• 제목/요약/키워드: risk assessment method

검색결과 1,284건 처리시간 0.029초

조선업 위험성평가 실용을 위한 개선 방안 (Improvement for practical application of Risk Assessment in shipbuilding industry)

  • 신운철
    • 대한안전경영과학회지
    • /
    • 제16권3호
    • /
    • pp.273-277
    • /
    • 2014
  • Subcontracting business than the contracting business in shipbuilding industry is a lot of hazardous job and highly accident because of highly work intensity. In order to prevent the accidents, there is a need to analyze characteristic. of shipbuilding, to apply measures of risk assessment. In this paper, I suggested an improvement of the risk assessment through the actual condition research in shipbuilding industry. In the research method, I analysed accidents occurred until 2011-2013. Carried out the actual site survey while two weeks in May 2014. As a result, 1) The main pattern were caught-in or between, fall on the high level according to analyzed accidents. 2) To apply the weight show clear of magnitude for risk assessment. 3) Risk estimation of risk assessment is desirable to be quantization by accidents analysis, and to be greater than or equal to 4 steps.

A Proposal of Hazard/Risk Assessment Criteria and an Asbestos Management Method for Asbestos-containing Building Materials

  • Park, Wha-Me;Kim, Yoon-Shin
    • 한국환경보건학회지
    • /
    • 제38권1호
    • /
    • pp.66-72
    • /
    • 2012
  • Objectives: The AHERA method by the US EPA, ASTM E2356-04, and HSG264 by the UK HSE, all of which are hazard/risk assessment methods for asbestos-containing building materials, were reviewed and compared based on 231 homogeneous areas. In addition, the current Act on Asbestos Safety Management (enforcement: April 29, 2012) was reviewed and analyzed. This trial provided fundamental data for improving the current asbestos hazard/risk assessment method. Methods: For the hazard/risk assessment of 77 asbestos-containing public buildings including schools, 231 homogeneous areas were selected, each of which was assessed using AHERA, ASTM E2356-04, and HSG264. Results: The matching rate of the hazard/risk assessment stood at 20.4 percent between AHERA and ASTM, at 71.4 percent between AHERA and HSG264 and at 17.8 percent between ASTM and HSG264. The AHERA method includes a seven-category rating scale. There were three categories, two of which have three subcategories. ASTM provides two decision-making charts consisting of ten rating scales for current condition estimation and for potential for disturbance estimation. In addition, the HSG264 method has a total of 20 scores with four items, and then provides four grades. This HSG264 method cannot clearly separate current condition and potential for disturbance. Conclusions: In the Korean Act on Asbestos Safety Management, the hazard/risk assessment method for asbestos-containing building materials should consider balance between current condition estimation and the potential for disturbance estimation.

소각로 건설사업에 대한 건강영향평가 사례연구 - 중금속 흡입에 따른 인체 위해성 평가 - (A Case Study of Health Impact Assessment on Incinerator Construction Project - Human Risk Assessment due to Inhalation Exposure to Heavy Metals -)

  • 김영하;최상기;이영수
    • 환경영향평가
    • /
    • 제18권1호
    • /
    • pp.11-19
    • /
    • 2009
  • We conducted human risk assessment due to inhalation exposure to heavy metals emitted from incinerator. The process of health impact assessment(HIA) on incinerator is as follows: The first step is to presume and calculate the amount of heavy metals emitted using emission factor. The second step is to conduct an exposure assessment using the K-SCREEN model which is used for predicting the concentration in a conservative method. The last step is to carry out a risk assessment on carcinogenic and non-carcinogenic substances. This study revealed that rank of carcinogenic human risk was $Cr^{+6}$ > As > Ni > Cd, and values of human risk assessment on carcinogenic and non-carcinogenic substances is lower than the US criteria for risk assessment except $Cr^{+6}$. It is expected that the technique of HIA, especially human risk assessment on heavy metals, would be applied to the incinerator construction project. In addition, more systematic studies are needed to overcome some weak points and limits found in this study.

FMECA 기법을 적용한 건설현장 거푸집작업의 통합 안전위험성 평가 및 대응방안 마련 (Integrated Safety Risk Assessment and Response Preparation on Construction Site Formwork Using FMECA Method)

  • 안선주;송상훈
    • 대한안전경영과학회지
    • /
    • 제14권3호
    • /
    • pp.39-48
    • /
    • 2012
  • Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.

감전재해 분석을 통한 배전선로의 위험성 저감에 관한 연구 (A Study on the Risk Reduction of Distribution Line through Analysis of Electric Shock Accident)

  • 변정환;최상원
    • 한국안전학회지
    • /
    • 제33권2호
    • /
    • pp.14-20
    • /
    • 2018
  • In this study, we analyze the current status of major disasters in distribution works and propose safety measures through the distribution live-line work method and electric shock risk assessment. The result of analyzing the ratio of electric shocks to the occurrence of industrial accidents in the recent 13 years shows that the death rate is higher than other industries, especially the construction industry occupying most of the disaster, and it is higher than the collapse disaster. We analyze statistic data of 101 victims selected as core words of live work, distribution line, pole and 22.9 kV in the investigation report of major accident of electric shock fatal from 2001 to 2014. The safety measure was established through the risk assessment of the distribution method using the standard model of the risk assessment based on the results of electric shock analysis on the distribution line. In order to prevent the electric shock accident which is recently being discussed, the risk assessment procedure were carried out in the above-mentioned 22.9kV special high voltage live-line operation method. We derived the risk reduction plan for the distribution line from the results of the major accidents statistic and demonstration of the line works.

공동주택 건축공사 단위작업의 위험성 평가 방법 (Risk Assessment Method for Activities of Apartment Construction)

  • 박성표;최재욱;이찬식
    • 대한건축학회논문집:구조계
    • /
    • 제36권3호
    • /
    • pp.135-145
    • /
    • 2020
  • Recently, the disaster rate of the construction industry has increased with high-rise, and complexity of the building, unlike the decrease in the disaster rate in other industries. Although risk assessment is performed to reduce the occurrence of disasters, it is difficult to estimate the risks accurately due to activity in which no disaster has occurred, and inconsistencies in the level of details of work. In this study, in order to evaluate the risk of the major activity for the apartment construction work, the activity was identified by referring to the risk assessment model of construction industry type by the KOSHA. The construction work types and activities were consistently organized in level of work into nine work types and 82 activities were through experts consultation. Analyzing the disaster types that occurred during work through KOSHA disaster cases, calculating the probability of disaster occurrence according to the type of disaster, and combining the probability of disaster with the severity of disaster to estimate the risk assessment method was presented. Using the daily report of the construction site of the apartment, the results of a case study confirmed the validity of the risk calculation method presented in this study.

4M 위험성평가 기법을 이용한 앗차사고의 효과적인 발굴기법 (Effective Detection Technique of Near Miss using 4M Risk Assesment Methodology)

  • 서성화;원종일;우흥식
    • 한국안전학회지
    • /
    • 제27권5호
    • /
    • pp.164-170
    • /
    • 2012
  • In this study, a new technique for detecting near miss using 4M risk assessment method is suggested. Until now, the safety education with instances of near miss has just been progressed in most industrial settings, without any systematic guideline. By menas of appling 4M risk assessment method, the organized technique, which could effectively manage the fundamental prevention of industrial accident in advance, is developed. The organized technique of near miss-management suggested in this study will take an effective role in basically expanding the application of risk assessment method, as well as in contributing the activity of zero-accident as a safety guideline in hazardous workshops.

AMEA을 활용한 위험성평가 방법 (The method of risk assessment by AMEA)

  • 김건호;권상면;이강복;김윤성;이재원;강경식
    • 대한안전경영과학회지
    • /
    • 제9권2호
    • /
    • pp.97-111
    • /
    • 2007
  • In risk assessment, there are several methods such as Safety Review, Checklist, FMEA(Failure Mode and Effect Analysis), FTA(Fault Tree Analysis), ETA (Event Tree Analysis) etc, however, the level of accident is indentified by the probability of accident and severity resulting from accident which used widely in assessing accidents and disasters. In this paper, the risk assessment method to decide the level of risk will be introduced by using severity, frequency and detection according to accident theory.

Decision-making of alternative pylon shapes of a benchmark cable-stayed bridge using seismic risk assessment

  • Akhoondzade-Noghabi, Vahid;Bargi, Khosrow
    • Earthquakes and Structures
    • /
    • 제11권4호
    • /
    • pp.583-607
    • /
    • 2016
  • One of the main applications of seismic risk assessment is that an specific design could be selected for a bridge from different alternatives by considering damage losses alongside primary construction costs. Therefore, in this paper, the focus is on selecting the shape of pylon, which is a changeable component in the design of a cable-stayed bridge, as a double criterion decision-making problem. Different shapes of pylons include H, A, Y, and diamond shape, and the two criterion are construction costs and probable earthquake losses. In this research, decision-making is performed by using developed seismic risk assessment process as a powerful method. Considering the existing uncertainties in seismic risk assessment process, the combined incremental dynamic analysis (IDA) and uniform design (UD) based fragility assessment method is proposed, in which the UD method is utilized to provide the logical capacity models of the structure, and the IDA method is employed to give the probabilistic seismic demand model of structure. Using the aforementioned models and by defining damage states, the fragility curves of the bridge system are obtained for the different pylon shapes usage. Finally, by combining the fragility curves with damage losses and implementing the proposed cost-loss-benefit (CLB) method, the seismic risk assessment process is developed with financial-comparative approach. Thus, the optimal shape of the pylon can be determined using double criterion decision-making. The final results of decision-making study indicate that the optimal pylon shapes for the studied span of cable-stayed bridge are, respectively, H shape, diamond shape, Y shape, and A shape.

다양한 시험생물종을 이용한 산업폐수 생태독성 평가 및 원인물질 탐색 (Ecotoxicity Test of Wastewater by a Battery of Bioassay and Toxicity Identification Evaluation)

  • 류태권;조재구;김경태;양창용;정기은;윤준헌;최경희
    • Environmental Analysis Health and Toxicology
    • /
    • 제25권3호
    • /
    • pp.207-214
    • /
    • 2010
  • Toxicity identification and quantification are important factors to evaluate the effect of industrial effluent on the aquatic environment. In order to measure the potential and real toxicity of mixed chemicals in the effluents, the biological method (i.e., WET test) should be used as well as chemical analysis method. In this study, we conducted WET test for various kinds of industrial effluents using aquatic organisms such as water flea (Daphnia magna), algae (Pseudokirchneriella subcapitata), fish (Oryzias latipes, Danio rerio), and microorganism (Vibrio fisheri). In addition, we carried out chemical analysis and TIE (Toxicity Identification Evaluation) for effluents in order to identify the substances causing toxicity. Among the 30 kinds of wastewater, S13 showed the highest eco-toxicity and $Ca^{2+}$ and $Cl^-$ ion were suspected as major compounds causing toxicity for aquatic organisms. In order to confirm these suspected compounds, various confirmation procedures need to be carried out.