
    • 2012
  • Air quality in Daegu area is lower compared to many other cities, since Daegu is a basin surrounded by mountains. Accordingly, the present study investigated the location of carbon monoxide(CO) monitoring stations for systematic CO pollution management on the basis of the CO emission distribution in Daegu area. In order to achieve this purpose, the location of CO monitoring stations, which can be used for the establishment of CO management, were assessed. Emission map in Daegu area was prepared using numerical map and Clean Air Policy Support System(CAPSS) data supplied by the M inistry of Environment. Average emissions were estimated by dividing emission sources into four subgroups(roadway, apartment, industry, and municipal incineration facility) according to legal division. The CO emission intensities were subdivided into 10, which a high number represents a high emission intensity, and the current monitoring stations were evaluated for the determination of their steps in CO emission intensities. As a result, additional installation of monitoring stations were suggested for the high CO emission areas rather than the low CO emission areas. A systematic CO management strategy would be established by the supplying various principle CO data when the CO monitoring stations are additionally installed at Kukwudong and other six sites on the basis of analyses of data obtained from 1999 to 2007.

Detailed Analysis of Vertical Connector in Modular Roadway Slab Under Temperature and Lifting Loading (온도하중과 인양하중에 영향을 받는 모듈러 도로 슬래브 수직연결부의 상세해석)

  • Kim, WooSeok;Nam, Jeonghee;Min, Geunhyeong;Kim, Kyeongjin;Lee, Jaeha
    • Journal of the Korea Concrete Institute
    • /
    • v.28 no.5
    • /
    • pp.509-517
    • /
    • 2016
  • In terms of bridge construction, the concrete deck slab is weak members compared to beam members of the bridge supports. Deck slabs must be sound to support and distribute vehicle loads. If slabs are not enough to support the loads, it should be replaced. Bridge deck replacement has been an important industry over the world since the construction is simplified to shorten construction time and to save construction costs. Slab module provides a quickly, easily and reliably construction method in order to avoid high cost and minimum traffic disruption. in addition, slab module shows high reliability since they are factory products. However, slab module should be considered in the performance under various loads. In this study, structural analysis is performed to evaluate the performance of slab module under vehicle loads and temperature loads. Spiral rebar is also utilized around the vertical joints to improve the structural integrity under the lifting loads. In order to confirm the weak area of slab module for the lift condition, numerical analysis has been performed.