• Title/Summary/Keyword: right to housing

Search Result 121, Processing Time 0.017 seconds

Landscape Assessment and Improvement of the View Area by Selecting the Landscape Control Point (조망점 선정을 통한 대상지의 경관가치 평가 및 개선방안)

  • Kim, Jin-Hyo;Lee, Hyun-Taek;Ra, Jung-Hwa;Cho, Hyun-Ju;SaGong, Jung-Hee
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.5
    • /
    • pp.19-32
    • /
    • 2012
  • The purpose of this study is to quantitatively measure the view target and the view area through the selection of landscape control point by selecting Jimyeong-dong Dong-gu and Yeongyeong-dong Buk-gu Daegu, which are planned as the large scale housing complex development area, as the target places. It is very meaningful that from the simulation based on this measurement, the improvement methods are attempted to be suggested at the project level. The results of this study are as follows. First, the total number of viewing targets derived from the literature analysis for the selection of the viewing targets was 24, and finally derived main viewing targets were 4 places. Second, the total number of selection criteria of the derived landscape control point was 15, and these were re-categorized as prospect, accessibility and publicness according to the common property. The preliminary LCPs were selected by measuring the publicness and accessibility, and because of the said measurement, a total of 43 preliminary LCPs were selected. The final LCPs were selected by estimating the prospect of the selected preliminary LCPs, and as a result of estimation, a total of 29 final LCPs were selected. Finally, the total number of evaluation indicators derived from literature analysis was 26. Because of the valuation by the landscape control point, it was found that the 2 view areas were the I grade, 3 areas were II grade and 3 areas were the V grade, the lowest grade among 29 view areas. From the analysis on problems for the improvement methods, 4 improvement-indicators including the diversity of land mosaic were selected for the view area-1 without considering the development project drawing. In addition, for the view area-2 with considering the development project drawing, the landscape as the scenery forests was well formed, and the arrangement of architectures for the security of view corridor was right angle arrangement, and their floor number was 10.