• Title/Summary/Keyword: recovery cost

Search Result 609, Processing Time 0.041 seconds

Study on Disaster Recovery Efficiency of Terminal PC in Financial Company (금융회사 단말PC 재해복구 효율에 관한 연구)

  • Yi, Seung-Chul;Yoon, Joon-Seob;Lee, Kyung-Ho
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.25 no.1
    • /
    • pp.211-224
    • /
    • 2015
  • Financial companies have invested a lot in their disaster recovery system and exercised training more than once a year to comply related laws and regulations. But massive PCs(Personal Computers) became disrupted simultaneously and it took a lot of time to recover massive PCs concurrently when March 20 cyber attack occurred. So, it was impossible to meet the tartgeted business continuity level. It was because the importance of PC recovery was neglected compared to other disaster recovery areas. This study suggests the measure to recover massive branch terminal PCs of financial companies simultaneously in cost-effective way utilizing the existing technology and tests recovery time. It means that in the event of disaster financial companies could recover branch terminal PCs in 3 hours which is recommended recovery time by regulatory body. Other financial companies operating similar type and volume of branches would refer to the recovery structure and method proposed by this study.

Estimation of the Expected Socio-economic Benefits of the Largescale Comprehensive Agricultural Development Project and Jointcost Allocation -In the Case of Kumgang Project Area- (대단위 농업종합개발사업의 사회경제적 기대편익 추정과 결합비용의 배분 -금강지구를 중심으로-)

  • Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.23 no.1
    • /
    • pp.159-176
    • /
    • 1996
  • This study is aimed at reviewing the methods of joint cost allocation and allocating the joint cost of estuary dam with specially repect to Kumgang Large-scale Agricultural Comprehensive Development Project. Apart from the water resource development project propelled by Water Resource Development Corporation in connection with Law of Multipurpose Dam Development, the Largescale Comprehensive Agricultural Development Projects couldn't ins-titutionally be carried out cost allocation of common facilities, even though it were concerned with irrigation, municipal and industrical water supply, flood control, sightseeing and industrial zone development components. To decrease farmer's burden of the project costs and, operation and maintenance costs, the joint costs of common facilities like estuary dam included in agricultural development projects have to be allocated by suitable method as alternative cost-remaining benefit method and the analytical activity should be supported by revising the concerned laws as Rural Development and Promotion and, Rural Rearrangement conpatible with the law for multipurpose dam development. Kumgang Agricultural Comprehensive Development Project was selected as a case study for the estimation of socio-economic benefits by project components and joint cost allocation of the estuary dam. The main results of the study are as follows; Joint cost allocation and unit charges by components 1. The project area will be 25,554ha with total project cost of 624,860 million won including the estuary dam cost of 120,843 million won. The project costs were ex-pressed by 1994 constant price. 2. Total quantity of water was estimated 365 million tons which were consisted of 245 million tons for irrigation, 73 million tons for municipal water and 47 million tons for industrial water. 3. The rates of joint cost allocation were amounted to 34.2% for agriculture, 2.5% for sightseeing, 45.7% for transportation, 11.8% for M & I water supply and 5.8% for flood control respectively. 4. The unit financial charges by project components were estimated at 7.88 won per ton for irrigation, 16.11won for M & I water, 1,686won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The financial charges using straitline method for depreciation were estimated at 7.88won per ton for irrigation, 9.12won per ton for M & I water, 624won per vehicle one pass for transportation and 331won per Pyeong for sightseeing area. 5. The unit economic charges by project components were estimated at 21.1 won per ton for irrigation, 15.2won for M & I water, 977won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The economic charges using straitline method for depreciation were estimated at 11.72won per ton for irrigation, 8.61won per ton for M & I water, 331won per vehicle one pass for transportation. Policy recommendation 1. The unit operation and maintenance costs for irrigation water in the paddy field couldn't be imposed as the water resource cost untreated. 2. The dam costs including investment cost and O & M cost, as a joint cost, had to be allocated by each benefited components as transportation, M & I water supply, flood control, irrigation and drainage, and sightseeing. But the agricultural comprehensive project have been dealt as an irrigation project without any appraisal socio-economic benefits and any allocating the joint cost of estuary dam. 3. All the associated project benefits and costs must be evaluated based on accounting principle and rent recovery rate of the project costs and O & M costs should be regulated by the laws concerned. 4. The rural development and promotion law and rural rearrangement law have to be revised comprising joint cost allocation considering free rider problems. 5. The government subsidy for the agricultural base development project has to be covered all the project costs. In case of common facilities representing joint cost allocation problems, all the allocated casts for other purposes like transportation and M & I water supply etc. should be recovered for formation in investment fund for agricultural base development and to procure O & M costs for irrigation facilities.

  • PDF

Large-scale Recovery of Recombinant Protein Inclusion Bodies Expressed in Escherichia coli

  • Middelberg. Anton P.J.
    • Journal of Microbiology and Biotechnology
    • /
    • v.6 no.4
    • /
    • pp.225-231
    • /
    • 1996
  • The production of recombinant proteins in Escherichia coli often leads to the formation of an intracellular inclusion body. Key process steps that can determine the economics of large-scale protein production from inclusion bodies are fermentation, inclusion body recovery, and protein refolding. Compared with protein refolding and fermentation, inclusion body recovery has received scant research attention. Nevertheless, it can control the final product yield and hence process cost for some products. Optimal separation of inclusion bodies and cell debris can also aid subsequent operations by removing contaminant particulates that foul chromatographic resins and contain antigenic pyrogens. In this review, the properties of inclusion bodies and cellular debris are therefore examined. Attempts to optimise the centrifugal separation of inclusion bodies and debris are also discussed.

  • PDF

Improved Dual-Path Energy Recovery Circuit using a Current Source and a Voltage Source for High Resolution and Large-Sized Plasma Display Panel

  • Yi, Kang-Hyun;Moon, Gun-Woo
    • Proceedings of the KIPE Conference
    • /
    • 2008.06a
    • /
    • pp.544-546
    • /
    • 2008
  • An improved dual-path energy recovery circuit (ERC) using a current source and a voltage source for plasma display panel (PDP) is proposed. The proposed ERC uses the voltage source to charge a panel and the current source to discharge the panel. Thus, the proposed circuit can make the panel charge to $V_S$ and discharge to 0V, fully and it is possible to achieve zero voltage switching (ZVS) of all switches in H-bridge inverter and zero current switching (ZCS) of all switches in the ERC. Moreover, it has less conduction and switching loss in ERC devices by the dual energy recovery paths for charging and discharging the panel. Furthermore, it has features of canceling the gas discharge current, high performance and the low cost ERC components. The operation principle and features of the proposed ERC are presented in detail and verified with 42-inch SD PDP.

  • PDF

Comparative study on one and two-path single energy recovery circuit for plasma display panel (PDP)

  • Yi, Kang-Hyun;Choi, Seong-Wook;Moon, Gun-Woo;Park, Jung-Pil;Jung, Nam-Sung
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2006.08a
    • /
    • pp.256-259
    • /
    • 2006
  • Comparison of one two-path single energy recovery circuit for plasma display panel (PDP) is shown in this paper. A single energy recovery circuit (SERC) is proposed to reduce cost for manufacturing PDP and there are two ways, one and two-path, in driving this circuit. Compared with one-path SERC, there are low power consumption, low surge current and high performance in two-path SERC. The results will be shown with 42-inch HD panel.

  • PDF

New current source inverter with load-side energy recovery circuit (부하측에 에너지 회생회로를 갖는 전류원 인버터)

  • Chung, Y.H.;Cho, G.H.
    • Proceedings of the KIEE Conference
    • /
    • 1988.07a
    • /
    • pp.117-120
    • /
    • 1988
  • A new current source inverter (CSl) with dc-side commutation and load-side energy recovery circuit is proposed with analysis and explanation of the circuit operation. Proposed inverter overcomes the most drawbacks of the conventional CSI's - high device voltage stress, low operating frequency range, large commutation capacitance, etc. - by employing simultaneous recovery and commutation concept. The new CSI employs only one commutation capacitor and it can be built with considerably low cost. The commutation energies are temporarily stored into a large dc capacitor and recovered to the load side, thus the device voltage stress is low and the efficiency is high in the proposed inverter. Computer simulation results are given at the steady state, and a guideline determining the commutation circuit is given.

  • PDF

Flow Factor Prediction of Centrifugal Hydraulic Turbine for Sea Water Reverse Osmosis (SWRO)

  • Ma, Ying;Kadaj, Eric;Terrasi, Kevin
    • International Journal of Fluid Machinery and Systems
    • /
    • v.3 no.4
    • /
    • pp.369-378
    • /
    • 2010
  • The creation of the hydraulic turbine flow factor map will undoubtedly benefit its design by decreasing both the design cycle time and product cost. In this paper, the geometry and flow variables, which effectively affect the flow factor, are proposed, analyzed and determined. These flow variables are further used to create the operating condition maps by using different model approaches categorized into Response Surface Method (RSM) and Artificial Neural Network (ANN). The accuracies of models created by different approaches are compared and the performances of model approaches are analyzed. The influences of chosen variables and the combination of Principle Component Analysis (PCA) and model approaches are also studied. The comparison results between predicted and actual flow factors suggest that two-hidden-layer Feed-forward Neural Network (FFNN), and one.hidden-layer FFNN with PCA has the best performance on forming this mapping, and are accurate sufficiently for hydraulic turbine design.

The Properties of Leakage Current of Silicone Rubber wish the Recovery of Hydrophobicity (발수성 회복에 따른 실리콘 고무의 누설전류 특성)

  • 서광석;김정호;문중섭;박용관;양계준;유영식
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 1999.11a
    • /
    • pp.501-504
    • /
    • 1999
  • The polymer insulators which are installed on outdoor have a great advantage than porcelain and 71ass, due to suppression of leakage current, light weight, low cost, etc. It needs variable evaluation methods for application of these insulators on service. The analysis of measuring leakage current is useful for ageing diagnosis because of monitoring in real-time. In this paper, we look over the recovery of hydrophobicity of silicone rubber in mini salt-fog chamber with leakage current monitoring. also, we understand the relation of between hydrophobicity and leakage current and discuss on method of leakage current monitoring.

  • PDF

Series Resonant Type Sustain Driver for PDP Driving (PDP 구동을 위한 직렬공진형 서스테인 드라이버)

  • Kang, Feel-Soon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.12 no.1
    • /
    • pp.115-121
    • /
    • 2008
  • This paper presents a new sustain driver employing energy recovery function to minimize power losses transpired during the operation of plasma display panel. The proposed circuit uses the resonance between the equivalent capacitance of panel and an external inductor to provide/recover energy to/from the panel. The proposed circuit can save the system cost compared with the conventional one, and has high-performance in energy recovery. To verify the validity of the proposed circuit, we implemented experiments based on 7.5 inch AC-PDP.

TCP Session Recovery Technique for High Availability in Smart On-Devices (스마트 온디바이스의 고가용성을 위한 TCP 세션 복구 기술)

  • Hong, Seungtae;Kim, Beob-Kyun;Lee, Kwang-Yong;Kim, Jeong-Si;Lim, Chae-Deok
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.6 no.6
    • /
    • pp.261-270
    • /
    • 2017
  • With the development of smart on-devices and communication technology, demand for non-stop services is increasing. Therefore, the high availability for continuously providing services in the event of system failure has been spotlighted. Meanwhile, because most internet-based services are provided by using TCP, an efficient TCP session recovery technique for providing non-stop services is required. However, the existing TCP session recovery techniques are inefficient because it has a high recovery cost or does not support failover operation, To solve these problems, in this paper, we propose a TCP session recovery technique for high availability in smart on-devices. For this, we first recover the TCP session without re-establish the TCP session by correcting a sequence number and a acknowledgment number. Second, we synchronize the TCP session recovery data between the master and the server, and then we operate the failover operation when master server fails. Finally, we provide the non-stop service to peer by using the virtual IP number and the transmission of GARP (Gratuitous ARP) packet.