Supply Chain Coordination Under the Cap-and-trade Emissions Regulation (탄소배출권거래제도에서의 공급망 조정 모형)

  • Min, Daiki
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.3
    • /
    • pp.243-252
    • /
    • 2015
  • This paper considers a supply chain consisting of a manufacturer under the cap-and-trade emissions regulation and a permit supplier. We study joint production quantity and investment in reducing permit production cost decisions for centralized and decentralized supply chains. We formulate two supply chain contracts with aims to coordinate the decentralized supply chain; wholesale price contract and cost-sharing contract. Under the cost-sharing contract, the manufacturer shares a part of the investment in reducing permit production cost and then is allowed to purchase emission permit at a lower price. We analytically find that the proposed cost-sharing contract with reasonable parameters can coordinate the supply chain whereas the wholesale price contract is not desirable to achieve the system-wide profit. Numerical example is followed to support the analysis.

A Delphi Study on the Price Escalation Clause in a Construction Contract

  • Choi, Min Soo;Kim, Moo Han
    • Architectural research
    • /
    • v.8 no.1
    • /
    • pp.69-76
    • /
    • 2006
  • The purpose of this study is to suggest policies to improve the price escalation system in a construction contract through a Policy Delphi technique. The Delphi, including two times questionnaires and a group discussion, was conducted by joining 14 experts. Also, the escalation provisions of various countries were examined. Results of the Delphi showed that the minimum fluctuation rate for price escalation was desirable at a level of 3%. To compute the fluctuation rate, calculating the price fluctuation of overall articles was more desirable than using price indices. A bidding date was more reasonable as the initial date of change in price. Losses caused by price change should be shared between contractor and owner; therefore a deduction rate should be introduced in price escalation. Meanwhile, overhead and profit should be adjusted in proportion to the fluctuation rate; but advance payment or the delayed construction amount should be deducted from the adjusted amount.

Development of the Pre-Dispatch Scheduling Algorithm in the Competitive Electricity Market (경쟁적 전력시장 하에서의 선행급전계획 알고리즘 개발에 관한 연구)

  • Chung, Koo-Hyung;Kang, Dong-Joo;Han, Seok-Man;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.388-389
    • /
    • 2006
  • Systematic studies on the dispatch scheduling algorithm and related constraints can enhance the effectiveness of electricity market operation. Moreover, since various decision-making matters connected to dispatch schedule in competitive electricity market directly affect the market participants' profit, the dispatch scheduling procedure should be reasonable and systematic to convince them. Therefore, to prevent a dispute among the participants, these studies are indispensible requisites for the effective electricity market operation. In this paper, we develop unconstrained/constrained dispatch schedule algorithm applicable to Korean wholesale electricity market.

  • PDF

A study on a constrained pre-dispatch algorithm with considered security (안전도를 고려한 제약 선행급전 알고리즘에 관한 연구)

  • Kim, Kwang-Mo;Chung, Koo-Hyung;Han, Seok-Man;Park, Kyoung-Han;Kim, Bal-Ho H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.167-169
    • /
    • 2006
  • Systematic studies on the dispatch scheduling algorithm and related constraints can enhance the effectiveness of electricity market operation. Moreover the introduction of competition in electricity market emphasizes various decision-marking matters connected to dispatch scheduling procedure. Because these affect the market participants' profit, the dispatch scheduling procedure should be reasonable. In this paper, we propose a constrained Pre-dispatch algorithm with considered security using sensitivity indices.

  • PDF

A Cooperative Game Embedding Transmission Pricing in the Competitive Electricity Market (송전요금을 고려한 게임이론적 전력거래분석)

  • Kang, Dong-Joo;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2000.11a
    • /
    • pp.3-5
    • /
    • 2000
  • It has been the paradigm of game theory that more than two utilities compete and determine the price and amount of dispatch. In order for this theory to be available on real power system, it is necessary to consider the transmission costs as well as the generation costs. In addition Independent System Operator(ISO) should be able to mitigate the congestion, recover the transmission costs and provide information for long-term capacity investment by devising reasonable pricing schemes for the transmission services. Generators also have to take the transmission costs into account when building the bidding strategies. This paper proposes an approach to analyzing the profit maximizing game considering the transmission cost in a competitive electricity market.

  • PDF

A Study on the Capacity Payment in Cost Based Pool (비용기반 전력시장에서의 용량요금 산정방안에 관한 연구)

  • Han, Seok-Man;Kim, Balho H.
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.9
    • /
    • pp.1531-1535
    • /
    • 2008
  • In the past vertically integrated power system, the power utility forecasted power demand and invested new power plants to keep a system adequacy. However, in the competitive electricity markets, a principle part of the capacity investment is market participants who decided the investment to maximize their profit. Especially, one of the main factors in their long-term decision making is the retrieval of fixed costs (construction costs). This paper presents the capacity payment in electricity power markets. The capacity payment (CP) in Cost Based Pool (CBP) is needed to recover fixed costs. However, CP in CBP was applied not only recovering fixed costs but also ensuring supply reliability. In order to operate harmonious power markets, pool needs reasonable CP mechanism. This paper analysis CP using capacity proportion and Reliability Pricing Model (RPM).

A Study on the Optimum Operational Control of Power System (전렬계통의 합리적 운용제어에 관한 연구)

  • 정재길;박영문
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.33 no.10
    • /
    • pp.410-422
    • /
    • 1984
  • This paper presents a new practical method for optimal active and reactive power control for the economic operation in electrical power system, and the programs are developed for digital computer solution. The major features and techniques of this paper are as follows: 1) The method is presented for finding the equivalent active power balance equation applying the sparse Jacobian matrix of power flow equation instead of using B constant as active power balance equation considering transmission loss, and thus for determining directly optimal active power allocation berween generator unitw satisfying the equality and inequality constraints. 2) The method is proposed for solving directly the optimum economim dispatch problem without using gradient method and penalty function for both active and reactive power control. As a result, the computing time are reduced and convergence characteristic is remarkably improved. 3) Unlike most of conventional methods which adopt the transmission loss as a objective function for reactive power control, the total fuel cost of themal power plant is adopted as objective function for both active and reactive power control. consequently, more reasonable and economic profit can be achieved.

Medical charges and the cold reality of surgeons of Korea (외과 수가와 외과의사의 현실)

  • Jung, Soo-Min
    • Journal of the Korean Medical Association
    • /
    • v.61 no.11
    • /
    • pp.638-642
    • /
    • 2018
  • Surgery is a very hands-on area of medical care, in that surgeons identify problems in patients' bodies and directly change them through operations. Therefore, it is not only necessary for surgeons to have a high level of expertise, but also to take considerable responsibility for the outcomes of each operation. However, surgery, which was once an object of envy, has long been a process to avoid, due to various circumstances, such as abnormal medical expenses in the medical field and social phenomena that avoids difficult work. It is unfortunate that medical professionals do not receive sympathy from others within the same medical field because of the general difficulties of the profession. The fundamental problem in this situation is the abnormal profit structure of the Korean medical system. Efforts by various related organizations will be needed to objectively evaluate the problems of the current medical insurance system and to make reasonable adjustments considering the difficulty, frequency, and resource-intensiveness of medical care.

TEN MANAGEMENT STRATEGIES TO AVOID CONSTRUCTION CONFLICTS

  • Nirmal Kumar Acharya;Young Dai Lee;Soo Yong Kim;Yong Duek Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.709-713
    • /
    • 2005
  • The conflict problems encountered in the construction projects led to prolonged delays in implementation, interruptions and sometimes suspension. This paper has described ten fundamental management principles to avoid conflicts in construction field and increase the productivity. They are: i) hire good (not cheap) construction professionals ii) set reasonable time and cost goals iii) recognize contractors and designers are in business to make profit iv) draft a clear contract document v) pick a suitable project delivery system vi) implement a front-end approach vii) accept construction project as a dynamic process viii) need of education and training of professionals ix) accountability and teamwork in construction site, and x) avoid negligence.

  • PDF

A Method for Estimating Retransmission Fee for Terrestrial Broadcasting Channels between Terrestrial Television Systems and Cable TV System Operators (지상파방송과 케이블방송 간에 지상파채널 재송신 대가 산정방안)

  • Moon, Myung-Sok;Lee, Song-Hee;Choi, Seong-Jhin
    • Journal of Broadcast Engineering
    • /
    • v.21 no.5
    • /
    • pp.689-703
    • /
    • 2016
  • A dispute over price for retransmitting terrestrial channels between Terrestrial Television Systems and Cable TV System Operator(SO)s has been underway up to now since 2007 and expected to last unless there is a measure of extraordinary countermeasures. Thus, in this paper, we present a scheme for calculating the reasonable price on retransmitting terrestrial channels. Re-transmission price calculation scheme is presented in two ways. One is to calculate the price for the extent to which Terrestrial broadcasters and Cable broadcasters contribute, and the other is to calculate the price for terrestrial channels retransmitted by applying the method of Cable TV PP program fee basis. In addition, on profit-sharing scheme and criteria for program fee we present two ways of subscription, which are flat sum system and fixed rate system.