The assessment of exposure is an important component of the risk assessment process. Exposure information is used in risk assessment in at least two ways: 1) in the identification of hazards and the epidemiologic research investigating exposure-response relationships and 2) in the development of population exposure estimates. In both of these cases, the value of a chemical risk assessment is enhanced by improvements in the quality of exposure assessments. The optimum exposure assessment is the direct measurement of population exposure; however, such measurements are rarely available. Recent developments in methods for exposure assessment allow estimates to be made that are valid representations of actual exposure. The use of these exposure estimates to classify exposures correctly enhances the likelihood that causal associations between exposure and response will be correctly identified and that population risks will be accurately assessed.
International conference on construction engineering and project management
/
2011.02a
/
pp.107-110
/
2011
The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, falsework (temporary structures) in construction projects is fundamentally important. However, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. It is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop the safety assessment system, this research utilizes the BIM technology and collects important information by importing data from BIM models and use it in the planning stage.
Journal of the Korea Institute of Information Security & Cryptology
/
v.27
no.1
/
pp.129-145
/
2017
This study proposes a methodology to estimate the financial damages by personal information breach of a company and to analyse risk systematically through a case study of a company which experiences private information breach. Using FAIR(Factor Analysis of Information Risk) model, estimate the loss amount and to analyse risk objectively of a company by personal information breach. This study estimates adequacy and importance of corresponding factors applying AHP(Analytic Hierarchy Process) on each factors for assessing loss amount. By adopting proposed methodology in this study, the person in charge of actual work can assess and prove the loss amount though the latest risk estimation methodology. In addition, the person in charge can select the proper parameters for the corresponding company and can obtain the objective quantitative estimation. Hence it can be reported to the management by accurately assessing loss amount caused by personal information breach.
Korean Journal of Construction Engineering and Management
/
v.6
no.3
s.25
/
pp.135-143
/
2005
The purpose of this study is to diminish the risk through identifying the risk factors occurring in the process of real estate development projects, and analyzing and coping with the risk factors, and enable stable advance in the development process by improving the roles and work distribution of the project investor. The results of this study are as follows : 1) identifying the risks of contractions from the step of selecting the sites must be made possible through supplemental human resources expertise in plan and construction of the operation 2) as an improvement scheme, heightening the penetration wall of development projects from the investors, proposing a registration law and a selection standard of construction companies to investors' cooperating companies enabling the growth of superior investors.
Information system failure is various such as program test unpreparedness, physical facilities for damage prevention unpreparedness from simple software error. Although cross is trifling the result causes vast damage. Recently, became difficult by simple outside security system to solve this problem. Now, synthetic countermove establishment and suitable confrontation connected with danger came in necessary visual point about general Information Technology of enterprise. In connection with, in this paper, various informations and system and control about data that can happen information inside and outside considering integrity for IT resource, solubility, confidentiality within organization studied about special quality to model synthetic Risk Management System that can of course and cope in danger.
Park, Ihn-Sook;Cho, In-Sook;Kim, Eun-Man;Kim, Min-Kyung
Journal of Korean Academy of Nursing Administration
/
v.17
no.4
/
pp.484-492
/
2011
Purpose: The aims of study were; (1) to evaluate the validity and sensitivity of a fall-risk assessment tool, and (2) to establish continuous quality improvement (CQI) methods to monitor the effective use of the risk assessment tool. Methods: A retrospective case-control cohort design was used. Analysis was conducted for 90 admissions as cases and 3,716 as controls during the 2006 and 2007 calendar years was conducted. Fallers were identified from the hospital’s Accident Reporting System, and non-fallers were selected by randomized selection. Accuracy estimates, sensitivity analysis and logistic regression were used. Results: At the lower cutoff score of one, sensitivity, specificity, and positive and negative predictive values were 82.2%, 19.3%, 0.03%, and 96.9%, respectively. The area under the ROC was 0.60 implying poor prediction. Logistic regression analysis showed that five out of nine constitutional items; age, history of falls, gait problems, and confusion were significantly associated with falls. Based on these results, we suggested a tailored falls CQI process with specific indexes. Conclusion: The fall-risk assessment tool was found to need considerable reviews for its validity and usage problems in practice. It is also necessary to develop protocols for use and identify strategies that reflect changes in patient conditions during hospital stay.
Korean Journal of Construction Engineering and Management
/
v.6
no.5
s.27
/
pp.119-127
/
2005
According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.
Journal of the Korean Data and Information Science Society
/
v.24
no.3
/
pp.557-569
/
2013
Risk management activity for successful defense R&D project should be done anticipatorily and consistently over the entire project period and there should be a priority for management depending on importance of the risk factors. In this study, we verified the reliability and validity through factor analysis for the risk factors selected by the Delphi technique. We also obtained the relative importance of risk factors with analytic hierarchy process (AHP) and decided to prioritize for comparison of domestic and overseas research. According to the study, we found that it is important to settle the requirements and to classify the scope of R&D. It is also considered significant to have reasonable schedule for completion and secure the necessary resources in the early stage of project. Unlike previous studies, it appeared the technical factors are critical elements as well for defense R&D project.
The government of South Korea has introduced various security measures in the supply chain, such as CSI (including a 24-hour rule) and AEO (Authorized Economic Operator), in compliance with global security trends and the war on terror. However, many participants in the import and export process are still unfamiliar with the purposes and functions of CSI, the 24-hour rule, and AEO. As such, considering these risks as obstacles or as factors that interfere with the import and export process, this study suggests proper management schemes, which can identify, measure and evaluate these risks.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.2
/
pp.252-258
/
2016
Risk identification based on the government quality assurance activity for military goods is being conducted to determine the risks to be reflected in a government quality assurance plan. On the other hand, current risk evaluation method focuses mainly on the functional requirements of the product specifications, which is a lack of reflection and identification of risks considering the process and the method is determined from a personal opinion, for example experience and know-how, which results in a lack of objectivity. Therefore, a standard of judgment according to quantitative data, which includes the present process control data using the FMEA method is required to improve the objectivity and dependability. This paper proposes useful suggestions for a government quality planning method to apply the results of FMEA to hand grenades.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.