Evaluation on Structural Stiffness and Grouting Efficiency of Concrete Track using Elastic Wave Tests (탄성파 기법을 이용한 콘크리트궤도의 구조강성 및 충전상태 평가에 관한 연구)

  • Lee, Il-Wha;Joh, Sung-Ho;Jang, Seung-Yup
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.55-64
    • /
    • 2009
  • Recently, concrete track is replacing ballast track for efficient and economic maintenance of track. It considerably offer less maintenance, a longer service life and reduced life-cycle costs. With the aim of achieving high-quality track construction work, of developing tools for quality assurance in new construction and for later technical inspection of material condition, a quality strategy has to be developed. For these purpose, NDT which is using the seismic wave has carried out in situ studies in the test construction section. The used NDT are SASW test, impact echo test and continuous impact echo test. The test is performed 5,353 times on 49 pre-cast concrete track panels to verify the stiffness structure and grouting efficiency of the track structure. To conclude, because of the non-homogeneous characteristic of concrete material. it is restricted to apply the elastic wave test at some aspect. However it is possible to acquisite a sufficient reliability about structural stiffness and grouting efficiency of concrete track.

Stress waves transmission from railway track over geogrid reinforced ballast underlain by clay

  • Fattah, Mohammed Y.;Mahmood, Mahmood R.;Aswad, Mohammed F.
    • Structural Monitoring and Maintenance
    • /
    • v.9 no.1
    • /
    • pp.1-27
    • /
    • 2022
  • Extensive laboratory tests were conducted to investigate the effect of load amplitude, geogrid position, and number of geogrid layers, thickness of ballast layer and clay stiffness on behavior of reinforced ballast layer and induced strains in geogrid. A half full-scale railway was constructed for carrying out the tests, the model consists of two rails 800 mm in length with three wooden sleepers (900 mm × 10 mm × 10 mm). The ballast was overlying 500 mm thickness clay in two states, soft and stiff state. Laboratory tests were conducted to investigate the response of the ballast and the clay layers where the ballast was reinforced by a geogrid. Settlement in ballast and clay, soil pressure and pore water pressure induced in the clay were measured in reinforced and unreinforced ballast cases. It was concluded that the effect of frequency on the settlement ratio is almost constant after 500 cycles. This is due to that the total settlement after 500 cycles, almost reached its peak value, which means that the ballast particles become very close to each other, so the frequency is less effective for high contact particles forces. The average maximum vertical stress and pore water pressure increased with frequency.

A Comparative of Ground Stress with Difference of the Fixed Point Loading and Moving Wheel Loading (모형실험을 통한 고정 및 이동하중 재하 방법에 따른 노반 변형거동 비교)

  • Choi, Chan-Yong;Shin, Eun-Chul;Eum, Ki-Young;Shin, Min-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.1
    • /
    • pp.49-56
    • /
    • 2011
  • In this paper, it was compared the characteristics of the stress and settlement that occur from a track on the ground using a model test and has quantitatively analyzed the difference based on stress path and effect of the rotation of principal stress. Under identical roadbed conditions, the settlement generated by moving wheel loads were found to be 6 times and 3 times larger than that from static loads and cyclic loads, respectively. The deviator stress affecting shear deformation and the length of stress path generated by moving loads were twofold or greater increase than those by static loads. Furthermore, the stress path generated by moving loads was approached more closely to Mohr-Coulomb failure criteria compared to that by static loads. Also, it was found that ballasted track was occurred about 60% of maximum stress at $40^{\circ}$ of the rotation angle of principal stress and was affected with rotation of principal stress with moving wheel loading condition.

Evaluation of the Status of Ballast on the Bridge Expansion f)int using HWAW method (HWAW방법을 이용한 고속철도 교량 상판 신축 이음부 도상 자갈의 이완상태 및 이완범위 평가)

  • Park, Hyung-Choon;Park, Jun-O;Jin, Nam-Hee;Noh, Hee-Kwan;Bae, Hyun-Jung
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.997-1002
    • /
    • 2009
  • The local loosening of ballast supporting railway tract cause a differential vertical tract settlement. In the bridge, the temperature change make bridge deck to contract and expand, and this movement cause local loosening of ballast on the bridge expansion joint. Therefore, the evaluation of the status of ballast on the bridge expansion joint is important for the track maintenance of the high-speed railway. In this paper, hwaw method was applied to evaluate the status of ballast on the bridge expansion joint. HWAW method is non-destructive test to evaluate 2-D shear wave velocity map along the railway. Shear wave velocity is directly related with status of ballast. In this research, hwaw method was applied two different types of bridges and determine the degree and the range of the ballast loosening caused by movement of the bridge expansion joint.

  • PDF

Evaluation of Subgrade State in the Gyeongbu High Speed Railway through GPR tests and Drilling Boreholes (GPR탐사와 시추조사를 통한 경부고속철도 노반상태평가)

  • Park, Jun-O;Min, Hyeong-Gi;Jeon, Il-Sik
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.984-996
    • /
    • 2009
  • When evaluating the general subgrade states such as geology, stiffness, underground water, compaction and deformation in the Gyeongbu high speed railway, some applicable testing methods should be selected because lots of trains are currently running. The applicable methods includes not only non-destructive tests such as GPR test, electricity resistivity test, MASW proving, but also standard penetration test (SPT), core test, elastic wave tomography through drilling boreholes and measurements using settlement measuring system or inclinometer, etc. In order for evaluating the subgrade states in the Gyeongbu high speed ralway, this study performed GPR test in several sections and drilling boreholes whose locations were chosen after comparing GPR test results and track maintenance history. Furthermore, the progress of subgrade deformations was analysed by comparing previous and this time GPR test results. The results of this study shall be used to understand the general states of currently operating Gyeongbu high speed railway.

  • PDF

Assessment of Stability of Railway Abutment Using Geosynthetics

  • Kim, Ja-Yeon;Kim, Ji-Hwan;Cho, Kook-Hwan
    • International Journal of Railway
    • /
    • v.9 no.1
    • /
    • pp.15-20
    • /
    • 2016
  • An approach section on an abutment is located between the soil embankment and the structure, which may cause an uneven surface due to different settlement between the abutment and the soil embankment. This study proposes a new type of wall which separates the abutment from the backfill material using mechanically stabilized wall. A new type of keystone which incorporates geotube and wire mesh is proposed and evaluated. Numerical analyses were performed to investigate the applicability of the proposed keystone type, which incorporates Geosynthetic. The maximum horizontal displacements along GRS wall faces, settlements at the top of pavement and track bed, and tensile forces applied on geotextiles under traffic loads were investigated. The results of the numerical analysis showed that the proposed wall can be used for highway and high-speed railway abutment.

Mixed Design of Grouting Materials for Settlement Restoration Using Micro Cement (마이크로시멘트를 이용한 침하복원용 그라우팅재료의 배합 설계)

  • Lee, Il-Wha;Lee, Sung-Jin;Yun, Won-Min;Park, Sung-Ki
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1786-1792
    • /
    • 2011
  • If the concrete track is settled excessively, it must be restored or reinforced immediately. Especially, reinforcement/restoration method should be applied without affecting on train operation. To deal with this problem, special equipment, process and material should be prepared. This paper suggest a special mixing ratio to restore the settled concrete track. Materials are classified the quick hardening mortar and the middle hardening mortar. The quick hardening mortar is used to restore the settled track and the middle hardening mortar is used to fill the void. These materials must have the appropriate gel time(1-40sec) and compressive strength($5kg/cm^2$). Various compounds is used and the micro cement is used as a main base.

  • PDF

Application on Geotextiles for the Roadbed Reinforcement of the Concrete Track Rehabilitation (콘크리트궤도 개량공사시 노반 보강을 위한 토목섬유의 적용)

  • Lee, Il-Wha;Jang, Seung-Yup;Han, Sung-Wu;Kim, Yong-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1802-1806
    • /
    • 2007
  • The most important factor is the roadbed bearing capacity at concrete track construction. Particularly, in case of rehabilitation, it is essential to secure the uniform roadbed stiffness to prevent the irregular settlement. In this study, reinforced effect of the geotextiles is investigated which is applied to concrete track rehabilitation. The geotextiles is installed two or three layers as the condition of the ground and structure. The reinforced effect of geotextiles is confirmed by the strain gage attached on the geotextiles surface.

  • PDF

Experimental Study on the Variation of Track Stiffness between Earthwork and Bridge (교량 토공 접속부에서 궤도강성변화에 대한 실험적 연구)

  • 나성훈;서사범;손기준;김정환
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.281-288
    • /
    • 2001
  • In order to evaluate the effect of impact load at support stiffness transition area, the field estimations are performed at the transition zone between earthwork and bridge on test operation of KTX. Due to differential settlement caused by the variations of track support stiffness, large impact forces are investigated. However, the measured values such as wheel load, rail stress, displacement and acceleration in the transition area shows that the stiffness changes in the transition area are not abrupt, and the stiffness in the infra track structure varies continuously. In this experimental study, the parameters influencing safety of transition area are not governed by partial or local stiffness because cumulative passing loads are not sufficient on test operation of KTX.

  • PDF

Effect of Unequal Settlement on Damage of Resilient Sleepers on Concrete Ballast (콘크리트도상 방진침목의 파손에서 부등침하가 미치는 영향)

  • Kim, Jin-Il;Lee, Jee-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.2 s.74
    • /
    • pp.80-88
    • /
    • 2006
  • In the present study damage behavior of resilient sleepers on concrete ballasts is analyzed. Cracks of resilient sleepers in a railway track system are concentrated on inside of blocks to which the tie bars are connected. Finite element analysis is performed by dividing a block into the straight section and the curved section according to the load condition of the resilient sleeper, and limited the interpretation within the range of resilience. In addition, the value of stress obtained from the interpretation was compared with the allowable stress of concrete to determine the safety. According to the result of numerical analysis, compared with the stress before unequal settlement, the tensile stress of the inside of the block increased significantly after the settlement considering the entire block, and the tensile stress of this part exceeded the allowable stress of concrete, so was undesirable in terms of safety. In reality, the arrangement of tensile stiffeners inside blocks connected to tie bars is improper in the design of resilient sleepers, and when unequal settlement occurs, tensile stress increases on this part and consequently causes cracking damage. It is necessary to arrange wire meshes or tensile reinforcing bars in a structurally safe way to reinforce the inside of blocks on which cracks are concentrated.