• Title/Summary/Keyword: railway track settlement

Search Result 114, Processing Time 0.034 seconds

A Study on Reinforcement Effectiveness for Railway Soft Roadbed by Using Geotextiles (토목섬유를 활용한 철도 연약노반에서의 보강효과)

  • Lee, Jin-Wook;Choi, Chan-Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1546-1553
    • /
    • 2005
  • In this study, geotextiles was applied on the selected track-bed, which is relatively economical and efficient way to prevent the problem of mud-pumping and settlement. Field testing sections from Mock-haeng to Dong-ryang in the Chung-buk lines in Korea were selected to investigate the state of track and roadbed. And three places were chosen among 1,700 spots where mud-pumping was frequently occurred and maintenance required. At the curved section with radius of 500m between Mock-haeng and Dong-ryang, we divided this testing site into 5 section and 4 different types of geotextile were installed and left the last section with no reinforcement. Total length of the test site was 200m and individual length of each site was 40 m. In order to understand the state and the strength of prepared roadbed, stiffness and physical properties of the roadbed soil were evaluated and analyzed. Also, after the installation, mud-pumping, settlement of elastic or plastic sleeper, failure of track, wheel-loads, lateral force and earth pressures were investigated.

  • PDF

A Study on Behavioral Characteristics of Track Roadbed according to Steel Pipe Press-in Excavation during Construction of Underground Railway Crossing

  • Kim, Young-Ha;Eum, Ki-Young;Kim, Jae-Wang
    • International Journal of Railway
    • /
    • v.6 no.2
    • /
    • pp.69-77
    • /
    • 2013
  • In this study, numerical analysis and model experiments were conducted to analyze behavioral characteristics acting on the track roadbed with excavation through steel pipe injection, a non-exclusive method of crossing construction under railroad as primary target. In model experiments that simulate injection excavation behaviors with an increase in the depth of soil cover, the upper displacement was measured by construction of the first and the second pipes in order to predict actual behaviors, and the behavior characteristics were verified through numerical analysis. The investigation results showed that surface displacement was smaller under the condition of higher soil cover. In the case of injecting two pipes, when the first pipe was injected, deformation of the surface increased linearly in both settlement and uplift experiments. However, when the second pipe was injected, the amount of change was found to be very small due to the relaxation and plastic zones around the first pipe. In addition, the results of numerical analysis on the same cross section with the model experiment found that the results of investigation into settlement ratio and volume loss were in very good agreement with those obtained by the model experiment.

Long-term Settlement of High Speed Railway Embankment Compacted under Dry/Wet Condition (고속철도 토공구간 쌓기 재료의 다짐함수비 조건에 따른 장기침하 특성)

  • Lee, Sung-Jin;Lee, Il-Wha;Lee, Jin-Uk
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1268-1277
    • /
    • 2008
  • Recently, the high speed railway comes into the spotlight as the important and convenient traffic infrastructure. In Korea, Kyung-Bu high speed train service began in about 400km section at 2004, and the Ho-Nam high speed railway will be constructed by 2017. The high speed train will run with a design maximum speed of 300-350km/hr. Since the trains are operated at high speed, the differential settlement of subgrade under the rail is able to cause a fatal disaster. Therefore, the differential settlement of the embankment must be controlled with the greatest care. Furthermore, the characteristics and causes of settlements which occurred under construction and post-construction should be investigated. A considerable number of studies have been conducted on the settlement of the natural ground over the past several decades. But little attention has been given to the compression settlement of the embankment. The long-term settlement of compacted fills embankments is greatly influenced by the post-construction wetting. This is called 'hydro collapse' or 'wetting collapse'. This wetting collapse problem for the compressibility of compacted sands, gravels and rockfills, has been recognized by several researchers. For this wetting settlement problem, we showed the test results carried out with 4 fill materials. These tests were performed under the condition that the fill materials were inundated at the first wetting. Subsequently, in this study, we investigated the long-term settlement characteristics of the fill materials under the repeated partial wetting and rising of the ground water table happend by rainfall.

  • PDF

Behaviors of Settlement for Transitional zone with Moving Wheel Loading (이동하중을 고려한 토공-접속구간 침하거동)

  • Choi, Chan-Yong;Lee, Jin-Wook
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.238-242
    • /
    • 2008
  • Transitional zones, one of the typical weak area of earthworks, require lasting a maintenance work due to a differential stiffness of substructures. It is very difficult problem that transition zone was perfectively prevented against a differential settlement. The transitional zone will deteriorate at an accelerate rate. This may lead to pumping ballast, swinging or hanging sleepers, permanent rail deformations, worn track components, and loss of surface and gauge. In this study, it is performed that settlement behavior in transitional zone was compared with small model test.

  • PDF

Response Analysis of Ground Vibration for Cutting and Embankment Transition Zone Structure (절성토 접속구조별 지반진동 응답특성)

  • Lee, Il-Wha;Yun, Won-Min;Choi, Won-Il;Hwang, In-Hwan;Hwang, Sung-Wook
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3195-3200
    • /
    • 2011
  • The vibration resulting from railway operation is transmitted through the track and line structure, ground movements to adjacent buildings. As these vibration is growing, there is occurred exaggerated forces and displacements of the track and line structure and it is causing the differential settlement. It is difficult to clarify the dynamic response characteristics of trackbed because of various environmental conditions. However, track irregularity be affected by ununiformed bearing capacity and its dynamic response, study for dynamic response characteristics is required to investigate the cause of track irregularity and countermeasure. This study was intended to evaluate the numerical analysis which exam the response analysis characteristic of ground vibration by shape of cutting and embankment transition zone. The original method of analysis were have to examine variables such as directions, angles, drain conditions, linear conditions. However, In the analysis there were to consider the effect of moving loads according to directions of cutting and embankment transition zone.

  • PDF

Construction and Evaluation of the Paved Track on Test Line (도시철도 시험선 구간에서의 포장궤도 시험부설 및 성능평가)

  • Lee, Il-Wha;Shim, Jae-Gyu;Lee, Choon-Ho;Park, Kyun-Seo;Ryu, Kyoung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1115-1120
    • /
    • 2007
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure considering various conditions. In this study, the CMP track is constructed(30m) on a test line and the track performance tested by running train to evaluation the capability and workability. The track performance are tested to confirm the vibration acceleration of the car body, wheel and track, accumulated settlement, track irregularity and crack of surface.

  • PDF

Development of a Numerical Method of Vertical Train/Track Interaction in the Track Section with Hanging Sleepers (뜬침목구간에서 차량/궤도 상호작용 수치해석기법 개발)

  • Yang, Sin-Chu;Lee, Jee-Ha
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.3
    • /
    • pp.251-256
    • /
    • 2012
  • Hanging sleepers are frequently observed in the ballasted track with the rail of high rigidity. These hanging sleepers at the high speed line could cause such large dynamic force compared to those at the conventional line. This dynamic force would, in turn, deteriorate train running stability as well as riding comfort, and accelerate irregularity of track and failure of track materials, leading to a sharp increase in track maintenance cost. When the wheel-rail contact spring exhibits nonlinear behavior and some components of the system like hanging sleeper exhibit bi-linear behaviors, an effective analytical method is proposed for train-track interactions. The verification of the present method is carried out comparing numerical results by the present method and those by Ono's method of RTRI.

Analytical evaluation of the influence of vertical bridge deformation on HSR longitudinal continuous track geometry

  • Lai, Zhipeng;Jiang, Lizhong;Liu, Xiang;Zhang, Yuntai;Zhou, Tuo
    • Steel and Composite Structures
    • /
    • v.44 no.4
    • /
    • pp.473-488
    • /
    • 2022
  • A high-speed railway (HSR) bridge may undergo long-term deformation due to the degradation of material stiffness, or foundation settlement during its service cycle. In this study, an analytical model is set up to evaluate the influence of this long-term vertical bridge deformation on the track geometry. By analyzing the structural characteristics of the HSR track-bridge system, the energy variational principle is applied to build the energy functionals for major components of the track-bridge system. By further taking into account the interlayer's force balancing requirements, the mapping relationship between the deformation of the track and the one of the bridge is established. In order to consider the different behaviors of the interlayers in compression and tension, an iterative method is introduced to update the mapping relationship. As for the validation of the proposed mapping model, a finite element model is created to compare the numerical results with the analytical results, which show a good agreement. Thereafter, the effects of the interlayer's different properties of tension and compression on the mapping deformations are further evaluated and discussed.

A Study on the tension of Geogid on Pile-supported Construction Method (성토지지말뚝공법 중 섬유보강재의 인장력 검토에 관한 연구)

  • Moon, In-Ho;Park, Jong-Gwan;Lee, Il-Wha
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.905-917
    • /
    • 2008
  • Road or Railway construction over soft ground is needed to be considered on secondary consolidation which will be caused differential settlement, lack of transport serviceability, higher maintenance cost. Especially for the railway construction in the second phase of Gyung-Bu or Ho-Nam high speed railway, concrete slab track has been adapted as a safe and cost effective geotechnical solution. In this case controlling the total settlement under the tolerance is essential. And pile supported geogrid reinforced construction method is suggested as a solution for the problem of the traditional method on soft soil treatments. Pile supported geogrid reinforced construction method consists of piles that are designed to transfer the load of the embankment through the compressible soil layer to a firm foundation. The load from the embankment must be effectively transferred to the piles to prevent punching of the piles through the embankment fill creating differential settlement at the surface of the embankment. The arrangement of the piles can create soil arching to carry the load of embankment to the piles. In order to minimize the number of piles geogrid reinforced pile supported construction method is being used on a regular basis. This method consists of one or more layers of geogrid reinforcement placed between the top of the piles and the bottom of the embankment. This paper presents several methods of pile supported geogrid reinforced construction and calculation results from the several methods and comparison of them.

  • PDF

Application of Geotextile to ensure the Motor Pouring Ability for Paved Track (포장궤도 모르터 충진성능 확보를 위한 토목섬유의 적용)

  • Lee Ho-Ryong;Park Jong-Kyan;Hwang Seon-Keun;Lee Il-Wha
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.836-841
    • /
    • 2005
  • As gravel roadbed is gradually turn down by repetitive loading of train, lasting work for maintenance and management of track is necessary to reduce the settlement of roadbed and the deterioration of track. Despite of above weak point, gravel roadbed has become a basic structure of roadbed at the present time. But request for new structure of roadbed is recently presented to settle an increased transportation capacity of track, and to solve a shortage of the labor to handle maintenance work of track. Therefore, we begin to research about maintenance-free roadbed like paved track from two years ago. In this study, a series of tests were performed to clarify the characteristics of strength and permeability of concrete specimen, which is the upper part of paved track injected by cement mortar, by type of geotextile and finally to give a basic data for application of geotextile to the lower part of paved track.

  • PDF