• Title/Summary/Keyword: ring-cut

Search Result 71, Processing Time 0.023 seconds

Analysis of Spare Capacity Ratio in Optical Internet using Cut-Set (광인터넷망에서 Cut-Set을 이용한 예비대역폭 비율 분석)

  • Kim, Taehyoun;Hwang, Hoyoung
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.12 no.5
    • /
    • pp.197-203
    • /
    • 2012
  • This paper studies network recovery method using logical multiple ring architecture embedded in WDM optical Internet environment. The multiple ring-based recovery method provides fast and simple network restoration operation, and performs local recovery that is detouring the failed link. The multiple ring architecture can provide higher resource efficiency by sharing the backup routes and reducing the number of spare wavelengths. This paper calculates the required spare capacity ratio using Cut-Sets in the given network topology and performs simulation for comparative analysis.

Effects of Species on the Isocyanate-bonded Flakeboard Properties

  • Kwon, Jin Heon
    • Journal of the Korean Wood Science and Technology
    • /
    • v.35 no.5
    • /
    • pp.38-45
    • /
    • 2007
  • Flakeboards made from ring- and drum-cut flakes of Douglas-fir, hemlock, red lauan and kapur using two kinds of resin levels were evaluated for the selected properties according to flake thickness. The pH and buffering capacity of four species were determined. Those of kapur were extremely different from the other three species. These pH and buffering capacity values result in the poor internal bond strength of kapur flakeboard. The internal bond strength was affected significantly by flake thickness, resin content and species. MOR and MOE in bending strength were maximized at medium drum-cut flake thickness. Screw holding strength was not consistent for flake thickness, but it was influenced by species. Thickness swelling and water absorption of Douglas-fir and hemlock flakeboard were minimized at medium drum-cut flake thickness.

Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone (NATM 터널의 대심도 풍화대층에서의 지반거동 및 보강방법)

  • Sung, Hwa-Don;An, Jung-Whan;Chun, Byung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1782-1788
    • /
    • 2007
  • This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analysis of failure rate and vertical stress ratio show that the tunnel for which the height of the cover(H) was higher than four times the diameter, it can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods were showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than where using Ring-cut split method. In addition the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.

  • PDF

Bipolar fuzzy ideals of Near Rings

  • Baik, Hyoung-Gu
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.22 no.3
    • /
    • pp.394-398
    • /
    • 2012
  • Based on the theory of a bipolar fuzzy set, the notion of a bipolar fuzzy subring/ideal of a Near ring is introduced and related properties are investigated. Characterizations of a bipolar fuzzy subnear ring and a bipolar fuzzy ideal in near ring are established. Relations between a bipolar fuzzy ideal and a level cut are discussed. Using bipolar fuzzy ideals, we discuss characterizations of Noetherian Near ring.

Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone (대심도 풍화대층에서 NATM 터널의 지반거동 및 보강방법)

  • Chun, Byung-Sik;Song, Seung-Hoon;An, Jung-Whan
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.8
    • /
    • pp.87-95
    • /
    • 2007
  • This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analyses of failure rate and vertical stress ratio show that the tunnel for which the height of the cover (H) was higher than four times the diameter, can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than that obtained by Ring-cut split method. In addition, the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.

A Study on the Quantitative Evaluation of the Load Distribution Factors Considering the Design Conditions of Tunnel Especially for the Ring-cut Excavation Method (터널 설계조건을 고려한 하중분배율의 정량적 산정에 관한 연구 -ring-cut 굴착공법을 중심으로-)

  • 장석부;문현구
    • Geotechnical Engineering
    • /
    • v.14 no.5
    • /
    • pp.5-16
    • /
    • 1998
  • 2-D numerical methods have been applied to analyze the stability of tunnels because of computation efficiency, though the ground around the tunnel under construction shows 3-D reformational behaviour due to the transverse and longitudinal arching effects. Load distribution factors are introduced to the 2-D analysis for the consideration of the effects of the tunnel advance in three dimensions. The load distribution factors influence significantly the ground deformation and the load of primary supports like shotcrete and rockbolts. According to the previous studies for 3-D numerical studies. it was shown that load distribution factors were heavily dependent on the ground deformational properties, tunnel size and the advance length of a tunnel. However, as the quantitative methods evaluating the factors have not been presented yet, constant values have been assigned to the factors for 2-D analysis even if the conditions for tunnel design are different. Accordingly, this paper presents the method to evaluate quantitatively the load distribution factors through the regression analysis of 3-D analysis data on 72 design cases. Also, new modification to the load distribution factors are suggested for the ring-cut excavation method because the conventional 2-D analysis is not able to consider the support effects of the core left on the tunnel face.

  • PDF

Structural Analysis of Snap Ring in Thrust Cut-Off System (Thrust Cut-Off 시스템에서의 스냅링 구조해석)

  • 김경희
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2000.11a
    • /
    • pp.21-21
    • /
    • 2000
  • Thrust Cut-Off 시스템은 로켓 발사체의 분리시의 충격에 의한 비행방향오차 및 비행거리를 감소하고 Pay-Load 부에 추진력을 증가시키고 분리된 추진 기관부의 낙하위치 예측을 용이하게 한다. 이와 같이 중요한 역할을 하게되는 Thrust Cut-Off 시스템에서 스냅링은 핵심적인 역할을 하게 된다. 정상적인 추진체의 작동 시에는 고압의 연소가스를 지탱하고 분리 시에는 쉽게 분리되어 연소가스를 역 분사 시켜야한다.(중략)

  • PDF

A Study on Deformation Behavior of Thrust Cut Off System under High Pressure (고압하 추력중단장치의 변형거동 연구)

  • Park Sung-Han;Chang Hong-Been;Lee Hwan-Gyu;Kang Moon-Jung;Kim Jae-Hoon
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.9 no.4
    • /
    • pp.89-95
    • /
    • 2005
  • Thrust cut off(TCO) system is installed at the port of a rocket motor case forward dome. The snap ring and the closure are escaped sequentially by pulling out a wedge under internal pressure. The hydraulic structural tests of TCO and numerical simulations were performed, and both results were compared to understand the deformation behavior of TCO. By increasing splines symmetrically, the sealing capacity of TCO can be improved significantly. The escape pressure of TCO increases according to the increase of friction coefficient and there is a critical friction coefficient beyond which the snap ring can not be nearly escaped even after forced escape of wedge. Under low friction coefficient the snap ring is contracted to radial direction and easily escaped. But, under high friction coefficient, the snap ring can not be escaped from the port even after severe plastic deformation.

Development of Automatic Wax-Ring Manufacturing System for Silk Coating (섬유코팅용 왁스링 성형을 위한 자동화 시스템 개발)

  • Cho, Young Hak;Maeng, Heeyoung
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.22 no.3_1spc
    • /
    • pp.531-536
    • /
    • 2013
  • An automatic wax-ring manufacturing system for silk coating was developed, which consisted of a container, pallet with a cooling part, injection port, and removing device. The removing device is a system to load, lift, and cut the wax-ring, which is widelyused for various silk-coating industrial purposes. A novel removing device equipped with a water cooling circulation system is proposed in this paper. It has the benefit of easy control, as well as the convenience of loading and unloading without the use of other equipment. Three-dimensional modeling techniques were adopted to develop integrated functions for the automatic wax-ring manufacturing system, which made it possible to confirm the smooth integration/interface of each part and the system's interrelations with other manufacturing systems.

Tree-Ring Dating of Wood Elements for Jeongjagak of Seonreung, Seoul, Korea (선릉 정자각 목부재의 연륜연대 분석)

  • Son, Byung-Hwa;Han, Sang-Hyo;Park, Won-Kyu
    • Journal of the Korea Furniture Society
    • /
    • v.23 no.2
    • /
    • pp.222-228
    • /
    • 2012
  • Seonreung is the tomb of Seong-jong (A.D. 1457~1494), the 9th king of Joseon Dynasty (1392-1910) and his second queen Jeonghyeon-wanghu (1462~1530). We obtained dendrochronological dates of Jeongjagak (ceremonial hall) of Seonreung. It was known first built in 1495 and reconstructed in October 1706, We obtained tree-ring dates of 20 wood elements (beams, pillars, truss posts, cant strips, roof boards and roof loaders). Their outermost rings were dated from 1630 to 1705. The dates of bark rings in four elements were A.D. 1705 with completed latewoods, indicating that these woods were cut some time between the autumn of 1705 and spring of 1706. The results confirmed the reconstruction date Jeongjagak of Seonreung in 1706, suggesting that there was not so long period for wood drying or storage, i.e., less than 6 months. The dates of outermost rings prior to 1705 in other elements indicated that some outer rings of these elements were removed during wood processing. Tree-ring dating proved that the present Jeongjagak of Seonreung had been well preserved for more than 300 years.

  • PDF