• Title/Summary/Keyword: river bed slope

Search Result 74, Processing Time 0.027 seconds

Environment of Optimal Location of the Dwelling in Unseo-dong Relics Group, Yeongjong-do, Incheon in the Neolithic Age - In Terms of Geographical and Geomorphological Characteristics - (인천 영종도 운서동유적그룹의 신석기시대 주거지 최적 입지환경 - 지리 및 지형학적 관점에서 -)

  • Park, Ji Hoon;Lee, Ae Jin
    • Journal of The Geomorphological Association of Korea
    • /
    • v.20 no.3
    • /
    • pp.15-25
    • /
    • 2013
  • The purpose of this study is to identify the environment of optimal location of the dwelling (hereafter referred as dwelling site) in the Neolithic Age found in Unseo-dong relics group, Yeongjong-do, Incheon from the geographical and geomorphological perspectives. For this purpose, micro-landform, altitude, gradient, distance from the river of water available for use and the difference between the highest altitude and lowest altitude of river bed of water available for use based on change of dwelling site over periods were analyzed targeting ground surface of hills where individual dwelling sites (a total of 68 sites) discovered in investigation area so far. As a result, it was shown that the Upper sideslope were selected as the primary dwelling location standard in investigation area where the Neolithic people lived upon selecting the dwelling site (or settlement). In addition, the ground surface of dwelling site had the altitude of 21-31m and slope of $5-10^{\circ}$ (gentle slope) as the secondary and it had distance of 514-549m from the river of water available for use and difference of 11-23m between the highest altitude and lowest altitude of river bed of water available for use. Thus, it was shown that the space to get water relatively easy from two places at the same time was the secondary dwelling location standard.

Potential of River Bottom and Bank Erosion for River Restoration after Dam Slit in the Mountain Stream

  • Kang, Ji-Hyun;So, Kazama
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.46-46
    • /
    • 2011
  • Severe sediment erosion during floods occur disaster and economic losses, but general sediment erosion is basic mechanism to move sediment from upstream to downstream river. In addition, it is important process to change river form. Check dam, which is constructed in mountain stream, play a vital role such as control of sudden debris flow, but it has negative aspects to river ecosystem. Now a day, check dam of open type is an alternative plan to recover river biological diversity and ecosystem through sediment transport while maintaining the function of disaster control. The purpose of this paper is to verify sediment erosion progress of river bottom and bank as first step for river restoration after dam slit by cross-sectional shear stress and critical shear stress. Study area is upstream reach of slit check dam in mountain stream, named Wasada, in Japan. The check dam was slit with two passages in August, 2010. The transects were surveyed for four upstream cross-sections, 7.4 m, 34 m, 86 m, and 150 m distance from dam in October 2010. Sediment size was surveyed at river bottom and bank. Sediment of cobble size was found at the wetted bottom, and small size particles of sand to medium gravel composed river bank. Discharge was $2.5\;m^3/s$ and bottom slope was 0.027 m/m. Excess shear stress (${\tau}_{ex}$) was calculated for hydraulic erosion by subtracting the values of critical shear stress (${\tau}_{c}$) from the value of shear stress (${\tau}$) at river bottom and bank (${\tau}_{ex}=\tau-{\tau}_c$). Shear stress of river bottom (${\tau}_{bottom}$) was calculated using the cross-sectional shear stress, and bank shear stress (${\tau}_{bank}$) was calculated from the method of Flintham and Carling (1988). $${\tau}_{bank}={\tau}^*SF_{bank}((B+P_{bed})/(2^*P_{bank}))$$ where $SF_{bank}=1.77(P_{bed}/p_{bank}+1.5)^{-1.4}$, B is the water surface width, $P_{bed}$ and $P_{bank}$ are wetted parameter of the bed and bank. Estimated values for ${\tau}_{bottom}$ for a flow of $2.5\;m^3/s$ were lower as 25.0 (7.5 m cross-section), 25.7 (34 m), 21.3 (86 m) and 19.8 (150 m), in N/$m^2$, than critical shear stress (${\tau}_c=62.1\;N/m^2$) with cobble of 64 mm. The values were insufficient to erode cobble sediment. In contrast, even if the values of ${\tau}_{bank}$ were lower than the values for ${\tau}_{bottom}$ as 18.7 (7.5 m), 19.3 (34 m), 16.1 (86 m) and 14.7 (150 m), in N/$m^2$, excess shear stresses were calculated at the three cross-sections of 7.5 m, 34 m, and 86 m distances compare with ${\tau}_c$ is 15.5 N/$m^2$ of 16mm gravel. Bank shear stresses were sufficient for erosion of the medium gravel to sand. Therefore there is potential to erode lateral bank than downward erosion in a flow of $2.5\;m^3/s$. Undercutting of the wetted bank can causes bank scour or collapse, therefore this channel has potential to become wider at the same time. This research is about a potential of sediment erosion, and the result could not verify with real data. Therefore it need next step for verification. In addition an erosion mechanism for river restoration is not simple because discharge distribution is variable by snow-melting or rainy season, and a function for disaster control will recover by big precipitation event. Therefore it needs to consider the relationship between continuous discharge change and sediment erosion.

  • PDF

A Study on Estimation of the Delivery Ratio by Flow Duration in a Small-Scale Test Bed for Managing TMDL in Nakdong River (낙동강수계 수질오염총량관리를 위한 시범소유역 유황별 유달율 산정방법 연구)

  • Shon, Tae-Seok;Park, Jae-Bum;Shin, Hyun-Suk
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.5
    • /
    • pp.792-802
    • /
    • 2009
  • The objective of this study is to construct the watershed management system with link of the non-point sources model and to estimate delivery ratio duration curves for various pollutants. For the total water pollution load management system, non-point source model should be performed with the study of the characteristic about non-point sources and loadings of non-point source and the allotment of pollutant in each area. In this study, daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator and SWAT model. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. As a result, the SWAT simulation results show good agreements in terms of discharge, BOD, TN, TP but for more exact simulation should be kept studying about variables and parameters which are needed for simulation. And as a result of the characteristic discharges, pollutants loading with the runoff and delivery ratios, non-point sources effects were higher than point sources effects in the small-scale test bed of Nakdong river basin.

Development of a Stream Discharge Estimation Program (자연하천 유량산정 프로그램 개발)

  • Lee Sang Jin;Hwang Man Ha;Lee Bae Sung;Ko Ick Hwan
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.1
    • /
    • pp.27-38
    • /
    • 2006
  • In this study, we developed a program to estimate discharge efficiently considering major hydraulic characteristic including water level, river bed, water slope and roughness coefficient in a natural river. Stream discharge was measured at Gongju gauge station located in the down stream of the Daechung Dam during normal and dry seasons from 2003 to 2004. The developed model was compared with the results from the existing rating curve at T/M gage stations, and was used for runoff analyses. Evaluating the developed river discharge estimation program, it was applied during 1983-2004 that base flow separation method and RRFS (Rainfall Runoff Forecasting System) which is based on SSARR (Streamflow Synthesis And Resevoir Regulation). The result presents the stage-discharge curve creator range at the Gong-ju is overestimated by approximately $10-20\%$, especially at the low stage. It is attributed to the hydraulic characteristics at the study. The discharge simulated by the RRFS and base flow separation, which is calibrated using the measurement at the early spring and late fall season during relatively d]v season, shows the least errors. The coefficient of roughness at Gongju station varied with the high and low water level.

Evaluation of the effects of the river restoration in Hwangji Stream, the upstream reach of the Nakdong River

  • Bong Soon Lim;Jaewon Seol;Chang Seok Lee
    • Journal of Ecology and Environment
    • /
    • v.48 no.1
    • /
    • pp.85-95
    • /
    • 2024
  • Background: In Korea, riparian zones and some floodplains have been converted into agricultural fields and urban areas. However, there are essential for maintaining biodiversity, as they are important ecological spaces. There are also very important spaces for humanity, as they perform various ecosystem services in a changing environment including climate change. Due to the importance of rivers, river restoration projects have been promoted for a long time, but their achievement has been insignificant. Development should be pursued by thoroughly evaluating the success of the restoration project. Ecological restoration is to accelerate succession, a process that a disturbed ecosystem recovers itself, with human assistance. Ecological restoration can be a test bed for testing ecological theories in the field. In this respect, ecological restoration should go beyond a 'simple landscaping exercise' and apply ecological models and theories in restoration practice. Results: The cross-section of the restored stream is far from natural rivers due to its steep slope and artificial material. The vegetation profiles of the restored streams did not reflect the flooding regime of the river. The species composition of the vegetation in the restored stream showed a significant difference from that of the reference stream, and was also different from that of an unrestored urban stream. Although species richness was high and the proportion of exotic species was low in the restored stream, the effect was offset by the high proportion of gardening and landscaping plants or obligate terrestrial plants. Conclusions: Based on both the morphological and ecological characteristics of the river, the restoration effect in the restored stream was evaluated to be very low. In order to solve the problems, a systematic adaptive management plan is urgently required. Furthermore, it is necessary to institutionalize the evaluation of restoration effects for the development of river restoration projects in the future.

Channel Migration of Byeongmun River Caused by Roof Collapse of Gurin Cave in Mount Halla, Jeiu Island (한라산 구린굴의 천장 함몰로 인한 병문천의 유로 변경)

  • Kim, Tae-Ho;An, Jong-Gi
    • Journal of the Korean Geographical Society
    • /
    • v.43 no.4
    • /
    • pp.466-476
    • /
    • 2008
  • Gurin Cave, 442 m long, is a lava tube developed on the northern slope of Mount Halla. Seventy-three meters of its lower reach became a river channel since Byeongmun River flowed into a window after roof collapse took place. The subterranean channel has a width of 447 cm and a height of 501 cm, respectively. Its banks show well-developed lava shelves of a typical lava tube, while its floor has sculpted forms which characterize a bed of a bedrock stream. The reach is likely to be collapsed and then has four collapsed windows since its roof has the densely developed testudinal joints and consists of thin lavas with a thickness of 30 to 60 cm. Before the subterranean channel appeared, a ground channel flowed over the cave and joined into a main channel of Byeongmun River at 653 m in altitude. However, the subterranean channel substituted the ground channel since a bed of the ground channel collapsed into the cave. The new channel, flowing through the cave, joined into a main channel at 660 m in altitude. As the drainage area of Byeongmun River expanded upstream the cave, the new channel changed into a main channel. Since floodwater flows down the ground channel as well as the subterranean channel, a distributary stream has temporarily appeared at the collapsed window. Lava tubes are likely to have an affect on the development of river system in Jeiu Island, in that the caves have constantly shown roof-fall.

Stable Channel Design for the Gravel-bed River Considering Design Constraints (설계구속인자를 고려한 자갈하상 하천의 안정하도 설계)

  • Ji, Un;Jang, Eun-Kyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.4
    • /
    • pp.2860-2867
    • /
    • 2015
  • Stable channel design is to determine the width, depth and slope for satisfying the condition that the upstream incoming sediment rate is equal to the sediment transport rate at the design channel. Therefore, the most sensitive variable when designing a stable channel is the selection of a sediment transport equation applied for the channel design. Especially if in the case of gravel beds the designer uses the equation developed by using the data of sand rivers, the calculation result of the stable channel section has large errors. In this study, the stable channel design has been applied to the gravel bed river using the previous stable channel design program with newly added the sediment transport equation for gravel beds; and the stable channel section considering design constraints has been produced by using the analytical method. As results, in the case of the application with the fixed width, the depth predicted by Ackers and White's equation was the shallowest and Meyer-Peter and $M\ddot{u}ller's$ equation was 0.8 m deeper than the current section of 2.4 m. In the case of the application with the fixed depth, the width predicted by Engelund and Hansen's equation was twice wider than the current section and by Meyer-Peter and $M\ddot{u}ller's$ equation was 20 m wider than the current section of 44 m.

Prediction MOdels for Channel Bed Evolution Due to Short Term Floods (단기간의 홍수에 의한 하상변동의 예측모형)

  • Pyo, Yeong-Pyeong;Sin, Cheol-Sik;Bae, Yeol-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.6
    • /
    • pp.597-610
    • /
    • 1997
  • One-dimensional numerical models using finite difference methods for unsteady sediment transport on alluvial river channel are developed. The Preissmann implicit scheme and the Lax-Wendroff two-step explicit scheme with the Method of Characteristics for water motion and a forward time centered space explicit scheme for sediment motion are developed to simulate the sediment transport rate and the variation of channel bed level. The program correctness of each model is successfully verified using volume conservation tests. The sensitivity studies show that higher peak stage level, steeper channel slope and longer flooding duration produce more channel bed erosion. and median grain size, $D_{50}=0.4mm$ give maximum volume loss in this study. Finally, the numerical models are found to produce reasonable results from the various sensitivity tests which reveal that the numerical models have properly responded to the changes of each model parameter.

  • PDF

A Study on the Channel Planform Change Using Aerial Photographs and Topographic Map in the Mangyoung River (영상자료를 이용한 만경강 하도변화에 관한 연구)

  • Hong, Il;Kang, Joon-Gu;Yeo, Hong-Koo
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.2
    • /
    • pp.127-136
    • /
    • 2012
  • River is able to change by various environmental factors. In order to conduct river restoration design, it is necessary to evaluate the stable channel through the analysis of past and present river channels. River evaluation requires various data, such as geometry, hydraulic and hydrology, but there is a lot of difficulty to understand topographical information of river change on time and space due to a lack of past data by domestic conditions. This study was analyzed abandoned channel formation, changes in the vertical-section and cross-section length of rivers, and micro-landform changes etc using an image analysis technique. Purpose of this research is to evaluates the stable channel through a river channel morphology change from past and present river channels image. Mangyoung river was conducted artificial river maintenance through straight channel consolidation form 1920 to 1930 year. In the result river maintenance, mangyoung river length was decreased by 15 km and abandoned channels of six points were made. Since then, weir was continuously increased to control bed slope and use water. Install of weir was to be the reason of changes on channel width, thalweg, vegetated bar, sand bar, water area. Present Mangyoung river show that water area was temporary increased in upper and middle reach because of weir installation. Total sand bar was only decreased in upper channel. The change of vegetated bar and sand bar was slight recently. In this result, Mangyoung river is inferred to reach stabilized channel although there is some difference to the lower reach.

Handling Method for Flux and Source Terms using Unsplit Scheme (Unsplit 기법을 적용한 흐름율과 생성항의 처리기법)

  • Kim, Byung-Hyun;Han, Kun-Yeon;Kim, Ji-Sung
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.12
    • /
    • pp.1079-1089
    • /
    • 2009
  • The objective of this study is to develop the accurate, robust and high resolution two-dimensional numerical model that solves the computationally difficult hydraulic problems, including the wave front propagation over dry bed and abrupt change in bathymetry. The developed model in this study solves the conservative form of the two-dimensional shallow water equations using an unsplit finite volume scheme and HLLC approximate Riemann solvers to compute the interface fluxes. Bed-slope term is discretized by the divergence theorem in the framework of FVM for application of unsplit scheme. Accurate and stable SGM, in conjunction with the MUSCL which is second-order-accurate both in space and time, is adopted to balance with fluxes and source terms. The exact C-property is shown to be satisfied for balancing the fluxes and the source terms. Since the spurious oscillations in second-order schemes are inherent, an efficient slope limiting technique is used to supply TVD property. The accuracy, conservation property and application of developed model are verified by comparing numerical solution with analytical solution and experimental data through the simulations of one-dimensional dam break flow without bed slope, steady transcritical flow over a hump and two-dimensional dam break flow with a constriction.