• Title/Summary/Keyword: risk checklist development

Search Result 61, Processing Time 0.021 seconds

The Development of a Checklist for Quantitative Assessment of Risk Factors of Musculoskeletal Complaints in Shipbuilding Workers (조선소 근로자의 근골격계 자각증상에 대한 위험요인 평가척도 개발)

  • Kim, Won-Ho
    • Physical Therapy Korea
    • /
    • v.16 no.1
    • /
    • pp.42-51
    • /
    • 2009
  • The purpose of this study was to develop a checklist of risk factors for quantitative assessment of musculoskeletal complaints in shipbuilding workers. A key point was to develop comprehensive a checklist including the worker's physical ability, as ergonomic and workload factors. ln the first, through correlation analysis between musculoskeletal complaints and physical abilities in shipbuilding workers, risk factors related to physical abilities were selected. In the second, after the development of a checklist was composed of physical, ergonomic and workload factors, factor analysis was used to test the validity of the developed checklist. Each factors selected finally showed that physical factors were hand grip strength, spinal curvature, and flexibility (sit to reach), ergonomic factors were posture, total exposed time, duration, and force of working, and workload factors were physical and psychological workload perceived by worker. The results showed that musculoskeletal complaints was associated with physical abilities (p<.05). The developed checklist had a reliability of .761 (Cronbach=.761) and a validity and explanation of 54.9%. The criterion of management was classified in 4 stages by relative weights of each factor. It is suggested that active intervention is needed to reduce musculoskeletal complaints in workers with more than a 14.31 score.

  • PDF

Development of a Self-Administered Checklist for Evaluation of the Musculoskeletal Disorders Risk Factors in Construction Industry (건설업에서 발생하는 근골격계질환 위험요인의 작업자 자가 평가용 체크리스트 개발)

  • Lee, Yun-Keun;Park, Hee-Sok;Park, Jung-Keun
    • Journal of the Ergonomics Society of Korea
    • /
    • v.29 no.5
    • /
    • pp.811-818
    • /
    • 2010
  • In this study, a self-administered checklist for evaluation of the musculoskeletal disorders risk factors in construction industry was developed, and its reliability and validity were studied. 10 items of the checklist were determined based on the literature review, and total 2,793 construction workers participated in the analysis of the checklist's applicability. The results from the reliability analysis showed high Cohen's kappa coefficient (0.50~0.77), and high validity was also obtained in terms of relative risk (RR 1.73~9.14). Positive predictability was relatively low (13.0~32.5%), while negative predictability was high (80.1~96.8%). It can be concluded that the checklist would be suitable as a quick filtering tool of the ergonomic risk factors.

Development of Self Administered Questionnaire and Validity Evaluation for American National Standards Z-365 Checklist (미국표준연구원 체크리스트 Z-365의 자가보고형 설문개발 및 타당도 평가)

  • Park, Kyung Sik;Kang, Dongmug;Lee, Yong Hwan;Woo, Ji Hoon;Shin, Yong Chul
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.16 no.2
    • /
    • pp.172-182
    • /
    • 2006
  • Self administered checklist is needed to be developed to evaluate ergonomic risk factors. This study was conducted to develop self administered form of American National Standards Institute (ANSI) Z-365 checklist which represents comprehensive ergonomic risk factors, and to evaluate validity of this checklist. This study had been conducted from May 2004 to July 2005, of which subjects were 147 workers from 4 workplaces. Response rates for every items of self administered form of ANSI Z-365 were evaluated. To estimate the validity of checklist, relationship between the checklist grade that ANSI recommended and work-related musculoskeletal disorders (WMSDs) symptom were calculated with and without adjustment of related variables. To evaluate the utility of checklist, sensitivity, specificity, positive predictive value (PPV), and negative predictive value (NPV) were calculated. Because response rates of almost items were over 90 %, item development was successful. Because the checklist was related with WMSDs symptom after adjusting related variables, the checklist might represents ergonomic risk well. Because of low sensitivity and NPV, high specificity and PPV, the checklist is not suitable for screening tool. The checklist has better relationship with more severe symptom. Because of high specificity of the checklist, using it with high sensitive tool would enhance it's utility. Further study to develop high sensitive and comprehensive self administered ergonomic checklist is needed.

The Development of Inspection Checklist for Risk Recognition to Prevent Accidents at Worksites (작업현장 사고예방을 위한 위험인지 점검체크리스트 개발)

  • Lim, Hyung-Duk;Kawshalya, Mailan Arachchige Don Rajitha;Kim, Sang-Hoon;Oh, Young-Chan;Lee, Ho-Yong;Nam, Ki-Hoon
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.5
    • /
    • pp.811-816
    • /
    • 2022
  • Even though continuous management and supervision of reinforcement of policies to safeguard accidents at workplace and work sites were implemented. Accident prevention activities such as inspection and diagnosis are urgently required to induce a preliminary investigation to identify the risk factors for each type of work, before the work task to eliminate risks at the worksites. Since safety inspections at work sites were generally conducted through visual inspections, the results of safety inspections may vary depending on the findings and proficiency of the safety officers. The results of those inspections may have loopholes to prevent potential accidents at work. Therefore, the purpose of this study was to develop a risk identification checklist that can effectively perform safety inspections to prevent accidents at work sites. This study initially analyzed the previously developed accident checklist to identify current complications and issues in safety checklists. Based on the findings of major industrial accidents over the past three years, the relationship between accident, workplace, and work type were analyzed refereeing the safety inspection standards. A risk recognition-checklist was developed to provide basic data on identifying risk factors, and inspection guidance at work sites. To prepare for potential accidents by identifying and taking countermeasures to mitigate the high risk and serious accidents at sites by the guidelines of the checklist. The developed inspection checklist has been practically used by experts at work sites to perform safety inspections, and it has been verified its suitability, and feasibility, to prevent or mitigate workplace accidents, including securing the safety and health of field workers. The role of the developed safety checklist has been considered effective at worksites.

Development and Application of a Checklist for Analysis of Non-repetitive Work in Construction Industry (건설작업의 비정형적인 작업분석을 위한 체크리스트의 개발과 적용)

  • Park, Hee-Sok;Lee, Yun-Keun;Ok, Dong-Min
    • Journal of the Ergonomics Society of Korea
    • /
    • v.29 no.3
    • /
    • pp.321-329
    • /
    • 2010
  • Unlike production line works, construction work is non-repetitive in nature. In this study, a checklist was developed to characterize the ergonomic hazards of construction work. Eight existing checklists including OWAS, RULA, and REBA were integrated, and a new version was designed to include more postures of lower extremities. The analysis results obtained using the new checklist showed that manual materials handling (MMH) is the most common risk factor. About 62% of the MMH was done below the knee level or above the elbow level, and 22% was carried out with the trunk twisted more than $60^{\circ}$. The next risk factors were the works done with the knee bent or squatted, or with the shoulders abducted. It can be concluded that the new checklist is successful as a quick and easy tool for screening risk factors of construction works, although it is not capable of determining action levels. Further studies on validation of the checklist are expected.

A Development of Risk Identification Checklist for Stakeholder in Urban regeneration-Projects (도시재생사업 참여주체별 위험인지 체크리스트 개발)

  • Park, Kyu-Young;Kim, Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.487-490
    • /
    • 2008
  • The mixed-use development project like urban regeneration project has been enforced with long period and participation of various stakeholders. For this character, lots of risk could be occurred during the process of project and the project's success or failure depends on the risk management. So the process of identifying and responding to risks in urban regeneration projects should be followed systemically The risk identification phase is the first step to identify risk factors and define risk's character. One of the risk identification methods, the checklist, is the most practical and well-known one. This study suggests the check list that devide risks classified by stakeholders through analyzing tasks of stakeholders and drawing risks. This kind of checklist which handles risk factors classified by stakeholders is an easy tool to identify risks and expected to be effective to find risks for various stakeholders and themselves in the urban regeneration projects.

  • PDF

A Development of Risk Identification Checklist for Stakeholders in the Construction Phase of the Urban Regeneration-Projects (도시재생사업 건설단계의 참여주체별 위험인지 체크리스트 개발)

  • Park, Kyu-Young;Young, Moon-Serk;Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.67-75
    • /
    • 2009
  • The mixed-use development project like urban regeneration project has been enforced with long period and participation of various stakeholders. For this character, lots of risk could be occurred during the process of project and the project's success or failure depends on the risk management. So the process of identifying and responding to risks in urban regeneration projects should be followed systemically. The risk identification phase is the first step to identify risk factors and define risk's character. One of the risk identification methods, the checklist, is the most practical and well-known one. This study suggests the check list that devide risks classified by stakeholders through analizing tasks of stakeholders and drawing risks. This kind of checklist which handles risk factors classified by stakeholders is an easy tool to identify risks and expected to be effective to find risks for various stakeholders and themselves in the urban regeneration projects.

Development of Risk Evaluation Checklist for In-Situ Production of Precast Concrete Members (기성콘크리트 부재의 현장생산 리스크 평가를 위한 체크리스트 개발)

  • Lim, Jeeyoung;Jeong, Hee Woong;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.445-457
    • /
    • 2021
  • In previous studies, it was confirmed that through the in-situ production of precast concrete members, costs could be reduced by 14.5-39.4% compared to in-plant production. In particular, it was confirmed that the factory owner did not make a contract if it did not earn more than 20% of the production cost. If precast concrete members are produced in-situ under the same conditions, the quality equivalent to that of factory production can be secured. As it is advantageous in terms of cost and quality, precast concrete members must be produced in-situ. However, it is difficult to produce all quantities in-situ due to time and various other constraints. This is because in-situ production is avoided due to anticipated risks during the project management process. However, if the risk factors are analyzed before performing in-situ production of precast concrete members, it will increase the opportunity for in-situ production. Therefore, this study develops a checklist for evaluating the risk of in-situ production of precast concrete members. By applying the checklist to one case site, it was verified that risk factors can be evaluated easily and quickly. As a result, it was analyzed that sites with a high building coverage ratio are classified as high-risk sites because it is difficult to secure usable area for production and storage. The developed checklist efficiently evaluates the risk factors of in-site production, and makes it possible for the operator to determine the risk factors, which can change frequently during project execution, and respond according to the situation.

A Development of the Risk Identification Checklist through the Re-establishment of Risk Breakdown Structure of Construction Project (건설사업 위험분류체계의 재정립을 통한 위험인지 체크리스트 개발)

  • Chu Hae-Keum;Kim Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.109-117
    • /
    • 2003
  • The construction project is largely exposed to much more risk events over the project life cycle due to its complexity and size than the other industries. Therefore, the construction risk management process to identify and response the risk events is not only performing acutely but also proceeding systematically. The risk identification phase in the risk management process is to identify various risk events and define its characteristics. At this phase, the risk identification system is very useful tool to identify every possible risk events in the project. This study shows some problems of the existing risk identification system and proposes the modified risk identification system based on the project phases and the contract bodies, and also suggests partial but more enough detailed risk checklists to be implemented in the actual risk identification phase than any other existing risk breakdown systems to be examined at this study.