• Title/Summary/Keyword: reservoirs operation

Search Result 205, Processing Time 0.024 seconds

Development of Operation Rules in Agricultural Reservoirs using Real-Time Water Level and Irrigation Vulnerability Index (실시간 저수위 및 용수공급 취약성 지표를 활용한 농업용 저수지 운영 기준 개발)

  • Nam, Won Ho;Choi, Jin Yong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.6
    • /
    • pp.77-85
    • /
    • 2013
  • The efficient operation and management strategies of reservoirs in irrigation periods of drought events are an essential element for drought planning and countermeasure. Korea Rural Community Corporation has developed the real-time water level observation system of agricultural reservoirs to efficiently operate reservoirs, however, it is not possible to predict drought conditions, and only provides information of current situation. Hence, it is necessary to evaluate accurate irrigation vulnerability and efficiently reservoir operation rules using current water level. In this paper, the improvement methods of reservoir operation planning were developed with water supply vulnerability characteristic curves comparing to automatic water gauge at agricultural reservoirs. The 11 reservoirs were simulated applying the reservoir operation rules which was determined by irrigation vulnerability characteristic curves criteria and real time water level, and evaluated water supply situation in 2012 year. The analysis of results can be identified probabilistic possibility of water supply failures compared with the existing reservoir operation criteria. These results of efficient reservoir operation rules can be achieved enable irrigation planners to optimally manage available water resources for decision making, and contributed to maintain the water supply according to demand strategy for agricultural reservoirs management.

Variation of water supply for instream flow from reservoirs with various magnifications of paddy irrigation area to watershed area (유역배율에 따른 저수지의 하천유지용수 공급량)

  • Noh, Jae-Kyoung;Lee, Jae-Nam
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.2
    • /
    • pp.331-341
    • /
    • 2011
  • To provide variation of water supply for instream flow from reservoirs with various magnifications of paddy irrigation area to watershed area, 8 reservoirs were selected to draw operation rule curve and to analyze water supplies from reservoirs. Reliability of 90% for supplying irrigation water from reservoir was able to maintain and instream flow water was able to be supplied only in the reservoir with magnification of paddy irrigation area to watershed area above 3. The more magnification of paddy irrigation area to watershed area increased, the more ratio of irrigation water to total water storage decreased, and the more ratio of instream flow water to total water storage increased. From the heightening 113 reservoirs in Korea, annual irrigation water was estimated to 1,146.05 $Mm^3$ in normal operation, 839.57 $Mm^3$ in withdrawal limited operation, and annual instream flow water was estimated to 149.68 $Mm^3$ in normal operation, 283.19 $Mm^3$ in withdrawal limited operation. It was concluded that withdrawal limited operation was followed to have the premise of saving irrigation water, more instream flow water was able to be supplied from reservoirs with high magnification of paddy irrigation area to watershed area.

Development of a gate Operation Model for Agricultural reservoirs (農業用 貯水池 水門 操作 模型 開發)

  • Chung, Sang-Ok
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.34 no.2
    • /
    • pp.40-48
    • /
    • 1992
  • A model using a linear programming technique was developed to operate gates for the optimum management of small of medium size agricultural reservoirs. To predict the inflow into the reservoirs the WASHMO model, which was a single event hydrology model, was modified and used. To test the applicability, the developed model was applied to two reservoirs located in Kyungpook province. The results showed that the model could be used for the optimum gate operation of the agricultural reservoirs.

  • PDF

Optimal Operation of the Grouped Agricultural-Reservoirs (농업용 저수지군의 최적 운영)

  • 이기춘;최진규;이장춘;손재권
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.33 no.4
    • /
    • pp.52-60
    • /
    • 1991
  • This study was conducted to investigate the appropriate operation method minimizing the deviation between irrigation water demand and release from the reservoirs, and the simulation technique was used in the operation model. This model was applied to the grouped reservoirs system consisted of Dongsang, Daia and Keungchun reservoirs and Eowoo-weir in Chonbuk FLIA district. The results obtained in this study are summarized as follows; 1.The area above the Eowoo weir point was divided into 6 small watersheds, and daily inflows from each watershed were calculated by Tank model. It showed that the average annual runoff ratio was 40-60% respectively. 2.Based on the Blaney-Criddle formula daily water requirement of Chonbuk FLIA irrigation area was estimated, mean water requirement for paddy field during the irrigation period was 818.lmm. 3.Using the basic data such as inflow and water demand, four different release types were selected. Through the simulated operation the difference between intake water required at Eowoo-weir point and release from the 3 reservoirs was estimated. The best result was obtained when Daia and Keungchun reservoirs are operated parallelly at fixed release ratio and the release of Dongsang reservoir was determined according to the storage of Daia reservoir.

  • PDF

Siniulating Daily Inflow and Release Rates for Irrigation Reservoirs(III) - Model Application to Dafly Reservoir Operations - (관개용 저수지의 일별 유입량과 방류량의 모의 발생 (III) -저수지 모의조작 모형의 응용-)

  • 김현영;박승우
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.30 no.3
    • /
    • pp.95-105
    • /
    • 1988
  • This study refers to the development of a hydrologic model simulating daily inflow and release rates for irrigation reservoirs. A daily - based model is needed for adequate operation of an irrigation reservoir sufficing the water demand for paddy fields which is closely related to meteorological conditions. And the objective or this study is to develop a Daily Irrigation Reservoir Operation Model(DIROM) combining the inflow and the release models which depicts the daily water level fluctuations of an irrigation reservoir, and to evaluate the applicability of the model. DIROM was applied to four reservoirs and daily water levels were simulated and compared to the observed data. The model behaviour was also compared with that of a ten - day based model, Reservoir Operation Study(ROS) which has been applied for determining the design capacity of reservoirs. Various combinations of measured and simulated inflow and release rates for tested reservoirs were used to define the daily water level fluctuations. Simulated release rates and measured inflow data resulted in larger errors, and simulated inflow and release rates produced the smallest errors in water level comparison. Two resevoir operation models, DIROM and ROS were applied to the same reservoir and the simulation results compared. The computational errors of DIROM ware smaller than those of ROS, and DIROM was more sensitive to meteorological conditions. DIROM demonstrated its potenial applicability in water management and operation.

  • PDF

Efficient Utilization of Water Resources Linking The Estuary Reservoirs in Asan-Dae Ho Area of Korea (아산호(牙山湖)에서 대호호(大湖湖) 연안(沿岸)의 담수호(淡水湖) 연결(連結)에 의한 효율적(效率的)인 수자원(水資源) 이용방안(利用方案))

  • Choi, Han-Kyu;Koo, Bon-Soo;Lee, Seong-Hong
    • Journal of Industrial Technology
    • /
    • v.18
    • /
    • pp.425-430
    • /
    • 1998
  • The Asan Bay area Korea is situated in an unbalance or water supply and demand relating to the Ansung, Sapkyo, Dangjin and Youmwha rivers and their estuary reservoirs. The multi-reservoir operation was studied by the Hierarchical Operation Model for Multi-reservoir System(HOMMS) assuming that these four estuary reservoirs were linked to each other in order. The result of this study shows that storage capacity deficiency in 2011 was estimated as 8 MCM in the Sapkyo and 31 MCMin Dae Ho estuary reservoir, respectively. In case of linking four reservoirs, the water deficiency will not occurs in all the reservoirs even if additional agricultural water of 78 MCM/yr was supplied. Total additional water demand for agricultural, municipal and industrial uses was estimated as 321.9 MCM/yr while additional supply by linking the reservoirs was estimated as 160.4 MCM/yr. 50% of additional demand. The remaining 161.5MCM/yr would be supplied transferring other watershed.

  • PDF

Economic Feasibility Analysis for Development of Small Hydropower Using Agricultural Reservoirs (농업용 저수지의 소수력 개발을 위한 경제성 분석)

  • Woo, Jae-Yeoul;Kim, Jin-Soo;Jang, Hoon;Kim, Young-Hyeon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.2
    • /
    • pp.53-60
    • /
    • 2011
  • This study was conducted to investigate the effect of hydropower factors (watershed, gross head), operation ratio and unit electricity cost on the benefit-cost ratio (B/C ratio) of small hydropower using agricultural reservoirs. The equation of B/C ratio was expressed as a function of watershed area, gross head, operation ratio and unit electricity cost. The benefit increased with watershed area, gross head and unit electricity cost, while the cost increased with watershed area and gross head but decreased with operation ratio. The B/C ratio increased with watershed area, gross head, operation ratio and unit electricity cost. While the effect of gross head on the B/C ratio decreased with watershed area, the effect of operation ratio and unit electricity cost on the B/C ratio increased with watershed area. The operation ratio is an important factor to affect the B/C ratio and therefore we need to develop hydropower for the heightened dams to expect high operation ratio due to continuous water release. The unit electricity cost is also an important factor to affect the B/C ratio and the B/C ratio was always below 1 unless unit electricity cost is over 60 Won/kWh under given conditions. The reservoirs with economic feasibility for small hydropower development were three in 21 when the equation of B/C ratio was appled to the study reservoirs. The results can be used to choose the appropriate reservoir with economic feasibility for development of small hydropower.

Improvement of Drought Operation Criteria in Agricultural Reservoirs (농업용 저수지 이수관리를 위한 저수율 가뭄단계기준 개선)

  • Mun, Young-Sik;Nam, Won-Ho;Woo, Seung-Beom;Lee, Hee-Jin;Yang, Mi-Hye;Lee, Jong-Seo;Ha, Tae-Hyun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.64 no.4
    • /
    • pp.11-20
    • /
    • 2022
  • Currently, the operation rule of agricultural reservoirs in case of drought events follows the drought forecast warning standard of agricultural water supply. However, it is difficult to preemptively manage drought in individual reservoirs because drought forecasting standards are set according to average reservoir storage ratio such as 70%, 60%, 50%, and 40%. The equal standards based on average water level across the country could not reflect the actual drought situation in the region. In this study, we proposed the improvement of drought operation rule for agricultural reservoirs based on the percentile approach using past water level of each reservoir. The percentile approach is applied to monitor drought conditions and determine drought criteria in the U.S. Drought Monitoring (USDM). We applied the drought operation rule to reservoir storage rate in extreme 2017 spring drought year, the one of the most climatologically driest spring seasons over the 1961-2021 period of record. We counted frequency of each drought criteria which are existing and developed operation rules to compare drought operation rule determining the actual drought conditions during 2016-2017. As a result of comparing the current standard and the percentile standard with SPI6, the percentile standard showed severe-level when SPI6 showed severe drought condition, but the current standard fell short of the results. Results can be used to improve the drought operation criteria of drought events that better reflects the actual drought conditions in agricultural reservoirs.

Development of Optimal Operation Rule for Multipurpose Reservoirs System (다목적댐의 연계운영을 위한 최적 운영률 개발)

  • Yi, Jae-Eung
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.6
    • /
    • pp.487-497
    • /
    • 2004
  • Adding important new projects such as reservoirs which regulate a river discharge to a river system, existing operation methods should be changed considering these conditions. Since an original operation rule used for an existing system has been designed to be compatible to inputs and outputs of the existing system, the operation rule should be changed to consider the new projects. In this study, the technique of constructing new operation rules considering objectives of both old and new projects is suggested when new project is added to the river system. Reservoir operation rule using both stochastic inflow and optimization technique is developed. As a result of applying the technique to Geum river basin, the efficiency of the technique is verified.

Development of a Decision Support System for Turbid Water Management through Joint Dam Operation

  • Kim, Jeong-Kon;Ko, Ick-Hwan;Yoo, Yang-Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.31-39
    • /
    • 2007
  • In this study we developed a turbidity management system to support the operation for effective turbid water management. The decision-making system includes various models for prediction of turbid water inflow, effective reservoir operation using the selective withdrawal facility, analysis of turbid water discharge in the downstream. The system is supported by the intensive monitoring devices installed in the upstream rivers, reservoirs, and downstream rivers. SWAT and HSPF models were constructed to predict turbid water flows in the Imha and Andong catchments. CE-QUAL-W2 models were constructed for turbid water behavior prediction, and various analyses were conducted to examine the effects of the selective withdrawal operation for efficient high turbid water discharge, turbid water distribution under differing amount and locations of turbid water discharge. A 1-dimensional dynamic water quality model was built using Ko-Riv1 for simulation of turbidity propagation in the downstream of the reservoirs, and 2-dimensional models were developed to investigate the mixing phenomena of two waters discharged from the Andong and Imha reservoirs with different temperature and turbidity conditions during joint dam operation for reducing the impacts of turbid water.

  • PDF