In order to improve the removal ability of phosphate, Spheroplast fusions were performed among auxotrophic mutants of Aeromonas hydrophila isolated from waste water, named A13 and A14, Aci37 auxotrophic mutant of Acinetobactercalcoaceticus, and auxotrophic E. coli HR262/pCE27 carring pit gene. Eight fusants obtained from this experiment showed different biochemical characteristics. When the rate of phosphate uptake among fusants (F1-F8) was investigated in Phosphate Uptake Medium (PUM), F8 strain showed the highest rate for phosphate removal, 7 times as much as control after two hours incubation. The role of cations ($Mg^{++}$ ,$Ca^{++}$ , $K^{+}$ in phosphate uptade by F8 was also investigated in PUM without each salt. $K^{+}$ seemed to be crucial. Being compared with phosphate untake rate in PUM, that in PUM without $K^{+}$ was reduced 1.5 times. Therefore, by applying F8 strain and $K^{+}$ in practical environmental system, the increased efficiency in phosphate removal can be derived.
The spectral interferences of OH from aqueous solvents in ICP-AES have been studied and eliminated using a cryogenic argon trap. The prominent lines of Bi I 306.772 nm, Al I 309.271 nm, and V II 310.230 nm, which are very seriously overlapped with the OH band, were examined. With an extended torch and high tangential flow of 20 L/min, water vapor from air entrainment was prevented. The combination of a condenser and argon cryogenic trap was able to eliminated most of water vapor carried by the argon sample gas. Removal of OH spectral interference could extend the linearity of the calibration curve 5-10 times on the lower concentration for ICP-AES. Interference Equivalent Concentration (IEC) has been reduced to 5.6, 5.9, and 12.4 times for Bi, Al and V, respectively.
To evaluate the smoke control systems, the large eddy simulation turbulence model based Fire Dynamics Simulate was applied to a 2m $\times$ 2m $\times$ 2.4m room with an opening. The smoke removal rate was investigated for three different smoke control systems: ventilation, extraction and pressurization. When the opening was closed, the smoke removal rates of the smoke control systems were almost the same as expected. The pressurization system showed a lower smoke removal rate compared with the other two smoke control systems for the room with the opening, and hence the pressurization system might not be efficient for a place with large openings. It was shown that the lower extraction flowrate is, the longer time the ventilation system requires to remove smoke. From these results, the ventilation system is recommended for subway stations where several large openings exist.
This work focused on the effects of the timing and the frequency of shoot cutting to maximize the productivity and the nutrient removal of three emergent macrophytes, Phragmites communis, Zizania latifolia and Typha angustifolia in natural wetlands. Shoot cutting significantly enhanced biomass production and resulted in more nitrogen and phosphorus removal from water in these three experimental species, compared to those of control. However, the frequency and the timing of shoot cutting, and the enhancement ratio were different among three species. For Phragmites stands, the highest productivity was 1.9 times of control in June treatment of the first year experiment, while 1.3 times in May treatment of the second year experiment. Zizania and Typha stands were both 1.2 times of control in August treatment and June and August treatment. Calculating the total annual removal rate of nitrogen and phosphorus based on the highest productivities among treatments, in Phragmites stands, 2.0 times of nitrogen and 1.8 times of phosphorus were removed in the first year, and both 1.4 times in the second year experiment. Likewise, for nitrogen and phosphorus; 2.4 and L.8 times in Zizania stands, and 1.8 and 1.9 times in Typha stands were removed. Overall, these results suggested that cutting treatment of shoots be effective. Thus, shoot cutting of two times during a growing season were recommended to maximize the effects: that is, in May or June, and October for Phragmites stands, and in August and October fur Zizania and Typha stands.
Journal of Korean Society of Environmental Engineers
/
v.22
no.2
/
pp.265-277
/
2000
Laboratory experiments were conducted to investigate characteristics for removing ammonia-nitrogens by electrolysis methods. A stainless steel plate is used as the cathode and either $IrO_2{\backslash}Ti$ plate serves as the anode. Experiments were conducted to examine the effects of the operating conditions, such as the current density, retention time, electrode gap, $Cl^-/NH_4{^+}-N$ on the $NH_4{^+}-N$ removal efficiency. Possible optimum range for these operating variables are experimentally determined. The $NH_4{^+}-N$ removal efficiencies between plate type anode and net type anode were about same effect, but electrolytic power using net type anode is low than plate type anode. The $Cl^-/NH_4{^+}-N$ ratio was about $20.0kgCl^-/kgNH_4{^+}-N$ when $NH_4{^+}-N$ removal obtained 73 %, $Cl^-/NH_4{^+}-N$ ratio needs $27.6kgCl^-/kgNH_4{^+}-N$ so as to $NH_4{^+}-N$ completely remove. The removal efficiency of $NH_4{^+}-N$ increase with current density, retention time and $Cl^-/NH_4{^+}-N$ ratio, but decreased with increasing electrode gap. The relationship of operating conditions and $NH_4{^+}-N$ removal efficiencies are $$NH_4{^+}-N_{re}(%)=14.5364(Current\;density)^{0.7093}{\times}(HRT)^{1.0060}{\times}(Gap)^{-0.9926}{\times}(Cl^-/NH_4{^+}-N)^{1.0024}$$ With adding COD or/and alkalinity, relationships are $$NH_4{^+}-N_{re}(%)=9.8408(Current\;density)^{0.6232}{\times}(HRT)^{1.0534}$$ There existed a competition between the removals for $NH_4{^+}-N$ and $COD_{Cr}$ during electrolysis, the removal of $NH_4{^+}-N$ was shown to be dominant. $NH_4{^+}-N$ removal was high as addition of glucose and alkalinity.
An experimental study on improvement of the paper-mill wastewater treatment using the pure oxygen activated sludge process was conducted. The effects of hydraulic retention time(HRT) and BOD loading on organic removal efficiency were investigated. The BOD removal efficiencies were above 90% under all examined HRTs except for HRT of 3 hours. The increase of HRT from 3 hours to 6 hours, and to 12 hours significantly improved BOD and COD removal efficiencies, respectively. However, additional increase of HRT did not affect organic removal efficiency. F/M ratio change at fixed HRT did not affect organic removal efficiency. However, F/M ratio investigated in this study(0.11~1.98kgBOD/kgMLVSS/day) was 5 times greater in maximum than that of conventional activated sludge process, which implies that pure oxygen activated sludge process can treat wastewater with high organic strength. Under the same HRT, the volumetric BOD loading change cause no effect on organic removal efficiency also.
Nutrients in wastewater should be removed prior to release in the receiving waters to prevent the occurrence of eutrophication. In this study, seawater is used to remove ammonia and phosphate by the formation of struvite ($MgNH_{4}PO_{4}{\cdot}6H_{2}O$). It aims to know the optimum conditions for the removal of nutrients using seawater as source of magnesium ions. Experiments were performed using jar tester and pH of ammonium-phosphate solutions were adjusted Samples were drawn at different mixing times. It was shown that simultaneous removal of ammonia and phosphate is rapid, with no significant reduction beyond 10 min of mixing Another important parameter is pH, where range 10-11 showed the optimum nutrient removal. Increase in the volume of seawater, which meant an increase in magnesium ions also lead to better removal.
Journal of the Korean Society of Industry Convergence
/
v.16
no.2
/
pp.35-39
/
2013
This paper synthesized the new copper removal agent(PW-2001) and investigated removal efficiency of copper, COD, calcium, SS and sludge amounts. Removal efficiency of copper were 96.1% and 99.1% with the lime and PW-2001, respectively while COD removals reached up to 38% and 69.6% with the use of lime and PW-2001. The concentrations of calcium and SS with PW-2001 were decreased 2.68 and 4.95 times lower than those with lime. Amount of sludge with PW-2001 was 60% smaller than lime. Quantity of PW-2001 needed for coagulation only reached 58.7, compared to lime standard quantity(100), and total cost of copper removal with PW-2001 was saved 25% more than lime.
HRP(high rate pond) which had kept the manufactured clay of 3cm-thickness as benthic clay in reactor and the 6 flat-blade turbine as impeller for agitation was named HRASP(high rate algae stabilization pond). And the experiment for treatment of artificial synthesis wastewater containing COD :300mg/$\ell$, NH$_3$-N : 300mg/$\ell$, T-P : 9mg/$\ell$ as nutrients was been performed successfully. This reactor was been operated under conditions : 24hrs.-irradiation and water temperature, $25^{\circ}C$ and pH 7 and agitation velocity, 15, 30, 45rpm and the effect of agitation velocity on algal bioaccumulation of nutrients was been studied with view point of fluid dynamics. The next followings could be obtained as results. 1. The agitation with a turbine impeller blade in HRASP makes clay particle indicate superior suspension effect by means of forming of excellent curl/shear flow in reactor. 2. The excessive suspension of clay particle which is created at 45rpm as rotation velocity of impeller blade of turbine disturbs the light penetration and algal photosynthesis reaction. 3. Efficiencies for removal of nutrients come out as COD : 93.9%~94.3%, ($NH_3-N + NO_3-N$) : 81.9%~99.0%, T-P : 46.8%~53.6%. 4. Kuo values of $K_1$for algal growth come out seperately as 15rpm : $1.876{\times}10^{-2}, 30rpm : 4.618{\times}10^{-3}$. 5. Kuo values of $K_2$for removal of N, P come out seperately as 15rpm : $8.403{\times}10^{-1}$ and $1.397{\times}10^{-1}$, 30rpm : $4.823{\times}10^{-1} and 2.052{\times}10^{-1}$. 6. It can be guessed easily that the excessive agitation can inhibit the algal and bacterial symbiotic reaction if it is considered that micro organism\` sense to preservation of life is relied on natural function of metabolism. Therefore the studies for this matter should be followed continuously.
Journal of Korean Society for Atmospheric Environment
/
v.21
no.E2
/
pp.41-48
/
2005
A novel hybrid system composed of a biotrickling filter and an activated sludge reactor was investigated under the conditions of four different SRTs (sludge retention times). The performance of the hybrid reactor was found to be directly comparable among the four different sludge ages. Discernible differences in the removal performance were observed among four different SRTs of 2, 4, 6, and 8 days. High removal efficiency was achieved by continuous circulation of activated sludge over the immobilized mixture culture, which allowed on pH control, addition of nutrients, and removal of paint VOCs (volatile organic compounds). The results also showed that the removal efficiency for a given pollutant depends on the activity of microorganisms based on the SRT. As the SRT increased gradually from 2 to 8 days, the average removal performance decreased. The highest removal rate was achieved at the SRT of 2 days at which the highest OUR (oxygen uptake rate), $6.1mg-O_2/liter-min$ was measured. Biological activity in the recycle microbes decreased to a much lower level, $3.6mg-O_2/liter-min$ at a SRT of 8 days. It is thus believed that young microorganisms were more active and more efficient for the VOCs removal of low concentrations and high flow rates. The apparent correlation of $R^2=0.996$ between the average removal efficiency and the average OUR at each SRTs suggests that VOCs degradation by young cells significantly affected the overall removal efficiency for the tested SRTs.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.