• Title/Summary/Keyword: reinforced cut slope

Search Result 28, Processing Time 0.021 seconds

The Behavior of a Cut Slope Stabilized by Use of Piles (억지말뚝으로 보강된 절개사면의 거동)

  • Hong, Won-Pyo;Han, Jung-Geun;Lee, Mun-Gu
    • Geotechnical Engineering
    • /
    • v.11 no.4
    • /
    • pp.111-124
    • /
    • 1995
  • On development of mountaneous or hilly area, stability of cut slope should be provided to prevent undesirable landslides. When piles are used as a countermeasure to stabilize existing landslide, stabilities for both piles and slope should be simultaneously satisfied to obtain the whole stability of the slope reinforced by piles. In order to confirm the effect of stabilizing piles on slope stabilization, it is necessary to investigate the behavior of the slope, in which the piles are installed. In this paper, first, the countermeasures used commonly to control unstable slope in Korea were summerized systematically. Nezt, the behavior of piles and slope soil was investigated by instrumentation installed into a cut slope for an apartment stabilized by a row of piles. Instrumentation could present sufficient effect of piles on slope stabilization Construction works in front of the row of piles affected the displacement of piles and slope. The construction works were divided into four stages, i.e. initial cutting stage of slope, excavation stages for retaining wall and parking space, and construction of retaining wall. As the result of research, the applicability of the proposed design method could be confirmed sufficiently.

  • PDF

Seismic analysis and dynamic behavior characterization of rib-reinforced pre-cast tunnels (리브 보강 프리캐스트 터널의 내진 해석 및 동적거동 특성 파악)

  • Song, Ki-Il;Jung, Sung-Hoon;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.3
    • /
    • pp.287-301
    • /
    • 2009
  • The novel cut-and-cover tunnel construction method using rib-reinforced pre-cast arch segments has been recently developed and applied for practice to secure a structural stability of high covering and wide width section tunnels. Cut-and-cover tunnels are usually damaged by the seismic behavior of backfill grounds in case of a low covering condition. Seismic analyses are performed in this study to characterize the dynamic behavior of rib-reinforced pre-cast arch cut-and-cover tunnels. Seismic analyzes for 2 lane cast-in-place and rib-reinforced pre-cast arch cut-and-cover tunnels are carried out by using the commercial FDM program (FLAC2D) considering various field conditions such as the covering height embankment slope and excavation slope. It can be concluded that the amplification of seismic wave is reduced due to an increase in the structural stiffness induced by rib-reinforcement. The results show that the rib-reinforced pre-cast arch cut-and-cover tunnels are more effective against the seismic loading, compared to the cast-in-place cut-and-cover tunnels.

Tension Wire Sensor of shallow failure detection for the real time slop stabilization (지표변위 감지 센서를 활용한 사면 안전감지 시스템)

  • 장기태;윤기재;정성윤;유병선;김경태;이원효
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.10c
    • /
    • pp.19-27
    • /
    • 2001
  • Early detection of premonitory symptom of slope movement ensures tremendous saving of lives and repair costs from catastrophic disaster. Therefore, it is essential to constantly monitor the performance and integrity of both reinforced and un-reinforced cut slopes. We developed a novel monitoring system by using tension wire sensors. It's advantages are highly sensitivity, simple installation, large displacement measurement, durability of system, capability of remote sensing. Real-time measurement of slope surface movement is shown graphically and it gives a warning when the monitored value exceeds a given threshold level so that any sign of abnormal slope movement can be easily perceived.

  • PDF

Tension Wire Sensor of shallow failure detection for the real time slop stabilization (지표변위 감지 센서를 활용한 사면 안전감지 시스템)

  • Chang, Ki-Tae
    • Journal of the Korean Geophysical Society
    • /
    • v.8 no.3
    • /
    • pp.137-143
    • /
    • 2005
  • Early detection of premonitory symptom of slope movement ensures tremendous saving of lives and repair costs from catastrophic disaster. Therefore, it is essential to constantly monitor the performance and integrity of both reinforced and un-reinforced cut slopes. We developed a novel monitoring system by using tension wire sensors. It's advantages are highly sensitivity, simple installation, large displacement measurement, durability of system, capability of remote sensing. Real-time measurement of slope surface movement is shown graphically and it gives a warning when the monitored value exceeds a given threshold level so that any sign of abnormal slope movement can be easily perceived.

  • PDF

An Analytical Study of Slope Stability to Reinforcement Stage in Cut Slope (절개사면에서의 보강단계별 사면안정성에 대한 해석적 연구)

  • Kang, Ki-Chun;Song, Young-Suk;Hong, Won-Pyo;Kim, Tae-Hyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.724-731
    • /
    • 2006
  • The purpose of this study is to estimate a landslide using the SLOPILE program from the slope reinforced by slope stability systems such as soil nailing and pile. To do this, cutting slope located at Donghae-Highway in Kwangwon-Do was considered. The behavior of slope was monitored for a long term by using instrumentation according to the reinforcement stages. The sequence of reinforcement stages was followed as pile installation, boring, soil nailing installation, anchoring and embankment. The result from this case study shows that the safety factor of slope depends on the reinforcement stage more or less.

  • PDF

A Case Study on the Reinforcement of Stabilizing Piles against Slope Failures in a Cut Slope (사면붕괴가 발생된 절개사면에서의 억지말뚝 보강 사례연구)

  • Song Young-Suk
    • The Journal of Engineering Geology
    • /
    • v.16 no.2 s.48
    • /
    • pp.189-199
    • /
    • 2006
  • This paper presents a field study of the stability of slope collapsed during road construction and proposes a reasonable countermeasure if the current slope is unstable. As a result of slope investigation, it was found that the slope includes five tension cracks and the sliding surface is started from the tension crack and propagated the surface soil layer through weathered rock layer. The slope stability analyses are conducted in case of dry and rainfall seasons. The results indicate that the slope is unstable status. A reinforcement method of slope failure should be selected according to the scale of failure. That is, the scale of slope failure, which is classified small, middle and large size determines the reinforcement method of slope. Since the slope interested in this study is large size failure slope, the reinforcement method to control slope failure is selected stabilizing piles, and seed spray and drainage of surface waterare also selected to remain the factor of safety. The SLOPILE (Ver. 3.0) program is applied in order to do stability analysis of slope reinforced by piles. As the result of analysis, the slope reinforced by a row of piles shows the stable state. It is clearly confirmed that the stabilizing of piles can improve the stability of slope.

The Behavior of Stabilizing Piles installed in a Large-Scale Cut Slope (대규모 절개사면에 설치된 억지말뚝의 거동)

  • Song, Young-Suk;Hong, Won-Pyo
    • The Journal of Engineering Geology
    • /
    • v.19 no.2
    • /
    • pp.191-203
    • /
    • 2009
  • The effect of stabilizing piles on cut slopes is checked and the behavior of slope soil and piles are observed throughout the year by field measurements on the large-scale cut slopes. First of all, the behavior of the slope soil was measured by inclinometers during slope modification. Landslides occurred in this area due to the soil cutting for slope modification. The horizontal deformations of slope soil are gradually increased and rapidly decreased at depth of sliding surface. As the result of measuring deformation, the depth of sliding surface below the ground surface can be known. Based on the measuring the depth of the sliding surface, some earth retention system including stabilizing piles were designed and constructed in this slope. To check the stability of the reinforced slope using stabilizing piles, an instrumentation system was installed. As the result of instrumentation, the maximum deflection of piles is measured at the pile head. It is noted that the piles deform like deflection on a cantilever beam. The maximum bending stress of piles is measured at the soil layer. The pile above the soil layer is subjected to lateral earth pressure due to driving force of the slope, while pile below soil layer is subjected to subgrade reaction against pile deflection. The deflection of piles is increased during cutting slope in front of piles for the construction of soil nailing. As a result of research, the effect and applicability of stabilizing piles in large-scale cut slopes could be confirmed sufficiently.

A Study on the Use of a Continuous Fiber Soil Reinforcement System to Revegetate a Cut Slope (비탈면의 생태복원을 위한 연속섬유보강토의 적용성에 관한 연구)

  • Koh, Jeung-Hyun;Hur, Young-Jin;Lee, Yong-Gu;Kim, Nam-Choon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.3
    • /
    • pp.73-83
    • /
    • 2010
  • A technology using continuous fiber soil reinforcement system for the creation of ecological restoration in a damaged area has been developed and introduced. The continuous fiber soil reinforcement system (Geofiber system) is an environmentally friendly slope protection technique that continuous fiber soil reinforced layers are constructed with green plantation on cut slope. The characteristics of this system in terms of the strength and hydraulic performance, and the vegetation were investigated in this study. The main objectives of this comparative study was to quantify the potential contribution of geofiber system for the revegetation on the cut slope in a damaged area. A Geofiber system was constructed to reinforce the lower layer of slopes and revegetation methods including wood chips were carried out on the upper layer by machineries. The results of monitoring during 3 years on cut slopes were as follows : 1) All the quadrat existed in the proper range for vegetation. 2) Species richness was 4.4 (site-1) and 18.5 (site-2) respectively. 3) The averaged coverage rates of quadrats was 90%. It is remarkable that the continuous fiber soil reinforcement system would be capable of applying to a damaged area and also would serve maintaining a healthier environment for floras. However, it behooves to continue monitoring on succession of vegetation for ecological restoration.

The behavior of a Cut Slope Stabilized by Use of Piles during Heavy Rain (억지말뚝으로 보강된 절개사면의 강우시 거동)

  • Han, Jung-Geun;Hong, Won-Pyo;Sin, Min-Ho
    • Geotechnical Engineering
    • /
    • v.12 no.1
    • /
    • pp.35-46
    • /
    • 1996
  • An instrumentation system is designed to observe the behavior of slope soil and stabilizing piles during heavy rains. Inclinometers, standpipe piezometers and strain gages are installed into a cut slope reinforced by a row .of piles for an apartment. The horizontal deflection and bending stress developed on the piles can be measured, respectively, by the inclinometers and strain gages installed in piles, while the horizontal deformation of the slope soil can be measured by the inclinometer installed in the soil across the open space between piles. The groundwater level doss not grow so sensitively during heavy rain. The behavior of piles and slope is 서footed by the wetting front, since the driving force of slope increases with the weight of slope soil above the wetting front. The stabilizing piles and the slope soil show elastic behavior during heavy rain.

  • PDF

A Study on the Cut-slope Maintenance according to Anchor Tension Force (앵커 긴장력 변화에 따른 비탈면 유지관리 연구)

  • Park, Byungsuk;Kim, Wooseok;Hwang, Sungpil;Kwon, Oil
    • The Journal of Engineering Geology
    • /
    • v.30 no.4
    • /
    • pp.673-682
    • /
    • 2020
  • The ground shear force at the expected failure surface and resistance force due to reinforced anchor can act as important factors according to a failure type from the stability viewpoint at a slope. Furthermore, the anchor's axial force may vary at an anchor-reinforced slope due to ground weathering, settlement, and corrosion in the incompletely anti-corrosion treated steel wire strand at a ground where the bearing plate is installed. However, in case that the resistance force of the anchor is locally lost due to the variation of the anchor's axial force, the resistance force may not play the role so that the external force tends to be transferred to the surrounding anchors, causing an increase in the tensile force in the surrounding anchors. Accordingly, a stability problem at the entire slope may occur, which requires much attention. Thus, this study proposed a method to monitor a variation trend of the tensile force of anchors installed at a slope and infer the external stability at the entire slope considering the monitoring result.