The efficient operation and management strategies of reservoirs in irrigation periods of drought events are an essential element for drought planning and countermeasure. Korea Rural Community Corporation has developed the real-time water level observation system of agricultural reservoirs to efficiently operate reservoirs, however, it is not possible to predict drought conditions, and only provides information of current situation. Hence, it is necessary to evaluate accurate irrigation vulnerability and efficiently reservoir operation rules using current water level. In this paper, the improvement methods of reservoir operation planning were developed with water supply vulnerability characteristic curves comparing to automatic water gauge at agricultural reservoirs. The 11 reservoirs were simulated applying the reservoir operation rules which was determined by irrigation vulnerability characteristic curves criteria and real time water level, and evaluated water supply situation in 2012 year. The analysis of results can be identified probabilistic possibility of water supply failures compared with the existing reservoir operation criteria. These results of efficient reservoir operation rules can be achieved enable irrigation planners to optimally manage available water resources for decision making, and contributed to maintain the water supply according to demand strategy for agricultural reservoirs management.
To provide variation of water supply for instream flow from reservoirs with various magnifications of paddy irrigation area to watershed area, 8 reservoirs were selected to draw operation rule curve and to analyze water supplies from reservoirs. Reliability of 90% for supplying irrigation water from reservoir was able to maintain and instream flow water was able to be supplied only in the reservoir with magnification of paddy irrigation area to watershed area above 3. The more magnification of paddy irrigation area to watershed area increased, the more ratio of irrigation water to total water storage decreased, and the more ratio of instream flow water to total water storage increased. From the heightening 113 reservoirs in Korea, annual irrigation water was estimated to 1,146.05 $Mm^3$ in normal operation, 839.57 $Mm^3$ in withdrawal limited operation, and annual instream flow water was estimated to 149.68 $Mm^3$ in normal operation, 283.19 $Mm^3$ in withdrawal limited operation. It was concluded that withdrawal limited operation was followed to have the premise of saving irrigation water, more instream flow water was able to be supplied from reservoirs with high magnification of paddy irrigation area to watershed area.
A model using a linear programming technique was developed to operate gates for the optimum management of small of medium size agricultural reservoirs. To predict the inflow into the reservoirs the WASHMO model, which was a single event hydrology model, was modified and used. To test the applicability, the developed model was applied to two reservoirs located in Kyungpook province. The results showed that the model could be used for the optimum gate operation of the agricultural reservoirs.
This study was conducted to investigate the appropriate operation method minimizing the deviation between irrigation water demand and release from the reservoirs, and the simulation technique was used in the operation model. This model was applied to the grouped reservoirs system consisted of Dongsang, Daia and Keungchun reservoirs and Eowoo-weir in Chonbuk FLIA district. The results obtained in this study are summarized as follows; 1.The area above the Eowoo weir point was divided into 6 small watersheds, and daily inflows from each watershed were calculated by Tank model. It showed that the average annual runoff ratio was 40-60% respectively. 2.Based on the Blaney-Criddle formula daily water requirement of Chonbuk FLIA irrigation area was estimated, mean water requirement for paddy field during the irrigation period was 818.lmm. 3.Using the basic data such as inflow and water demand, four different release types were selected. Through the simulated operation the difference between intake water required at Eowoo-weir point and release from the 3 reservoirs was estimated. The best result was obtained when Daia and Keungchun reservoirs are operated parallelly at fixed release ratio and the release of Dongsang reservoir was determined according to the storage of Daia reservoir.
This study refers to the development of a hydrologic model simulating daily inflow and release rates for irrigation reservoirs. A daily - based model is needed for adequate operation of an irrigation reservoir sufficing the water demand for paddy fields which is closely related to meteorological conditions. And the objective or this study is to develop a Daily Irrigation Reservoir Operation Model(DIROM) combining the inflow and the release models which depicts the daily water level fluctuations of an irrigation reservoir, and to evaluate the applicability of the model. DIROM was applied to four reservoirs and daily water levels were simulated and compared to the observed data. The model behaviour was also compared with that of a ten - day based model, Reservoir Operation Study(ROS) which has been applied for determining the design capacity of reservoirs. Various combinations of measured and simulated inflow and release rates for tested reservoirs were used to define the daily water level fluctuations. Simulated release rates and measured inflow data resulted in larger errors, and simulated inflow and release rates produced the smallest errors in water level comparison. Two resevoir operation models, DIROM and ROS were applied to the same reservoir and the simulation results compared. The computational errors of DIROM ware smaller than those of ROS, and DIROM was more sensitive to meteorological conditions. DIROM demonstrated its potenial applicability in water management and operation.
The Asan Bay area Korea is situated in an unbalance or water supply and demand relating to the Ansung, Sapkyo, Dangjin and Youmwha rivers and their estuary reservoirs. The multi-reservoir operation was studied by the Hierarchical Operation Model for Multi-reservoir System(HOMMS) assuming that these four estuary reservoirs were linked to each other in order. The result of this study shows that storage capacity deficiency in 2011 was estimated as 8 MCM in the Sapkyo and 31 MCMin Dae Ho estuary reservoir, respectively. In case of linking four reservoirs, the water deficiency will not occurs in all the reservoirs even if additional agricultural water of 78 MCM/yr was supplied. Total additional water demand for agricultural, municipal and industrial uses was estimated as 321.9 MCM/yr while additional supply by linking the reservoirs was estimated as 160.4 MCM/yr. 50% of additional demand. The remaining 161.5MCM/yr would be supplied transferring other watershed.
This study was conducted to investigate the effect of hydropower factors (watershed, gross head), operation ratio and unit electricity cost on the benefit-cost ratio (B/C ratio) of small hydropower using agricultural reservoirs. The equation of B/C ratio was expressed as a function of watershed area, gross head, operation ratio and unit electricity cost. The benefit increased with watershed area, gross head and unit electricity cost, while the cost increased with watershed area and gross head but decreased with operation ratio. The B/C ratio increased with watershed area, gross head, operation ratio and unit electricity cost. While the effect of gross head on the B/C ratio decreased with watershed area, the effect of operation ratio and unit electricity cost on the B/C ratio increased with watershed area. The operation ratio is an important factor to affect the B/C ratio and therefore we need to develop hydropower for the heightened dams to expect high operation ratio due to continuous water release. The unit electricity cost is also an important factor to affect the B/C ratio and the B/C ratio was always below 1 unless unit electricity cost is over 60 Won/kWh under given conditions. The reservoirs with economic feasibility for small hydropower development were three in 21 when the equation of B/C ratio was appled to the study reservoirs. The results can be used to choose the appropriate reservoir with economic feasibility for development of small hydropower.
Currently, the operation rule of agricultural reservoirs in case of drought events follows the drought forecast warning standard of agricultural water supply. However, it is difficult to preemptively manage drought in individual reservoirs because drought forecasting standards are set according to average reservoir storage ratio such as 70%, 60%, 50%, and 40%. The equal standards based on average water level across the country could not reflect the actual drought situation in the region. In this study, we proposed the improvement of drought operation rule for agricultural reservoirs based on the percentile approach using past water level of each reservoir. The percentile approach is applied to monitor drought conditions and determine drought criteria in the U.S. Drought Monitoring (USDM). We applied the drought operation rule to reservoir storage rate in extreme 2017 spring drought year, the one of the most climatologically driest spring seasons over the 1961-2021 period of record. We counted frequency of each drought criteria which are existing and developed operation rules to compare drought operation rule determining the actual drought conditions during 2016-2017. As a result of comparing the current standard and the percentile standard with SPI6, the percentile standard showed severe-level when SPI6 showed severe drought condition, but the current standard fell short of the results. Results can be used to improve the drought operation criteria of drought events that better reflects the actual drought conditions in agricultural reservoirs.
하천을 구성하는 수공시스템의 구성요소 중에서 댐과 같이 하천유량 조절에 중요한 역할을 하는 시설이 신규건설을 통해 시스템에 추가되면, 기존 시스템의 운영방식은 이를 고려하여 변화되어야 된다. 기존댐에서 사용되던 운영률은 기왕의 시스템의 입력과 출력에 적합하도록 설계되었으므로, 신규댐이 하천에 추가되면 운영률 또한 이를 고려하여 변화되어야 한다. 본 연구에서는 하천에 신규댐 건설로 인하여 기존댐 운영률의 변화가 필요할 때, 기존댐과 신규댐의 운영목적을 동시에 고려하여 새로운 운영률을 작성하기 위한 기법을 제시하였다. 이를 위하여 추계학적 기법을 통해 발생된 유입량과 최적기법을 사용한 댐 연계운영을 실시하여 저수지 운영률을 개발하였다 본 연구에서 제안된 기법의 검증을 위해 금강유역을 선정해 적용한 결과 새로운 운영률의 적합성을 확인하였다.
In this study we developed a turbidity management system to support the operation for effective turbid water management. The decision-making system includes various models for prediction of turbid water inflow, effective reservoir operation using the selective withdrawal facility, analysis of turbid water discharge in the downstream. The system is supported by the intensive monitoring devices installed in the upstream rivers, reservoirs, and downstream rivers. SWAT and HSPF models were constructed to predict turbid water flows in the Imha and Andong catchments. CE-QUAL-W2 models were constructed for turbid water behavior prediction, and various analyses were conducted to examine the effects of the selective withdrawal operation for efficient high turbid water discharge, turbid water distribution under differing amount and locations of turbid water discharge. A 1-dimensional dynamic water quality model was built using Ko-Riv1 for simulation of turbidity propagation in the downstream of the reservoirs, and 2-dimensional models were developed to investigate the mixing phenomena of two waters discharged from the Andong and Imha reservoirs with different temperature and turbidity conditions during joint dam operation for reducing the impacts of turbid water.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.