• Title/Summary/Keyword: risks factors

Search Result 1,230, Processing Time 0.027 seconds

A Study on Correlation Analysis of Risk Factors for Urban Regeneration Using ISM method (ISM기법을 이용한 도시재생사업 리스크 요인의 상관성 분석에 관한 연구)

  • Park, Beom-Suk;Jin, Run-Zhi;Han, Sangwon;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.192-193
    • /
    • 2013
  • In recent years, risks associated with mixed used development in urban regeneration projects which have actively been implemented have been on the rise due to uncertainties and complexities of those projects. Thus, risk management is needed to effectively manage those risks that may occur during the process of a project. Many studies have contributed to deal with risk management of those projects. These studies, however, have focused main on identification stage and deriving the main risk factors and have limitations on presenting the relationship among those risk factors. Since many risks are interdependent and have multiple effects, the purpose of this study is to present a way(ISM method) to provide a hierarchical structural framework of risks in Urban Regeneration. The structural of risks can helps decision makers to trace the actual source of these risks.

  • PDF

MODELLING OF THE RISKS FACED BY INDIAN CONSTRUCTION COMPANIES ASSESSING INTERNATIONAL OPPORTUNITIES

  • M.N. Devaya;N.K. Jha
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.140-149
    • /
    • 2007
  • Indian construction companies have only 0.05% market share in the 3-4 trillion dollar global construction business and only two Indian construction companies figure in the ENR "Top 225 Global Contractors 2006" list. Hence, while enormous scope for growth exists, international construction experience is limited. This study explores the risks as perceived by Indian companies venturing abroad since risks in international construction differ from home market risks. Literature survey identified a number of risk factors that were evaluated by the experts, highlighting fourteen important risk factors. Interpretive Structural Modelling (ISM) was used to develop a hierarchical model showing the relationships between the different risk factors, thus helping to focus on the key risks for effective risk management. The study shows that poor project management is a key risk forming the hub of the system, while political instability has maximum influence. The results of the study can be used by managers to visualise the risks in perspective and prioritise the mitigation effort.

  • PDF

Risk Factors Affecting Equipment Management in Construction Firms

  • PHAM, Cuong Phu;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To;LE, Loan Phuc;DUONG, My Tien Ha
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.11
    • /
    • pp.347-356
    • /
    • 2020
  • Mechanization and automation constitute an essential stage in the production and operation of any company, as one of the determinants of increase in labor productivity and decrease in product price, while significantly contributing to shortening of the lead time. Businesses are, therefore, able to quickly put projects into operation, improving economic efficiency, quality, and aesthetics, which speeds up the national economic growth. For the construction industry to be the most effective, modern construction equipment is a necessity. It is one of the five main resources of a construction project. Thus, effective construction equipment management contributes to the success of a project and benefits the relevant construction companies economically. This paper presents the critical risk factors affecting equipment management and proposes suitable solutions. The questionnaire-based survey with experienced experts in the construction sector on the management of the likelihood and consequence of risk factors revealed thirty-two risks for equipment management in construction companies. These factors fell into six groups: (i) site organization-related risks; (ii) management-related risks; (iii) owner-related risks; (iv) supplier-related risks; (v) legal risks, and (vi) site condition-related and external risks. The results showed that management-related factors contributed to the most significant risks and problems for equipment management in construction companies.

The Study of Factors Related to Internet Auctions Participation (인터넷 경매참여 관련변인에 관한 연구)

  • Lee, Eun-Hee;Nam, Su-Jung
    • Journal of Families and Better Life
    • /
    • v.25 no.2 s.86
    • /
    • pp.123-135
    • /
    • 2007
  • This study investigated the influence of values associated with internet auctions and risks associated with participating in internet auctions. The results of this study were as follows: First, the values associated with internet auctions consisted of hedonic value, information value, and practical value. Among these values, hedonic value was the highest, and information value was the lowest. Second, He risks consisted of functional risk, privacy risk, socio-psychological risk, md financial risk. Among these risks, functional risk was the highest, and socio-psychological risk was the lowest. Results of regression analysis using demographic elements to inspect risk factors revealed sex, age, and income were statistically significant finally, with respect to demographic characteristics and influences of the aforementioned values and risks, the factors influencing participation in internet auctions were sex, age, hedonic value, functional risk and financial risk.

An Exploratory Study on the Information Technology Outsourcing Risk Factors: An IPO Perspective (IPO 관점에서의 정보기술 아웃소싱 위험요인에 관한 탐색적 연구)

  • Yang Kyung sik;Kim Hyun soo
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.3
    • /
    • pp.35-62
    • /
    • 2004
  • Recently, IT outsouricng has been one of the major concerns of many companies. This paper explores the relationship between information technology outsourcing risk factors and outsourcing performance. It is based upon a three-phase process utilizing IPO (Input-Process-Output) system. The first phase means the outsourcing planning risks t~at arise from overall environment of outsourcing, organizational refuse, and wrong contracts. The second phase implies outsourcing operational risks, which are occurred while out-sourcing perform and consist of organizational acceptances of outsourcing, partnership and hidden costs. The last phase is outsourcing performance based on four perspective of BSC(Blanced Scored Card). The survey was performed on the IT/IS firms, and the data was collected from 53 service receivers. The result of the analysis are as follows. First, Outsourcing planning risks positively affects the operational risks. Second, Outsourcing operational risks negatively affects the Outsourcing Performance.

  • PDF

Risk analysis using PROMETHEE method In Building Construction MANAGEMENT

  • Jang-Young Lee;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1364-1369
    • /
    • 2009
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopt the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE method makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to prove the possibility of the PROMETHEE analysis process by being compared with AHP.

  • PDF

A study on the conceptual structure of purchase risks in fashion consumption through online channels (온라인 채널에서의 패션 소비에 관한 구매위험의 구조적 개념 연구)

  • An, Sang-Hee
    • The Research Journal of the Costume Culture
    • /
    • v.27 no.5
    • /
    • pp.496-511
    • /
    • 2019
  • The purpose of this study was to create a theoretical structure for the concept of purchasing risks by identifying the structure of purchasing risks that lead to obstacles in the purchasing decisions of consumers in fashion consumption via online channels. This was a secondary research using books, articles, prior researches, and academic journals on the five topics of "characteristics of fashion consumption," "the concept of purchasing risks," "purchasing risks by product types," "purchasing risks by channel types," and "purchasing risks of fashion consumption on online shopping channels." According to the arguments of prior researches, the study divided the purchasing risks of fashion consumption through online shopping into four categories : (1) fundamental purchasing risks including financial risk and time loss risk pertaining to any product or channel, (2) online channel purchase risks, which include risks in payment, Information leaks, and delivery and return/exchange risk, (3) fashion product risk related to product quality or experience of other people, which includes social risks and risks associated with quality, and (4) the online channel${\times}$fashion product risks, which include the aesthetic and psychological hazards especially amplified in online channels. The four risk factors were then described with a concept map to systemize the multi-dimensional and stereoscopic psychological structure of purchasing risks. Of the four risk factors, consumers placed the most emphasis on the online channel${\times}$fashion product risks, hence, reducing this risk factor is of utmost priority for marketing of online shopping channels.

Weight Evaluation of Risk Factors for Early Construction Stage (초기 건설공사 리스크인자의 중요도 산정)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.115-122
    • /
    • 2004
  • This study identifies various risk factors associated with activities of early construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The Common risks are identified and classified by considering various aspects of the early construction stage such as financial, political, constructional aspects, etc. The risks for Earth works and Foundation works are identified in detail by surveying technical specifications, relevant claim cases and interviewing with experts. These risks are classified based on the Wok Breakdown Structure(WBS) of the early construction stage. The WBS presented in this study classifies the works of early construction stage into four categories; excavation, sheeting works, foundation works, footing works. This study suggests a risk analysis method using fuzzy theory for construction projects. Construction risks are generally evaluated as vague linguistic value by subjective decision making. Fuzzy theory is a proper method to quantify vague conditions of construction activities. Therefore, this study utilizes fuzzy theory to analyse construction risks. The weight of risks is estimated by reflecting the interrelationship among risk factors from absolute weights obtained by fuzzy measure into the relative weights by Analytical Hierarchy Process(AHP). The interrelationship is estimated by Sugeno-fuzzy measure.

IDENTIFYING CRITICAL RISKS IN PUBLIC PRIVATE PARTNERSHIP PROJECTS IN SINGAPORE

  • Xianbo Zhao;Bon-Gang Hwang;Mindy Jiang Shu Gay
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.444-450
    • /
    • 2013
  • Public private partnership (PPP) procurement was introduced into Singapore in 2003, and 10 PPP projects was successfully completed and have been in operation. The objective of this study is to identify the critical risk factors and risk allocation preferences for PPP projects in Singapore. To achieve this objective, a comprehensive literature review was carried out and 42 risks were identified and grouped into three meta levels, i.e. macro, meso and micro levels. The questionnaire survey produced 48 completed questionnaires from 48 different contractors. The survey results indicated that 23 risk factors had significantly high criticalities and that four macro-level risks, four meso-level risks and two micro-level risks were among the top 10 risk ranking. "Lack of support from government", "availability of finance" and "construction time delay" were perceived as the top three critical risks. Also, the result implied that micro-level risks had a higher criticality mean score than macro-level and meso-level risks. The findings of this study help both public and private sectors to better understand the risks and their allocation in PPP projects, providing valuable information for organizations that intend to participate in PPP projects in Singapore.

  • PDF

A Study on the Relationship between Perceived Risks and Return Behavior on Internet Clothing Shopping (인터넷 의류구매 시 소비자의 위험지각과 반품과의 관계)

  • Ji, Hye-Kyung
    • Fashion & Textile Research Journal
    • /
    • v.10 no.6
    • /
    • pp.917-925
    • /
    • 2008
  • The purpose of this study was to find out the relationship between consumer's perceived risks and return behavior on internet clothing shopping. Questionnaires were distributed to the consumers, total 517, males and females, aged from 20 to 39, who had experience of clothing purchasing through internet shopping malls. The results showed that consumer's return factors related to the perceived risks on internet shopping process. The results were as follows. First, factors of perceived risks in internet clothing shopping were categorized into product performance, account-related, delivery, economic, and social psychological risk. 5 consumer types of perceived risk were segmented by low-perceived risk group, product performance/delivery-perceived risk group, account related-perceived risk group, harmony with oneself/account related-perceived risk group, and harmony with others/economic-perceived risk group. Second, the consumer's perceived risks on internet shopping process affected one's return behavior. The factors of return was differentiated on the types of consumer's perceived risk. The relation between consumer's perceived risks and return behavior on internet clothing shopping was significant. Therefore company had better draw various strategies to manage consumer's perceived risk, in order to reduce the returns and improve consumer's satisfaction.