• Title/Summary/Keyword: railway site

Search Result 311, Processing Time 0.028 seconds

Introduction of Intelligent fire-disaster Surveillance System for Subway Station (도시철도 역사 지능형 화재감시시스템 구축방안 연구)

  • Shin, Jeong-Ryol;An, Tae-Ki;Jeon, Bo-Ik;Kim, Gab-Young;Kim, Hyung-Min;Yun, Byeong-Ju
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.457-465
    • /
    • 2009
  • Subway system including light-rail transit system is the representative public urban transportation. Accordingly, Nothing is more important than the safety operation as well as passengers' convenience. Due to the fire disaster of Daegu subway on 2003, more strict regulations of detecting fire and of conducting on emergency circumstances. However, regardless of this improved management, it was reported that installations of lots of fire-detection facilities may be harm than good to operate subway system due to frequent malfunction of some fire-detection facilities. It may cause mis-alarm for fire and induces abnormal operation of subway due to the strict regulation; the train shall be stopped on emergency circumstances. Therefore, in this paper, new scheme on surveiling breaking-out-of fire in the station is suggested with new IT technologies, Wireless Sensor Network(WSN) and CCTVs. which were integrated with an intelligent software. This intelligent system enables to surveil breaking-out-of fire in real time through sensor network technology and watch the emergency site on CCTV as well. Through this system, subway organizers could cope with the emergency circumstance rapidly as well as judge precisely whether fire breaks out or not.

  • PDF

The Continuously Underwater Tunnelling Methods by Incremental launching Methods (연속압출공법(ILM)을 이용한 수저(水底)터널공법에 관한 연구)

  • Jung, Byung-Ryul;Ryu, Dong-Hun;Kim, Joon-Mo
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.28-41
    • /
    • 2009
  • We know the several construction methods for underwater tunnel, but properly submerged concrete box type tunnel was mostly good structure stability and mostly shot length of tunnels. Submerged box type tunnel was buildup the unit segments in dry dock or ship yard by 10 to 20meters. The submerged box was composed with segments was join each together. It was installing the gate and waterproofing the coupling the front hull of a box. The complete submerged box rise up to the surface water, tow in the submerged box by tugboat, going to the destination of tunnel construction site. Beforehand dredge up soil at the bottom of a underwater, sinking the submerged box, connection together complete submerged box in underwater. The research and development ILM tunneling method is receiving careful study. Biggest weakness in submerged concrete box type tunnel was pressure waterproofing, box to box connecting, complete submerged boxes navigation and installation, after operation the submerged tunnel and management concrete box structure. It was positive evidence in submerged concrete box type tunnel. We make a practical application of the principle "the ILM tunneling method in underwater construction methods."

  • PDF

Estimation of Displacement Responses from the Measured Dynamic Strain Signals Using Mode Decomposition Technique (모드분해기법을 이용한 동적 변형률신호로부터 변위응답추정)

  • Kim, Sung-Wan;Chang, Sung-Jin;Kim, Nam-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.109-117
    • /
    • 2008
  • In this study, a method predicting the displacement responseof structures from the measured dynamic strain signal is proposed by using a mode decomposition technique. Dynamic loadings including wind and seismic loadings could be exerted to the bridge. In order to examine the bridge stability against these dynamic loadings, the prediction of displacement response is very important to evaluate bridge stability. Because it may be not easy for the displacement response to be acquired directly on site, an indirect method to predict the displacement response is needed. Thus, as an alternative for predicting the displacement response indirectly, the conversion of the measured strain signal into the displacement response is suggested, while the measured strain signal can be obtained using fiber optic Bragg-grating (FBG) sensors. To overcome such a problem, a mode decomposition technique was used in this study. The measured strain signal is decomposed into each modal component by using the empirical mode decomposition(EMD) as one of mode decomposition techniques. Then, the decomposed strain signals on each modal component are transformed into the modal displacement components. And the corresponding mode shapes can be also estimated by using the proper orthogonal decomposition(POD) from the measured strain signal. Thus, total displacement response could be predicted from combining the modal displacement components.

  • PDF

Development of AV2SWMM Module for Bimodal Tram Disaster Management System (바이모달 트램 재해관리 시스템 입력자료 구축을 위한 AV2SWMM 모듈 개발)

  • Kim, Jong-Gun;Park, Young-Kon;Yoon, Hee-Taek;Park, Youn-Shik;Jang, Won-Seok;Park, Jun-Ho;Lim, Kyoung-Jae
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.143-146
    • /
    • 2008
  • With unexpected torrential rainfall, flash flooding is occurring frequently and its impacts are tremendous. Thus proper natural disaster management plans are required. The disaster management system of the Bimodal tram utilizes the SWMM as a core engine to simulate runoff and urban sewer networks for flooding simulation. To develop the efficient Bimodal tram disaster management system, very detailed subcatchment boundaries and flow networks have to be developed in a GIS data format. Thus the objective of this study is to develop ArcView GIS based module (AV2SWMM) for easy preparation of model input for the tram disaster management system. With the AV2SWMM module, very detailed subcatchment boundaries and flow networks can be developed for accurate simulation of flash flooding at the study site, which were not/hardly possible with SWMM 5.0 interface. The AV2SWMM can be used in developing accurate model input for other regions where the Bimodal tram system is expected to be introduced.

  • PDF

The Blasting Pollution Effects Estimation & The Excavation Construction Case Study Of Personal Museum On Tunnel (산악터널에 인접한 개인 박물관의 발파공해 영향평가 및 굴착 시공사례)

  • Kwon, Soon-Sub;Lee, Myong-Choul;Park, Tae-Soon;Jeong, In-Choul;Lee, Hyun-Gu
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.127-132
    • /
    • 2004
  • The third double-track construction part of work, called Chung Ang Railroad line(Deok-So$\∼$Won-Ju) is in progress and the personal museum located 330m from the starting point of Pal-Dang Tunnel(length=4,470m) line in the canyon is to be effected by rock blasting during the tunnel excavation work, especially museum articles and building itself. This paper is the example of application suitable tunnel rock blasting pattern for excavation after the case study about the investigation and analysis of rock blasting noise pollution during tunnel excavation work. The museum is a three-story building, RC concrete structure and is located 17m from the top of the tunnel, in the center of the double-track line. Comparing estimate vibration frequency with site vibration one, it can be verified the reasonable rock blasting noise pollution as improving the application of tunnel excavation rock blasting pattern. The above pattern has been selected economically and effectively and applied to our construction field.

  • PDF

A Study on the Distributed Control System and Application (분산제어시스템의 구축과 응용사례에 관한 연구)

  • 윤형득;신현식
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2001.10a
    • /
    • pp.552-555
    • /
    • 2001
  • From the dissertation which it sees micro it is strong with the technical development which the computer and communication field is quick and efficiency improvement and control LAN (Local Area Network) this utility anger becomes with the pliability regarding a system construction to come to be high, central processing unit (CPU) function it separates especially and the LAN communication railway line (Data way) it uses and the controller royal tomb of process disperses, the information control and watch and operation fabrication function composes an anger making whole system intensively development background and application process and the right season of the dispersion control system which plans a reliability improvement, war potential and environment, possibility control, From industrial site of the petrochemistry back application and it investigated the dispersion control system which is applied to observe in many sidedness and until course of development of report hereafter dispersion control system it tried.

  • PDF

Electrical Strength Analysis of Toughened Glass Stem Insulator for Electric Railways (전기철도용 유리애자 전기적 강도 해석)

  • Jung, Jong-Wook;Jung, Jin-Soo;Kim, Young-Seok;Kim, Sun-Gu
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.06a
    • /
    • pp.263-263
    • /
    • 2008
  • This paper describes the electrical strength of a toughened glass stem insulators employed for electric railways. The broken glass stem insulators for comparison were taken at site. According to the international standards, electrical strength tests with 60[Hz] voltage and with impulse voltage were carried out to them under dry and wet condition and the results were corrected by considering the temperature and humidity factors. Based on the experimental results, the electrical strength of broken glass stem insulators was compared with those of sound ones and surface flashover characteristics were also discussed. As a result, it was confirmed that the electrical discharge is formed by bridging each end of the insulator shell. The experimental results are expected to be utilized as data for electrically identifying the failure causes of glass insulators.

  • PDF

Analysis of the acceleration of KHST prototype on the high speed test line (한국형 고속전철의 진동가속도 시험 연구)

  • Park Chankyounn;Kim Youngguk;Kim Seogwon
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.567-573
    • /
    • 2003
  • Korean High Speed Train (KHST) has been tested on high speed line in JungBu site since it was developed in 2002. The data acquisition system was developed to accomplish successfully this on-line test for proving the dynamic Performance of KHST. This system was consist of the personal computers based on National Instrument PXI modules and the test programs based on Labview 6i. This paper shows that this system is efficient to acquire the test data through the multi-channels connected the accelerometers which located in long distance places and flexible to change and add channels for data acquisition. The dynamic analysis of an on-line test is very complicate because the environmental conditions, as examples radius of curve, inclination of the track, tunnels, bridges, and so forth, and running conditions, as examples driving, braking, the number of working motors, and so forth, have an effect on the results. Therefor, the analysis method is important and this paper proposes the efficient procedure graphically, showing the proposed method simplify the accelerations of 5th bogie frame acquired during the on-line test for KHST.

  • PDF

A Case Study for Rock Mass Classification using Geophysical Exploration (물리탐사에 의한 터널구간의 암반등급 산정)

  • 김기석;권형석;김종훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06b
    • /
    • pp.119-137
    • /
    • 2003
  • Electrical resistivity is one of physical property of the earth and measured by electrical resistivity survey, electrical resistivity logging and laboratory test. Recently, electrical resistivity Is widely used In determination of rock quality in road and railway tunnel design. To get more reliable rock quality data from electrical resistivity, it needs a lot of test and study on correlation of resistivity and rock quality. Firstly, we did rock property test In laboratory, such as uniaxial compressive strength(UCS), P wave velocity, Young's modulus and electrical resistivity. We correlate each test results and we found out that electrical resistivity has exponentially related to UCS and P wave velocity and linearly related to Young's modulus. And we accomplished electrical resistivity survey in field site and carried out electrical resistivity togging at In-situ area. Also we performed rock classification, such as RQD, RMR and Q-system and we correlate electrical resistivity to rock classification results. We found out that electrical resistivity logging data are highly correlate to RQD, Q and RMR. Also we found out that electrical resistivity survey data are lower than electrical resistivity logging data when there are faults or fractures. And it cause electrical resistivity survey data to lowly correlate to RQD, Q and RMR.

  • PDF

Selection of Optimum Support based on Rock Mass Classification and Monitoring Results at NATM Tunnel in Hard Rock (경암지반 NATM 터널에서 암반분류 및 계측에 의한 최적지보공 선정에 관한 연구)

  • 김영근;장정범;정한중
    • Tunnel and Underground Space
    • /
    • v.6 no.3
    • /
    • pp.197-208
    • /
    • 1996
  • Due to the constraints in pre site-investigation for tunnel, it is essential to redesign the support structures suitable for rock mass conditions such as rock strength, ground water and discontinuity conditions for safe tunnel construction. For the selection of optimum support, it is very important to carry out the rock mass classification and in-situ measurement in tunnelling. In this paper, in a mountain tunnel designed by NATM in hard rock, the selectable system for optimum support has been studied. The tunnel is situated at Chun-an in Kyungbu highspeed railway line with 2 lanes over a length of 4, 020 m and a diameter of 15 m. The tunnel was constructed by drill & blasting method and long bench cut method, designed five types of standard support patterns according to rock mass conditions. In this tunnel, face mapping based on image processing of tunnel face and rock mass classification by RMR carried out for the quantitative evaluation of the characteristics of rock mass and compared with rock mass classes in design. Also, in-situ measurement of convergence and crown settlement conducted about 30 m interval, assessed the stability of tunnel from the analysis of monitoring data. Through the results of rock mass classification and in-situ measurement in several sections, the design of supports were modified for the safe and economic tunnelling.

  • PDF