• Title/Summary/Keyword: renewal reward processes

Search Result 6, Processing Time 0.018 seconds

A Note on Renewal Reward Process with Fuzzy Rewards

  • Hong, Dug-Hun;Kim, Jeong-Jin;Do, Hae-Young
    • Journal of the Korean Data and Information Science Society
    • /
    • v.16 no.1
    • /
    • pp.165-172
    • /
    • 2005
  • In recently, Popova and Wu(1999) proved a theorem which presents the long-run average fuzzy reward per unit time. In this note, we improve this result. Indeed we will show uniform convergence of a renewal reward processes with respect to the level ${\alpha}$ modeled as a fuzzy random variables.

  • PDF

RENEWAL AND RENEWAL REWARD THEORIES FOR T-INDEPENDENT FUZZY RANDOM VARIABLES

  • KIM, JAE DUCK;HONG, DUG HUN
    • Journal of applied mathematics & informatics
    • /
    • v.33 no.5_6
    • /
    • pp.607-625
    • /
    • 2015
  • Recently, Wang et al. [Computers and Mathematics with Ap-plications 57 (2009) 1232-1248.] and Wang and Watada [Information Sci-ences 179 (2009) 4057-4069.] studied the renewal process and renewal reward process with fuzzy random inter-arrival times and rewards under the T-independence associated with any continuous Archimedean t-norm. But, their main results do not cover the classical theory of the random elementary renewal theorem and random renewal reward theorem when fuzzy random variables degenerate to random variables, and some given assumptions relate to the membership function of the fuzzy variable and the Archimedean t-norm of the results are restrictive. This paper improves the results of Wang and Watada and Wang et al. from a mathematical per-spective. We release some assumptions of the results of Wang and Watada and Wang et al. and completely generalize the classical stochastic renewal theorem and renewal rewards theorem.

Renewal Reward Processes with Fuzzy Rewards and Fuzzy Inter-arrival Times

  • Hong, Dug-Hun;Do, Hae-Young;Park, Jin-Myeong
    • Journal of the Korean Data and Information Science Society
    • /
    • v.17 no.1
    • /
    • pp.195-204
    • /
    • 2006
  • In this paper, we consider a renewal process in which both the inter-arrival times and rewards are fuzzy random variables. We prove the uniform levelwise convergence of fuzzy renewal and fuzzy renewal rewards. These results improve the result of Popova and Wu[European J. Oper. Research 117(1999), 606-617] and the main result of Hwang [Fuzzy Sets and Systems 116 (2000), 237-244].

  • PDF

Condition-Based Model for Preventive Maintenance of Armor Units of Rubble-Mound Breakwaters using Stochastic Process (추계학적 확률과정을 이용한 경사제 피복재의 예방적 유지관리를 위한 조건기반모형)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.28 no.4
    • /
    • pp.191-201
    • /
    • 2016
  • A stochastic process has been used to develop a condition-based model for preventive maintenance of armor units of rubble-mound breakwaters that can make a decision the optimal interval at which some repair actions should be performed under the perfect maintenance. The proposed cost model in this paper based on renewal reward process can take account of the interest rate, also consider the unplanned maintenance cost which has been treated like a constant in the previous studies to be a time-dependent random variable. A function for the unplanned maintenance cost has been mathematically proposed so that the cumulative damage, serviceability limit and importance of structure can be taken into account, by which a age-based maintenance can be extended to a condition-based maintenance straightforwardly. The coefficients involved in the function can also be properly estimated using a method expressed in this paper. Two stochastic processes, Wiener process and gamma process have been applied to armor stones of rubble-mound breakwaters. By evaluating the expected total cost rate as a function of time for various serviceability limits, interest rates and importances of structure, the optimal period of preventive maintenance can easily determined through the minimization of the expected total cost rate. For a fixed serviceability limit, it shows that the optimal period has been delayed while the interest rate increases, so that the expected total cost rate has become lower. In addition, the gamma process tends to estimate the optimal period more conservatively than the Wiener process. Finally, it is found that the more crucial the level of importance of structure becomes, the more often preventive maintenances should be carried out.

Economic Adjustment Design For $\bar{X}$ Control Chart: A Markov Chain Approach

  • Yang, Su-Fen
    • International Journal of Quality Innovation
    • /
    • v.2 no.2
    • /
    • pp.136-144
    • /
    • 2001
  • The Markov Chain approach is used to develop an economic adjustment model of a process whose quality can be affected by a single special cause, resulting in changes of the process mean by incorrect adjustment of the process when it is operating according to its capability. The $\bar{X}$ control chart is thus used to signal the special cause. It is demonstrated that the expressions for the expected cycle time and the expected cycle cost are easier to obtain by the proposed approach than by adopting that in Collani, Saniga and Weigang (1994). Furthermore, this approach would be easily extended to derive the expected cycle cost and the expected cycle time for the case of multiple special causes or multiple control charts. A numerical example illustrates the proposed method and its application.

  • PDF

The Effects of Imprecise Measurement on the Economic Asymmetric $\bar{X}$ and S Control Charts

  • Yang, Su-Fen
    • International Journal of Quality Innovation
    • /
    • v.3 no.2
    • /
    • pp.46-56
    • /
    • 2002
  • The presence of imprecise measurement may seriously affect the efficiency of process control and production cost. A cost model is derived to determine the design parameters of the economic asymmetric $\bar{X}$ and S control charts including measurement errors. The effects of imprecise measurement on the performance of the economic asymmetric $\bar{X}$ and S control charts and production cost are examined for the case where the process mean and process standard deviation may change. Application of the proposed control charts is demonstrated through an example. Numerical examples illustrate the effects of imprecise measurement on the design parameters of the proposed control charts. It shows that the imprecision measurement may seriously affrct the ability of the proposed control charts to detect process disturbances quickly, change the sampling frequency, and increase the production cost compared to the control charts excluding measurement errors.