• 제목/요약/키워드: removal of nitrogen and phosphorus

검색결과 423건 처리시간 0.033초

초음파처리 슬러지 탄소원을 첨가한 침지헝 분리막공법의 질소, 인 처리에 관한 연구 (The Nitrogen and Phosphorus Removal of MUNR Process Using Sludge Carbon Source)

  • 김영규;황성희
    • 한국환경보건학회지
    • /
    • 제28권5호
    • /
    • pp.1-3
    • /
    • 2002
  • This study was to evaluate on the removal efficiencies of total nitrogen and phosphorus in municipal wastewater at MUNR process using sludge carbon source for environmental micro-organism. The removal efficiencies of total suspended solid were 85.9~91%, total nitrogen were 38.6~87.2% and total phosphorus were 30.8~39.0%, respectively. It was shown that removal efficiency of nitrogen was effectively influenced by sludge carbon source treated with ultrasonication. The removal efficiency of total phosphorus was low because the sludge was not wasted during this treatment.

슬러지 탄소원을 주입한 UNR공정의 동절기 질소, 인 처리효율 (The Nitrogen and Phosphorus Removal of UNR Process Using Sludge Carbon Source)

  • 김영규;김인배
    • 한국환경보건학회지
    • /
    • 제28권1호
    • /
    • pp.93-97
    • /
    • 2002
  • The aim of this study was to evaluate on the removal effect of total nitrogen and phosphorus with municipal wastewater in ultrasonic nutrient removal (UNR) process using ultrasonic sludge carbon source. The removal efficiency for total nitrogen was 44.2% at biological nutrient removal (BNR) process, 50.8% at UNR process. The removal efficiency for total phosphorus was 45.6% at BNR process, 46.2% at UNR process. The removal of nitrogen was effectively influenced by ultrasonic sludge carbon source.

Study on Simultaneous Removal of Nitrogen and Phosphorus Using Zeocarbon

  • Hong, Ji-Sook;Suh, Jeong-Kwon
    • Carbon letters
    • /
    • 제11권2호
    • /
    • pp.112-116
    • /
    • 2010
  • The objective of this study was to evaluate the possibility of simultaneous removal of ammonium, nitrate and phosphorus in water using the zeocarbon. In this study, the surface of zeocarbon was modified by acid because of difficulty in application of water treatment. After surface modification, the strength was enhanced about 62% higher than that of original one. The removal efficiency of ammonium and nitrate using the modified zeocarbon was about 47% and 32%, respectively and were higher than that of zeocarbon. In batch type experiment on the simultaneous removal of ammonium, nitrate and phosphorus, the presence of phosphorus did not have influence on nitrogen removal efficiency. Concomitantly, removal efficiency of phosphorus was obtained was about 35%. This indicates that the surface modified zeocarbon can be applied for simultaneous removal of nitrogen and phosphorus. Consequently, our results could be used as basic data to design of one-stage nitrogen/phosphorus simultaneous removal system.

N, P 농도에 따른 Chlorella vulgaris의 성장 및 하수고도처리능 평가 (Advanced wastewater treatment capacity and growth of Chlorella vulgaris by nitrogen and phosphorus concentrations)

  • 한수현;이윤희;황선진
    • 상하수도학회지
    • /
    • 제27권1호
    • /
    • pp.77-82
    • /
    • 2013
  • The growth and removal capacity of nitrogen and phosphorus of Chlorella vulgaris were evaluated in artificial wastewater with different nitrogen and phosphorus concentrations as element growing components for microalgae growth. The nitrogen concentration was varied in 9, 15, 30 and 60 mg-N/L with fixed phosphorus concentration of 3 mg-P/L. The growth and phosphorus removal capacity of C. vulgaris were high at initial nitrogen concentration of 15 and 30 mg-N/L, and the corresponding N/P ratios calculated were 5 and 10. In the case of varying in 1.5, 3, 6 and 10 mg-P/L of phosphorus concentration with fixed nitrogen concentration of 30 mg-N/L, the growth and removal capacity of nitrogen and phosphorus were excellent with phosphorus concentration of 3 and 6 mg-P/L. The corresponding N/P ratios were shown as 10 and 5. Therefore, the appropriate N/P ratio was concluded between 5 and 10 for wastewater treatment using C. vulgaris.

SBR과 SBBR에서 유입 인 농도 감소에 따른 인과 질소의 제거 특성 변화 (Variation of Phosphorus and Nitrogen Removal Characteristics According to the Decrease of Influent Phosphorus Concentration in SBR and SBBR)

  • 김동석;박영식
    • 한국환경과학회지
    • /
    • 제19권4호
    • /
    • pp.483-490
    • /
    • 2010
  • The purpose of this study is to investigate the effect of influent phosphorus concentration on the nitrogen and phosphorus removal in sequencing batch reactor(SBR) and sequencing batch biofilm reactors(SBBRs) in order to recover the enhanced biological phosphorus removal (EBPR) capacity at the sludge of the deterioration of EBPR capacity. In SBBRs, comparing to SBR, the organic removal was occurred actively at the 1 st non-aeration period because of the active phosphorus release at this period. However, the variation of TOC removal according to the decrease of influent phosphorus concentration was not clearly shown both in SBR and SBBRs. In case of SBR losing EBPR capacity, the EBPR capacity was not recovered by the decrease of the influent phosphorus concentration from 7.5 mg/L to 0.9 mg/L. The nitrogen removal increased by the decrease of influent phosphorus concentration both in SBR and SBBRs.

알루미늄부식을 조합한 간헐폭기법에 의한 합성폐수 중의 인 및 질소 제거 (Phosphorus and Nitrogen Removal from Synthetic Wastewater by Intermittently Activated Sludge combined with Aluminium Corrosion)

  • 정경훈;정오진;최형일
    • 한국환경보건학회지
    • /
    • 제27권3호
    • /
    • pp.99-106
    • /
    • 2001
  • A laboratory experiment was performed to investigate phosphorus and nitrogen removal from synthetic wastewater by intermittently activated sludge process packed with aluminium plate. Three continuous experimental systems, I. e. an intermittently activated sludge process(Run A), an intermittently activated sludge process with an aluminium plate packed into the reactor(Run B), and a reactor post stage(Run C) were compared. In the batch experiments, the phosphorus removal time in the reactor packed with copper and aluminium plate simultaneously was faster than that of the reactor packed with only an aluminium plates. However, the reactor packed with only an aluminium plate could be used for phosphorus removal. Move phosphorus was removed with an increase of surface area of aluminium plate and electrolysis(NaCl) concentration. The efficiency of COD and nitrogen removal was not affected in Run B. However, the phosphrus removal efficiency decreased because of reaction products and activated sludge which gradually covered gradually the surface of the aluminium plate. The efficiency of phosphorus removal in Run C was 86.3% at the HRT of 3.2 hours. Especially, the efficiency of phosphorus removal in Run C was higher than that in Run B.

  • PDF

연속회분식반응조 공정에서 교반/폭기비와 SRT가 영양염류제거에 미치는 영향 (Effects of mixing/aeration ratio and SRT on nutrient removal in SBR process)

  • 전석준;김한수
    • 한국물환경학회지
    • /
    • 제18권3호
    • /
    • pp.291-301
    • /
    • 2002
  • In this study, nutrients treatment by sequencing batch reactors(SBR) was performed. Nitrogen and phosphorus removal efficiencies were evaluated by changing SRT and mixing/aeration ratio. Not only nitrogen but also phosphorus removal patterns were investigated through track studies on 1 cycle. As SRT was fixed and mixing/aeration ratio was changed, maximum nitrogen removal efficiency was 87.6% at mixing/aeration ratio 0.67. Phosphorus removal efficiencies were more than 85.5% except no mixing condition. As mixing/aeration ratio was fixed and SRT was changed, nitrogen removal efficiencies were 70.5~79.8%, which represented slight changes, while phosphorus removal efficiencies were 49.0~97.3%, which represented sharply decreasing tendency at less than 20 day. Both phosphorus release rate k and maximum phosphorus release rate $P_{max}/M$ were are decreased as SRT was decreased, but they were not affected by mixing/aeration ratio. It was found that there is a linear relationship between ortho-phosphate uptake and maximum ortho-phosphate release.

FNR process를 이용한 하수처리장의 질소.인의 제거에 관한 연구 (A Study on Nitrogen and Phosphorus Removal in FNR Process)

  • 조일형;이내현;이승목;김영규
    • 한국환경과학회지
    • /
    • 제15권6호
    • /
    • pp.571-577
    • /
    • 2006
  • This study make a comparison between the phosphorus removal performance of FNR(Ferrous Nutrient Removal) process and A/O process by the laboratory experiments. For simultaneous removal of phosphorus, iron electrolysis was combined with oxic tank. Iron precipitation reactor on the electrochemical behaviors of phosphorus in the iron bed. The phosphorus removal in FNR process was more than A/O process. Iron salts produced by iron electrolysis might help to remove COD and nitrogen. And the demanded longer SRT is the more removes the removes COD, nitrogen, and phosphorus. Also, FNR process of sludge quantity more reduce than A/O process to input cohesive agents.

Removal of Inorganic Nitrogen and Phosphorus from Cow s Liquid Manure by Batch Algal Culture

  • KIM, MAM-SOO;MOO-YOUNG PACK
    • Journal of Microbiology and Biotechnology
    • /
    • 제3권3호
    • /
    • pp.214-216
    • /
    • 1993
  • Cow's liquid manure (CLM), an animal waste, was treated by a batch algal culture to remove inorganic nutrients. CLM used in this study was especially high in concentrations of inorganic nitrogen and phosphorus. The optimum dilution ratio of the CLM for maximum algal growth was 1:25. Ninety five percent of inorganic nitrogen and 100% of inorganic phosphorus were removed from the CLM with a dilution ratio of 1:25.

  • PDF

SBR에서 포기기간 변경에 따른 질소.인 제거 특성 (Nitrogen and Phosphorus Removal Characteristics by the Variation of Aeration Time in SBR)

  • 김동석;박영식
    • 한국환경보건학회지
    • /
    • 제35권2호
    • /
    • pp.116-123
    • /
    • 2009
  • Laboratory scale experiments were conducted to investigate the removal characteristics of nitrogen and phosphorus by the variation of aeration time in four sequencing batch reactors (SBRs). In R1 which has the shortest aeration time as 1 h, MLVSS concentration in reactor decreased by the wash-out of biomass because of the poor sedimentation. The TOC removal efficiencies were almost similar in 3 reactors except R1. At the low aeration time as 1 h, the nitrification was severely inhibited by the deficiency of oxygen. ${NH_4}^+$-N removal efficiency was decreased by the decrease of aeration time. At the aeration time over 2 h, the phosphorus removal efficiency was not affected by the variation of aeration time. The nitrification was inhibited but the phosphorus release and uptake was not inhibited by the decrease of low aeration time. Therefore, we can see that the phosphorus removal microorganisms are superior to nitrification microorganisms in oxygen utilization.