• Title/Summary/Keyword: roadbed

Search Result 234, Processing Time 0.049 seconds

A study on the lateral Earth Pressure and Stress Relaxation Region According to the Infinitesimal Deformation of the Wall and Backside Earth Built by Non-excavation Method Under Railroad (철도하부 비개착공법의 벽면배면토사의 미소변형에 따른 수평토압 및 응력이완영역에 관한 연구)

  • Park, Yoon-Sik;Lee, Jun-Seok;Cho, Kook-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2393-2399
    • /
    • 2011
  • In the case where the bottom of railroad is penetrated by non-excavation construction method, the design is performed based on the assumption that there is no displacement and no change of stress However, measurement data showed that reduction of earth pressure and relaxation of stress take place by the displacement. In this study, we investigated the earth pressure on the structure under the railroad constructed by a non-excavation method and the stress relaxation region. The design based on earth pressure is non-economical because it is an over design. Relaxation of stress may lead to road base settlement and rail irregularly due to the reduced railroad supporting stiffness, to ballast crack in the case of concrete roadbed. The result showed that it is reasonable to set the stress on the structures as active earth pressure not as earth pressure at rest. Additionally, the study on the stress relaxation region identified the regions that should be supported in future construction by a non-excavation method.

  • PDF

A Study on Transferred Load Reduction effect of Low Elastic Pad through Dynamic Response Analysis (동적응답해석을 통한 저탄성패드의 전달하중 저감효과 연구)

  • Kim, Hyun-Ju;Lee, Il-Wha;Cho, Guk-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2464-2472
    • /
    • 2011
  • Train runs on high speed and the concrete track is constructed. Rail fastening device needs to reduce elasticity, transferred load, noise, and vibration etc. Consequently, low elastic pad has a great impact of the durability and stability of the track. In this study, discussed in previous studies, static numerical analysis and real scale repeated loading test, followed by dynamic response analysis were implemented. The most distinctive characteristics of the model proposed is to simulate the real wheel behavior on rail. And the main analysis object is to evaluate and compare the deformation characteristics of the transition track while load reduction effect of transfer on roadbed assessed by various low elastic pad.

  • PDF

Evaluating New Track Construction Costs of Two Different Options: Conventional Trains vs. Tilting Trains

  • Rho, Hag Lae;Han, Seong Ho;Kim, Gang Seog
    • International Journal of Railway
    • /
    • v.5 no.3
    • /
    • pp.103-113
    • /
    • 2012
  • Infrastructure costs could be greatly reduced if the need for bridges and tunnels was reduced, or if the line could be shortened. Tilting trains might be a less costly alternative to building new tracks with large curve radii, because tilting trains can negotiate tighter curves without having to decrease their speeds. Tracks built for tilting trains would be cheaper, as they require fewer bridges and tunnels. This paper compares the construction costs of two different options for the new Dodam-Yeoncheong section on the Central line, which includes 148.65 km of new electrified double-track with a design speed of 250 km/h. The first option is to straighten the high-speed line. The second option is to build a line with small radii curves and run tilting trains on the line. In the first option, tunnels would account for about 51% of the new section. In comparison, the second option would have shorter curves and fewer tunnels and bridges which would reduce construction costs. Furthermore, alignment modifications could be made to several segments on the straight line, making the most of the existing roadbed. The analysis concluded that the line suited to tilting trains would be 95.7 million USD cheaper to build the straight route. That is a savings of 2.8% of the total project cost. However, this option would increase the total travel time of the route by 1.2 minutes, which means it is not necessarily the best choice.

A Methodology for Compaction Control of Crushed-Rock-Soil-Fills (암버럭-토사 성토 노반의 다짐 관리 방안)

  • Park, Chul-Soo;Hong, Young-Pyo;Joh, Sung-Ho;Mok, Young-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.607-616
    • /
    • 2006
  • More strict construction control of railway roadbeds is demanded in high speed railway system because of heavier repeated dynamic loading than conventional railways. The aim of this study is to propose a compaction control methodology of crushed-rock-soil-fills including as large particles as $200\sim300mm$ in diameter, which are easily encountered in high speed railway roadbed. Field tensity evaluation and in turn compaction control of such crushed-rock-soil-fills are almost impossible by conventional methods such as in-situ density measurements or plate loading tests. The proposed method consists of shear wave measurements of compaction specimens in laboratory and in-situ measurements of fills. In other words, compaction control can be carried out by comparing laboratory and field shear wave velocities using as a compaction control parameter. The proposed method was implemented at a soil site in the beginning and will be expanded to crushed-rock-soil-fills in future. One interesting result is that similar relationship of shear wave velocity and water content was obtained as that of density and water content with the maximum value at the optimum moisture content.

  • PDF

Construction and Development of Turnout on concrete roadbed applicable to high speed railway (고속철도 적용을 위한 콘크리트 도상 분기기 개발 및 부설)

  • Park, Choon-Bok;Kwon, Ho-Jin;Jeon, Se-Gon;Yoon, Byung-Hyun;Oh, Soo-Jin;Choi, Yong-Seok
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1223-1228
    • /
    • 2007
  • Since KHSL 2nd phase was adapted as a main track design, the interests of concrete slab track system have been gradually increased in the division of rail track engineering and many engineering companies have been trying to adapt a concrete slab track system at this moment. Advantages of this system proved in advanced country, japan and Germany etc. are excellent maintenance, track stability and increasing of buckling resistance This developed turnout is same with the KHSR 1st phase's design and applications rules, components and signaling system since it observes KTX specification. Comparing it with the former turnout, High-elasticity pad, lubrication-free roller slide plate and Rheda2000 PC sleeper are only different. The purpose of this study is the development of high speed turnout on concrete slab track and its application on site. Now these studies are going to show the verification and confidence about the interface between ballast-track and concrete slab track by finding and solving the possible problems when it is installed on site and to make these turnouts applied perfectly and completely on concrete slab track. Its first trial construction in korea had been successfully completed at Sangju-station on July 20th ,2007 thanks to KORAIL and KR. Hereunder Sampyo E&C trys to introduce all of turnout technologies on concrete slab track system with Rheda 2000 sleeper

  • PDF

Structure of Integrated Adaptive Catenary Inspection System for Improved Safety (안전성 고도화를 위한 융합-가변형 전차선 검측시스템의 구조)

  • Kim, Ji-Yoon;Kim, Jung-Phyung;Kim, Woo-Saeng
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.9
    • /
    • pp.147-152
    • /
    • 2015
  • Almost all existing inspection methods for catenary system have relied on dedicated track inspection cars. Two factors make it necessary to modify the conventional method: First, the climate has become increasingly similar to that of a subtropical area. In addition, high speed trains have been developed that can run as fast as 450Km/h. This paper presents a visual catenary inspection system structure that incorporates roadbed information for high-speed running environments. Conventional catenary inspection systems determined the degree of wearing only for the trolley wire. The facility inspection system presented in this paper on the other hand utilizes visual and sound data of inspection targets and adjusts inspection frequency and sensitivity depending on the geographic data.

The Strength Characteristics By Freezing and Thawing of Controlled Low Strength Material Using Coal Ash (석탄회를 활용한 CLSM의 동결융해에 의한 강도 특성)

  • Hyun, Ho-Gyu;Kim, Sun-Tae;Jung, Hyuk-Sang;Chun, Byung-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09b
    • /
    • pp.32-37
    • /
    • 2010
  • Recently, the land area for many people has been limited because of industrialization and modernization in Korea. The large-scale constructions like the reclamation development projects have been progressed to resolve this problem mentioned above. Therefore, as many of the usefulconstruction materials as possible are needed to perform the large-scale construction projects. Many studies for the utilization of pond ash which has a similar characteristic of sand have been conducted and there has been often occurred many structural problems on roadbed in winter. Therefore, the characteristics of the freezing and thawing for Controlled Low-Strength Material (CLSM) using pond ash were analyzed and evaluated by unconfined compressive strength test in this study. As a result of this study, it was confirmed that new CLSM using pond ash with cement (8.2% by weight)was able to stand for the freezing and thawing behavior.

  • PDF

Measurements and Analysis of Deformation States in Roadbed in Gyeongbu High Speed Railway (경부고속철도 토공부에 대한 변형상태 계측 및 분석)

  • Jin, Nam-Hee;Kim, Nam-Hyuk;Shim, Hyun-Woo
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1542-1549
    • /
    • 2009
  • The function of subgrade in the railway is to support track load on the subgrade as well as train load. Unlike the traditional railway, the uppermost subgrade layer in the Gyeongbu high speed railway was constructed as the reinforced road bed. The reinforced road bed comprises sub-ballast in the upper part and grade ballast in the lower part. The filling material such as soil and rocks in the subgrade can be settled by consolidation of original ground, compression due to self weight, plastic displacement due to train operation, and unequal settlement due to embankment material or improper compaction, therefore many efforts have been given for sufficient compaction and use of proper filling materials in the construction stage. The purpose of this study is to investigate the deformation state of subgrade in the Gyeongbu high speed railway. The investigation on the subgrade settlement was performed by choosing representative sections suspected to be settled based on the previous GPR test results and track maintenance history, measuring the settlement for some time period after installing settlement measuring instruments on and under the reinforced road bed. and analyzing the long-term subgrade settlement data from monitoring system which was installed at the construction stage of the high speed railway.

  • PDF

A Study on 3D Evaluation and Reduction Method for Vibration of Track-Roadbed due to Railway Load (열차하중으로 인한 궤도-지반의 3D 진동평가 및 저감방법에 관한 연구)

  • Kang, Bo-Soon
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.1
    • /
    • pp.39-48
    • /
    • 2011
  • The paper describes four practical cases of railway structure concerning a three-dimensional numerical approach to analyse dynamic soil-structure interaction(SSI)of railway tracks on layered soil under transient load in the time domain. The SSI-Model has been implemented in TDAPIII accounting for nonlinear properties of the track and soil. The approach can be also be used to calculate vibration propagation in the soil and its effect on nearby buildings and structure. The Method is applied to analyse the dynamic response of railway tracks due to a moving wheel set. Finally some sample are given in order to reduce the vibration at the point of emission, at the transmission path and the structure itself.

Properties of Lightweight Foamed Concrete According to the Replacement Ratio of Waste Concrete Sludge and Variation of Foam Ratio (폐콘크리트슬러지 대체율과 기포혼입률 변화에 따른 경량기포콘크리트의 특성)

  • Lee, Jung-Goo;Kim, Jae-Won;Choi, Hun-Gug;Kang, Cheol;Lee, Do-Heun;Kim, Jin-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.11a
    • /
    • pp.53-56
    • /
    • 2007
  • Recently, waste concrete emission has been increased by acceleration of urban development and the rapid growth of redevelopment projects, so recycling of waste concrete is actively progressed, But the usage is limited to a lower value added such as the roadbed material etc. To produce the high quality recycled aggregate, breaking and washing process is added to the existing process and inevitably increases the occurrence of particle, because old mortal is included in the recycled aggregate. Therefore, this study purpose is analysis the properties of lightweight foamed concrete made by waste concrete sludge which is the by-product from produce the recycled aggregate. In result, possibility of manufacture of lightweight foamed concrete which gives equal performance compared with ALC was detect(scope of density : $0.5{\sim}0.6$, scope of compressive strength : $3.5{\sim}4.0MPa$). And scope of porosity is as follow ; total porosity : $27{\sim}30%$, open porosity : $1{\sim}5%$

  • PDF