• 제목/요약/키워드: reliability management plan

검색결과 262건 처리시간 0.027초

집중관리부품 선정을 위한 평가요소 개발과 활용방안 연구 (A Study on the Evaluation Criteria Development for Selecting Intensive Management Items and Its Application Plan)

  • 우희성;정상규;이창우
    • 품질경영학회지
    • /
    • 제41권3호
    • /
    • pp.475-486
    • /
    • 2013
  • Purpose: In this study, we propose the evaluation criteria and method for selecting intensive management items which, in order to improve the parts management.1) Methods: Parts management such as MIL-STD-3018, SD-19, SD-22 is used for devising the proposed evaluation criteria and method of selecting intensive management items. Especially, proposed evaluation criteria is customized by using AHP method. Results: We approved the importance of evaluation criteria for selecting intensive management items using AHP method. In production step, the parts problem record, the parts reliability, the supplier reliability, DMSM S1). In development step, the parts problem record, a counterfeit, the parts reliability, MTTF2). Conclusion: The evaluation criteria and method for selecting intensive management items which is applicable to the domestic weapon acquisition environment is proposed.

RELIABLE ROLE OF NUCLEAR POWER GENERATION UNDER CO2 EMISSION CONSTRAINTS

  • Lee, Young-Eal;Jung, Young-Beom
    • Nuclear Engineering and Technology
    • /
    • 제39권5호
    • /
    • pp.655-662
    • /
    • 2007
  • Most decision makers in the electricity industry plan their electric power expansion program by considering only a least cost operation, even when circumstances change with differing complexities. It is necessary, however, to analyze a long-term power expansion plan from various points of view, such as environmental friendliness, benefit of a carbon reduction, and system reliability, as well as least cost operation. The objective and approach of this study is to analyze the proper role of nuclear power in a long-term expansion plan by comparing different scenarios in terms of the system cost changes, $CO_2$ emission reduction, and system reliability in relation to the Business-As-Usual (BAU). The conclusion of this paper makes it clear that the Korean government cannot but expand the nationwide nuclear power program, because an increased energy demand is inevitable and other energy resources will not provide an adequate solution from an economic and sustainability point of view. The results of this analysis will help the Korean government in its long-term resource planning of what kinds of role each electric resource can play in terms of a triangular dilemma involving economics, environmental friendliness, and a stable supply of electricity.

One-Shot System의 신뢰도 분석을 통한 적정 점검주기 방안 연구 (A Study on the Proper Inspection Cycle Plan Through Reliability Analysis of One-Shot System)

  • 임준영;설현주
    • 산업경영시스템학회지
    • /
    • 제46권1호
    • /
    • pp.48-54
    • /
    • 2023
  • Guided missiles are a one-shot system that finishes their purpose after being used once, and due to the long-term storage until launch, the storage reliability is calculated during development, and performance is maintained through periodic inspections until the life cycle arrives. However, the reliability standards applied in the development of guided missiles were established by analyzing data accumulated by the United States during long-term operation in the country, and since they are different from our environment, the 00 guided missiles that have been deployed in the armed forces for more than 10 years under the premise that there is a difference from actual reliability. As a result of verifying the appropriateness of the current inspection cycle by analyzing the actual reliability of the missile, the necessity of changing the inspection period was derived because it was higher than the predicted reliability. It is proposed to build and utilize a lifespan management system that can systematically collect all data such as shooting and maintenance results by classification, and to establish a reliable reliability standard based on the accumulated data.

시공단계 환경관리를 위한 체크리스트 항목 도출 (Factor Deduction of the Checklist for Environmental Management in Construction Phase)

  • 김창원;이명도;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.139-141
    • /
    • 2013
  • Construction industry has been participated in the effort for the reduction of environmental pollution such as introduction of green building certification, enactment of environment related regulation. However these efforts are focused on the design and maintenance phases of entire life cycle, construction phase that can occur intensive environmental impact in a short period is insufficient. Therefore this study aim to derive environmental management factors in construction phase and assess them using reliability analysis and factor analysis. As a results, the 20 factors was classified into 4 superordinate such as 'plan and supervision', 'environmental factor management', 'licensing management', 'surrounding environment management'.Based on result of this study, further study should be developed the checklist for effective environmental management in construction phase.

  • PDF

우주발사체 시스템 개발에 있어서의 SE관리기법 적용 (Application of SE Management Techniques for space Launch System Development)

  • 조미옥;조병규;오범석;박정주;조광래
    • 시스템엔지니어링워크숍
    • /
    • 통권4호
    • /
    • pp.90-94
    • /
    • 2004
  • System engineering(SE) management techniques applied for space launch system development are introduced to assess the current status and address the effwctiveness of these techniques. Management plans and guides are prepared for the work breakdown structure , data, comfiguration, interface control, Quality assurance, procurement, reliability, risk and verification/validation . Further improvement is required for the system engineering management plan(SEMP) to merge the international cooperation into current engineering managment system.

  • PDF

한국형 배전계통 자산관리 시스템의 개발 (The Development of Korea Distribution Asset Management System)

  • 채우규;박창호;정종만;박상만
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.187-189
    • /
    • 2005
  • The asset management system for power distribution is necessary to make efficient use of distribution asset and to devise optimum investment plans. So we developed KDAMS(Korea Distribution Asset Management System) that is adopting reliability indexs, SAIFI and SAIDI, and operator's experiences. This paper presents functions of the system that is reliability management, failure rate management, establishment of optimum investment plan and so on. And it presents the of used algorithms to develop this system.

  • PDF

Case Analysis for the Development of Smart Factory ISP Indicators

  • Heon-Wook Lim
    • International Journal of Advanced Culture Technology
    • /
    • 제11권3호
    • /
    • pp.321-326
    • /
    • 2023
  • The purpose of this study is to create and present a formalized module of ISP (Information Strategy Plan), a smart factory consulting method that is helpful to companies or consultants who will build smart factories. Order of study is First, the theoretical research direction is established through the investigation of related papers. Second, ISP policy research practices are compared to derive practical implementation methods. Third, in order to derive a standardized module method related to the final smart factory ISP, related cases of the government and individuals are compared. As a result of previous research, ISP (Information Strategy Planning), a consulting methodology, is similar to Deming's PDCA, and is regarded as Plan (environment and current status analysis), Do (establishment of future model goals), Check (establishment of implementation plan), and Act (follow-up management). As a result of the study, we obtained the following results. The first step is to analyze the current status and identify the purpose of introduction and problems in plant operation. In the second step, establish a consulting plan and derive a proposal description, strategic task, and master plan. Step 3 establishes detailed action plans, evaluates consulting outputs and consulting, and reports performance. Step 4 is established as follow-up management consulting. The limitation of the study is that although related data were compared to develop the consulting methodology into a standardized module, FGI analysis through experts or Delphi survey were not conducted, so there is a limit to the reliability of the mapping results.

신뢰성 분석 기반 발전설비 점검계획 수립 시스템 연구- 석탄 하역기를 중심으로 - (Study of Reliability Analysis Based Power Generation Facilities Maintenance System - Focused on Continuous Ship Unloader -)

  • 황성환;김유림;강성우
    • 품질경영학회지
    • /
    • 제51권2호
    • /
    • pp.315-327
    • /
    • 2023
  • Purpose: Recently, research has continued to predict the time of failure of the facility through measurement data obtained by attaching a sensor to the facility. However, depending on the facility, it may be difficult to attach a sensor. The purpose of this study is to propose a power generation maintenance plan system based on failure record data obtained from Continuous Ship Unloader, one of the facilities that is difficult to attach sensors. Methods: This study uses data collected from 2012 to 2022 from the 'CSU-1B' model among Continuous Ship Unloader operated by Korea Midland Power Co., LTD. By fitting fault record data to the Weibull distribution, appropriate maintenance cycles and ranges for each target facility subsystem are derived. In addition, maintenance group between subsystems is selected through Euclidean distance, a metric often used for time series data similarity. Through this, a system for establishing an maintenance plan for power generation facilities is proposed. Results: The results of this study are as follows. For the 17 subsystems of the Continuous Ship Unloader, proper maintenance cycles and ranges were determined, and a total of four maintenance groups were chosen. This resulted in the creation of an power generation maintenance plan system and the establishment of an maintenance plan. Conclusion: This study is a case study of power generation facilities. We proposed a maintenance plan system for Continuous Ship Unloader among power generation facilities.

A Framework of Managing Supply Chain Disruption Risks Using Network Reliability

  • Ohmori, Shunichi;Yoshimoto, Kazuho
    • Industrial Engineering and Management Systems
    • /
    • 제12권2호
    • /
    • pp.103-111
    • /
    • 2013
  • This paper discusses how to manage supply chain disruption risks from natural disasters or other low-likelihood-high-impact risk drivers. After the catastrophic earthquake in Eastern Japan and the severe flood in Thailand, most companies have been attempting to re-establish the business continuity plan to prevent their supply chain from disruption. However, the challenges for managers and individual risks are often interrelated, and thus, actions that mitigate one risk can end up being no contribution as a whole. In this paper, we describe a framework for assessing how much impact individual mitigation strategies have on the entire supply chain protection against disruption, using network reliability. We propose three categories of risk-mitigation approaches: Stabilization, Absorption, and Duplication. We analyze the situation under which each of these strategies is the best suitable. With a clear understanding of relations between these mitigation strategies and the entire supply chain risks, managers can select effective risk-reduction approaches to their supply chain.

외식 가맹점 선택 기준과 가맹 본부의 신뢰도에 관한 연구 (A Study on the Franchisee’s Selecting Criteria and Reliability of a Food Service Franchise)

  • 박재호;천희숙
    • 한국조리학회지
    • /
    • 제12권2호
    • /
    • pp.18-38
    • /
    • 2006
  • We studied franchisees’ answers to the questionnaires to know their selective motives and criteria, their types and the reliability of a franchisor in the food-service industry. Then we showed the basic data about the selective criteria of a sound franchisor. The result of this study was as follows. First, we need a specialist and a department to present a financially sound franchisor. Second, we must determine the criteria of franchise fee, royalty and the other items on payment for the franchisor. Third, the alternative plan to trust the franchisor was needed for a large-scale franchisee.

  • PDF