Development on Filtering Priority Algorithm for Security Signature Search (보안 시그니처 탐지를 위한 필터링 우선순위 알고리즘 구현)

  • Jun, Eun-A;Kim, Jeom-goo
    • Convergence Security Journal
    • /
    • v.20 no.5
    • /
    • pp.41-52
    • /
    • 2020
  • This paper implements a priority algorithm for active response to security event risk, and implements an event scheduler that performs efficient event processing based on this. According to the standards that have global standards such as CVE and CVSS, standards for scoring when security events are executed are prepared and standardized so that priorities can be more objectively set. So, based on this, we build a security event database and use it to perform scheduling. In addition, by developing and applying the security event scheduling priority algorithm according to the situation of security events in Korea, it will contribute to securing the reliability of information protection and industrial development of domestic or ganizations and companies.

The research and correspondence of schedule risk management at the pre-construction phase of curtain-wall (커튼월 공사의 착공 전 단계에서 공정 리스크 규명 및 대응방안)

  • Jung Tae-Sik;Kim chang-duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.71-79
    • /
    • 2005
  • As construction projects have been extremely enormous, complex and special, risk factors have been increased consistently. Therefore, it is very important to identify and cope with the uncertain risk factors in such building constructions for successful project accomplishment. The purpose of this research is to approach practical affairs directly and show detail alternatives of risk factors by extracting the risk factors throughout construction process of curtain wall that is largely influenced on cost, quality, schedule ,safety and following activity. Also, extracting these risk factors make it possible to analyze quantitative risk and decide the priority raking of risk factors. Especially, this research is aimed to provide efficient management of scheduling risk that can make the risk minimize to practical workers who have different degree of knowledge and experience to the construction cite when the risk brings out suddenly.

An analysis study for reasonable installation of tunnel fire safety facility (터널 방재설비의 합리적 설치를 위한 분석적 연구)

  • Park, Jin-Ouk;Yoo, Yong-Ho;Park, Byoung-Jik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.243-248
    • /
    • 2015
  • Domestic road and railroad construction have been increasingly growing and for reasons of mitigating traffic congestion, urban plan and refurbishment project, deeper and longer tunnels have been built. The event of fire is the most fatal accident in a tunnel, and it can be very disastrous with a high possibility. In this study, QRA (Quantitative Risk Analysis) which is one of quantitative risk analysis approaches was applied to tunnel fire safety design and the evaluation of QRA cases and the cost comparison of QRA methods were carried out. In addition analysis of risk reduction effect of tunnel fire safety system was conducted using AHP (Analytic Hierarchy Process) and the priority of major factors that could mitigate the risk in tunnel fire was presented. As a result, significant cost reduction effect could be obtained by incorporating QRA and it is expected to design fire safety system rationally. The priority of fire safety system based on risk mitigation effect by fire safety system considering the cost is in order of water pipe, emergency lighting, evacuation passage and smoke control system.

An Evaluation of Accidents Risk for Cargo Handling Workers in Korean Ports Using the Grey Relational Analysis & Entropy Method (회색관계분석 및 엔트로피법을 이용한 항만하역근로자의 재해위험성 평가)

  • Jang, Woon-Jae
    • Journal of Navigation and Port Research
    • /
    • v.44 no.4
    • /
    • pp.291-297
    • /
    • 2020
  • In recent years, an increase in deaths and injuries of port cargo handling workers, has raised the need for more effective accident management. The purpose of this study was to evaluate the accident risk for port cargo handling workers and assess ports with high accident risk within the Korean alternative ports using the Entropy & GRA (Grey Relational Analysis). To achieve this purpose, first, 11 Korean ports were selected and the evaluative factors for their outranking evaluation by brainstorming were extracted. Second, the Grey Relational Coefficient of 11 alternative ports was calculated using the GRA. This paper, finally, determined the priority orders of accident risk through calculation of the Grey Relational Grade as the link Grey Relational Coefficient method and the weights of the evaluative factors were calculated by using the Entropy method. In the proposed model, eight criteria such as cargo worker, old cargo worker, work hours, facilities environment, steel cargo volumes, cargo volumes, injury numbers, and death numbers were collected. Busan port was identified as highest accident risk port, and so it should be a top priority to develop a plan to mitigate the risk.

Prioritizing for Failure Modes of Dynamic Positioning System Using Fuzzy-FMEA (Fuzzy-FMEA를 이용한 동적위치제어 시스템의 고장유형 우선순위 도출)

  • Baek, Gyeongdong;Kim, Sungshin;Cheon, Seongpyo;Suh, Heungwon;Lee, Daehyung
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.25 no.2
    • /
    • pp.174-179
    • /
    • 2015
  • Failure Mode and Effects Analysis (FMEA) has been used by Dynamic Positioning (DP) system for risk and reliability analysis. However, there are limitations associated with its implementation in offshore project. 1) since the failure data measured from the SCADA system is missing or unreliable, assessments of Severity, Occurrence, Detection are based on expert's knowledge; 2) it is not easy for experts to precisely evaluate the three risk factors. The risk factors are often expressed in a linguistic way. 3) the relative importance among three risk factors are rarely even considered. To solve these problems and improve the effectiveness of the traditional FMEA, we suggest a Fuzzy-FMEA method for risk and failure mode analysis in Dynamic Positioning System of offshore. The information gathered from DP FMEA report and DP FMEA Proving Trials is expressed using fuzzy linguistic terms. The proposed method is applied to an offshore Dynamic Positioning system, and the results are compared with traditional FMEA.

Underestimation of Dietary Exposure to Pesticide Residues in Relation to Residue Definition in South Korea (국내 잔류농약 residue definition과 관련된 식이노출의 과소평가)

  • Lee, Mi-Gyung
    • Journal of Food Hygiene and Safety
    • /
    • v.35 no.5
    • /
    • pp.452-458
    • /
    • 2020
  • In this study we aimed to find out pesticide types with probability for underestimation of dietary exposure to pesticide residues in Korea by comparing the residue definitions between Korea and Codex standards. In addition, we sought to establish priorities regarding the necessity of review concerning pesticide types and their impacts based on the risk assessment and dietary exposure underestimation. As a result, we found that according to the residue definition information, 44 pesticides have probability for underestimation in terms of dietary exposure assessments. Among them, 24 pesticides have priority for review of dietary exposure underestimation and its impacts on risk assessment, based on the ADI values of pesticides, Korean MRL information and toxicological information of metabolite. The 24 pesticides were as follows: acibensolar-S-methyl, chlorfenapyr, chlorothalonil, cyantraniliprole, cyclaniliprole, cyflumetofen, dithiocarbamates, fenamidone, fenpyroximate, fluazifop-P-butyl, fluopicolide, flupyradifuron, fluxapyroxad, glyphosate, hexythiazox, isoprothiolane, isopyrazam, myclobutanil, penthiopyrad, propiconazole, spinetoram, spiromesifen, spirotetramat, trifloxystrobin. Furthermore, chlorfenapyr, chlorothalonil, dithiocarbamates and fenamidone may have considered a top priority for review due to greater toxicity of metabolite. This study could be of great use for improvement on risk assessment approaches in South Korea regarding pesticide residues in food commodities.

Cost Based Vulnerability Control Method Using Static Analysis Tool (정적 분석 툴을 이용한 비용 기반의 취약점 처리 방안)

  • Lee, Ki Hyun;Kim, Seok Mo;Park, Young B.;Park, Je Ho
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.5 no.3
    • /
    • pp.139-144
    • /
    • 2016
  • When, Software is developed, Applying development methods considering security, it is generated the problem of additional cost. These additional costs are caused not consider security in many developing organization. Even though, proceeding the developments, considering security, lack of ways to get the cost of handling the vulnerability throughput within the given cost. In this paper, propose a method for calculating the vulnerability throughput for using a security vulnerability processed cost-effectively. In the proposed method focuses on the implementation phase of the software development phase, leveraging static analysis tools to find security vulnerabilities in CWE TOP25. The found vulnerabilities are define risk, transaction costs, risk costs and defines the processing priority. utilizing the information in the CWE, Calculating a consumed cost in a detected vulnerability processed through a defined priority, and controls the vulnerability throughput in the input cost. When applying the method, it is expected to handle the maximum risk of vulnerability in the input cost.

Deterioration Prediction Model of Water Pipes Using Fuzzy Techniques (퍼지기법을 이용한 상수관로의 노후도예측 모델 연구)

  • Choi, Taeho;Choi, Min-ah;Lee, Hyundong;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.30 no.2
    • /
    • pp.155-165
    • /
    • 2016
  • Pipe Deterioration Prediction (PDP) and Pipe Failure Risk Prediction (PFRP) models were developed in an attempt to predict the deterioration and failure risk in water mains using fuzzy technique and the markov process. These two models were used to determine the priority in repair and replacement, by predicting the deterioration degree, deterioration rate, failure possibility and remaining life in a study sample comprising 32 water mains. From an analysis approach based on conservative risk with a medium policy risk, the remaining life for 30 of the 32 water mains was less than 5 years for 2 mains (7%), 5-10 years for 8 (27%), 10-15 years for 7 (23%), 15-20 years for 5 (17%), 20-25 years for 5 (17%), and 25 years or more for 2 (7%).

A Modified Metric of FMEA for Risk Evaluation Based on ASIL of Safety System (ASIL에 기초하여 수정된 안전시스템 FMEA 위험평가척도)

  • Baek, Myoung-Sig;Jang, Hyeon Ae;Kwon, Hyuck Moo
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.4
    • /
    • pp.543-562
    • /
    • 2014
  • Purpose: The purpose of this study is to suggest a modified approach that compensates some shortcomings of RPN with relevant strength of ASIL for Safety System and suggests systematic and logical approach for FMEA. Methods: By comparing the objectives, determination procedures, and key conceptual differences of RPN and ASIL, a refined method of risk evaluation and a new risk metric are devised. Results: While the traditional FMEA provides only rough evaluation of relative risk for each failure, the proposed method compensates its shortcomings with relevant strength of ASIL and provides a more logical and practical procedure of risk evaluation. Conclusion: The new metric RPM provides not only a comparative priority rank but also the degree of physical seriousness. Besides, it may have even more benefits for various applications if the severity can be expressed as mone tary amount of losses.

Analysis of Schedule Risk using PROMETHEE (PROMETHEE 기법을 활용한 공정리스크 중요도 분석)

  • Lee, Jang-Young;Yoon, Yoo-Sang;Jang, Myung-Hoon;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.353-357
    • /
    • 2008
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management processes identification, analysis and response. Especially, the analysis process is important to objectively identify importance and priority among risk factors. The purpose of this study is to develop the effective analysis process by studying and supplement the problem of the AHP analysis method. The study provides a analysis process to use the PROMETHEE analysis method proposed.

  • PDF