• Title/Summary/Keyword: risk process

Search Result 2,892, Processing Time 0.03 seconds

Development Plan of Licence Holders Health Management System (항공종사자 건강관리 제도의 발전방안)

  • Han, Bok Soon;Kwon, Young Hwan;Kim, Soo Geun;Choi, Eun Hi;Jang, Joung Soon;Shin, Yun Young;Ha, Yoon
    • Korean journal of aerospace and environmental medicine
    • /
    • v.29 no.2
    • /
    • pp.67-71
    • /
    • 2019
  • The health of licence holders (flight crew members and air traffic controllers) is recognized as an important element of aviation safety. The medical emergency symptoms that occur during the flight duty period without prior notice can interfere with human performance capabilities and threaten aviation safety. To prevent this, ICAO has been required to conduct a periodic medical assessment process of licence holders including routine analysis of in-flight incapacitation events and medical findings during medical to identify areas of increased medical risk and continuous reevaluation of the medical assessment process to concentrate on identified areas of increased medical risk. The supply and demand of licence holders have become a major issue due to the increase in air traffic around the world, and the pilot retirement age has been extended to 65 years. But, there is no significant change in the aviation medical assessments process. The follow up of the result of medical examination discovered through aviation medical examination is a very important part, but it has not been properly implemented, and the sick leaves and medical inflight incapacitation reporting system should be improved. The management of health risk factors for licence holders must be implemented to prevent aircraft accidents or aviation safety problems caused by health problems. In this paper, we propose the development plan and concrete improvement plan of the health risk management system of licence holders in Korea in terms of aviation safety.

A Case Study of Risk Assessments and Safety Measures in a PCB Manufacturing Process (인쇄회로기판 제조 공정에서 위험성평가와 안전조치 적용 사례 연구)

  • Lee, Young Man;Lee, Inseok
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.4
    • /
    • pp.120-128
    • /
    • 2022
  • Printed circuit boards (PCBs) are a basic component in the electronics industry and are widely used in nearly all electronic products, such as mobile phones, tablet computers, and digital cameras, as well as in electric equipment. PCB manufacturing involves the use of many chemicals and chemical processes and therefore has more risks than other manufacturing sectors. This study aims to identify the causes of possible accidents during PCB manufacturing through risk assessment, develop and implement safety measures, and evaluate the effectiveness of these measures. Note that the safety measures developed to mitigate the risks of a certain process were also implemented for other similar processes. The risk assessments conducted over seven years, from 2015 to 2021, at a PCB manufacturing company identified 361 hazardous processes. Between 2016 and 2019, 41-56 hazardous processes were identified per year; such processes decreased to fewer than 20 per year after 2020. Application of the risk assessment results to the improvement of the hazardous processes with the similar characteristics seems to be effective in decreasing the risks. Equipment-related factors such as lack of appropriate maintenance, low work standards, and defective protection devices were responsible for 59.8% of all possible accidents. Because PCB manufacturing involves many chemicals, skin contact with hazardous substances, electric shock, fire, and explosion were the most common types of possible accidents (81.7%). In total, 505 safety measures were implemented, including 157 related to purchase and improvement of equipment and devices for safety (31.1%), 147 related to the installation/modification of fire prevention facilities (29.1%), and 69 related to the use of standard electrical appliances (13.7%). Risk assessment conducted after implementing the safety measures showed that these measures significantly decreased risk; 247 processes (68.4%) had a risk level of 3, corresponding to "very low," and 114 processes (31.6%) showed a risk level of 4, corresponding to "low." In particular, risk assessment of 104 processes with risk scores of 12 and 10 other processes with risk score of 16 showed that the risk decreased to 4 after implementing the safety measures. Thus, implementing these measures in similar manufacturing sectors that involve chemical processes can mitigate risk.

Establishment of Risk Database and Development of Risk Classification System for NATM Tunnel (NATM 터널 공정리스크 데이터베이스 구축 및 리스크 분류체계 개발)

  • Kim, Hyunbee;Karunarathne, Batagalle Vinuri;Kim, ByungSoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.1
    • /
    • pp.32-41
    • /
    • 2024
  • In the construction industry, not only safety accidents, but also various complex risks such as construction delays, cost increases, and environmental pollution occur, and management technologies are needed to solve them. Among them, process risk management, which directly affects the project, lacks related information compared to its importance. This study tried to develop a MATM tunnel process risk classification system to solve the difficulty of risk information retrieval due to the use of different classification systems for each project. Risk collection used existing literature review and experience mining techniques, and DB construction utilized the concept of natural language processing. For the structure of the classification system, the existing WBS structure was adopted in consideration of compatibility of data, and an RBS linked to the work species of the WBS was established. As a result of the research, a risk classification system was completed that easily identifies risks by work type and intuitively reveals risk characteristics and risk factors linked to risks. As a result of verifying the usability of the established classification system, it was found that the classification system was effective as risks and risk factors for each work type were easily identified by user input of keywords. Through this study, it is expected to contribute to preventing an increase in cost and construction period by identifying risks according to work types in advance when planning and designing NATM tunnels and establishing countermeasures suitable for those factors.

Probability Prediction of Stability of Ship by Risk Based Approach (위험도 기반 접근법에 의한 선박 복원성의 확률 예측)

  • Long, Zhan-Jun;Jeong, Jae-Hun;Moon, Byung-Young
    • The KSFM Journal of Fluid Machinery
    • /
    • v.16 no.2
    • /
    • pp.42-47
    • /
    • 2013
  • Ship stability prediction is very complex in reality. In this paper, risk based approach is applied to predict the probability of a certified ship, which is effected by the forces of sea especially the wave loading. Safety assessment and risk analysis process are also applied for the probabilistic prediction of ship stability. The survival probability of ships encountering with different waves at sea is calculated by the existed statistics data and risk based models. Finally, ship capsizing probability is calculated according to single degree of freedom(SDF) rolling differential equation and basin erosion theory of nonlinear dynamics. Calculation results show that the survival probabilities of ship excited by the forces of the seas, especially in the beam seas status, can be predicted by the risk based method.

The Effects of IT Project Risk Management Factors on Project Performance (IT 프로젝트 위험관리요인이 프로젝트 성과에 미치는 영향)

  • Jang, Sung-Bong;Kwahk, Kee-Young
    • Korean Management Science Review
    • /
    • v.28 no.2
    • /
    • pp.31-51
    • /
    • 2011
  • Many companies have considered IT outsourcing as one of strategic alternatives in order to rapidly respond to changing business environment and strengthen their competitiveness. Despite its strategic role, however, IT outsourcing project has been plagued by a high failure rate and difficulty in realizing the promised project performance because of its inappropriate risk management. This study examines the effect of IT project management risk factors on project performance. We propose that project risk management factors(communication, technology sharing, and project control) influence project performance(process performance and product performance). Based on the empirical results, theoretical and practical implications of the study are discussed along with its limitations.

An Effective Project risk Management Based on Systems Engineering (시스템엔지니어링에 기반한 효과적인 리스크 관리)

  • Kang, Top;Kim, Sung-Cheol;Oh, Jung-Taek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.1
    • /
    • pp.43-51
    • /
    • 2011
  • SE generally defines approaching ways of conducting identification, verification and integration of an optimized product and process solution to meet customer's needs by leveraging organizational competency in engineering and management. To successfully develop a new product under mass production contract, it is important to efficiently carry out the program by ensuring that three major competencies are secured; core technology, system integration, and program management. For successful implementation of tasks in the three areas, systematic execution is called for, which requires identifying risk factors in advance. In particular, comprehensive risk management role and responsibility is required for program management. Success of a development program is determined by complex elements of human resources, organization culture, and overall competency of an organization in technology and program management, including capability of the program manager. In this paper, a risk management solution is suggested to lead a program to success with a more efficient way through actual risk management by the concept of SE around the above three areas.

Pesticide Risk and Benefit Assessment

  • Birtley, Robin D.N.
    • Korean Journal of Weed Science
    • /
    • v.13 no.4
    • /
    • pp.195-202
    • /
    • 1993
  • The benefits of pesticides in improving the food quantity and quality requirements for an increasing world population are significant, and they can be described in agronomic, economic and social terms. The risks are assessed from the hazards which are likely to occur in practice ; the hazards are defined by the toxicity of the pesticide to non-target organisms at various exposure levels. There are ways of reducing the risks (mainly by reducing exposure in practice) and improving the benefits of pesticides ; these are known as risk management and benefit management respectively. The overall risk-benefit assessment is facilitated if each component can be expressed in financial terms, but it must be made nationally or locally on a sound technical basis against the prevailing agronomic, socio-economic and political circumstances. Paraquat is used to illustrate the risk-benefit assessment process in general terms, and the conclusion is that the benefits greatly outweigh the risks. It is important to keep the risks of pesticides in perspective with those associated with other naturally occurring chemicals in our diet and with other everyday aspects of life. In an overall context, the pesticide risk is small.

  • PDF

A Study on the Key Performance Factors of Passenger Airbag and Injury Risk Prediction Technique Development (동승석 에어백 핵심 성능 인자 및 상해위험도 예측 기법 개발에 대한 연구)

  • Park, Dongkyou
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.21 no.5
    • /
    • pp.130-135
    • /
    • 2013
  • Until now, passenger airbag design is based on the referred car design and many repetitive crash tests have been done to meet the crash performance. In this paper, it was suggested a new design process of passenger airbag. First, key performance factors were determined by analyzing the injury risk effectiveness of each performance factor. And it was made a relationship between injury risk and performance factor by using the response surface model. By using this one, it can be predicted the injury risk of head and neck. Predicted injury risk of optimal design was obtained through this injury risk prediction model and it was verified by FE analysis result within 18% error of head and 9% error of neck. It was shown that a target crash performance can be met by controlling the key performance factors only.

Optimal Asset Allocation with Minimum Performance and Inflation Risk (최소 자산제약 및 인플레이션을 고려한 자산 할당에 관한 연구)

  • Lim, Byung Hwa
    • Korean Management Science Review
    • /
    • v.30 no.1
    • /
    • pp.167-181
    • /
    • 2013
  • We investigate the dynamic asset allocation problem under inflation risk when the wealth of an investor is constrained with minimum requirements. To capture the investor's risk preference, the CRRA utility function is considered and he maximizes his expected utility at predetermined date of the refund by participation in the financial market. The financial market is supposed to consist of three kinds of financial instruments which are a risk free asset, a risky asset, and an index bond. The role of an index bond is managing inflation risk represented by price process. The optimal wealth and the optimal asset allocation are derived explicitly by using the method to get the European call option pricing formula. From the numerical results, it is confirmed that the investments on index bond is high when the investor's wealth level is low. However, as his wealth increases, the investments on index bond decreases and he invests on risky asset more. Furthermore, the minimum wealth constraint induces lower investment on risky asset but the effect of the constraints is reduced as the wealth level increases.

A Study on the Risk Measurement of Construction Method for Fie1d Work (건축공사를 위한 공법별 리스크 측정에 관한 연구)

  • Yoo In-Geun;Choi Sang-Chun;Cho Taek-Hee;Koo Bron-Woo;Yoon Yer-Wan
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1121-1129
    • /
    • 2005
  • The purpose of this study. was to Identification the Risk of construction method to protect and reduce the risk of construction period. The inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. We tested Risk occurring frequency and it's strength by checking the level of Risk. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, the Check List for finding Risk level of Method was created by using the check list of each Method.

  • PDF