• Title/Summary/Keyword: railway site

Search Result 311, Processing Time 0.031 seconds

Development of Dynamo Algorithm Based on BIM for Direct Sunlight Impact Analysis of Tunnel Outlet (BIM 기반 터널 출구부 직광영향검토 Dynamo 알고리즘 개발)

  • Kwon, Bareum;Yeom, Chunho
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.41-51
    • /
    • 2022
  • BIM was introduced under the leadership of public institutions, and projects such as road, railway, and site creation, including BIM tasks, are currently being ordered. In addition, as the Ministry of Land, Infrastructure and Transport(MOLIT) is pushing for the full design of BIM, public institutions under its jurisdiction are also pushing for the full design of BIM. Full design of BIM means that all designs are done with BIM. Public institutions' BIM guidelines only require BIM deliverables, and there is a limited direction for the BIM design process to respond to traditional design approaches. Therefore, it is necessary to develop a BIM-based design process corresponding to the full design of BIM.

An innovative geometry control method for short-line match precast segmental bridges

  • Xuzheng Liu;Huibing Xu;Jianyang Yu;Wei Quan
    • Advances in concrete construction
    • /
    • v.16 no.2
    • /
    • pp.79-89
    • /
    • 2023
  • The occurrence of unexpected horizontal offset in the instrument or target will result in accumulated horizontal deviation in segment alignment with traditional short-line match method. A geometry control method, the four-point method, is developed for precast segmental bridges to avoid the influences of unexpected horizontal offset. The concept of the four-point method is elucidated. Furthermore, the detailed instruments and instructions are introduced. Finally, the four-point method is validated through a practical engineering application. According to the survey data, after short-line match precast construction, the vertical deviations on both sides vary between -5 mm and 5 mm in almost all segments, and the horizontal deviations vary between -4 mm and 4 mm in all segments. Without on-site adjustment, the maximum vertical and horizontal closure gaps are 12.3 and 26.1 mm, respectively. The four-point method is suggested to alleviate the issues associated with relatively poor soil conditions in casting yard.

Accident Risk Consequences Analysis for Operating a Hydrogen Refueling Station in Urban Railway Site (도심 내 철도부지 수소충전소 운영을 위한 사고 위험 영향 분석)

  • Jae Yong Lee;Deokkyu Youn;Chul-Ho Lee;Jaeyoung Lee
    • Journal of the Korean Institute of Gas
    • /
    • v.27 no.4
    • /
    • pp.70-77
    • /
    • 2023
  • In response to climate change, each country is proposing a goal to reduce greenhouse gases in its energy supply and demand plan, and the use of hydrogen gas is a topic that is always prioritized as an energy resource for implementation. A popular way to use this hydrogen gas is the use of hydrogen fuel cell vehicles, and expansion of hydrogen charging stations is essential for using these hydrogen fuel cell vehicles. However, there are several limitations to the expansion of hydrogen refueling stations, the most representative of which is resident acceptance. Most of the hydrogen charging stations currently built in Korea are located in the outskirts with low population density, so the inconvenience to hydrogen fuel cell vehicle users has not been resolved, and as a result, there has been no progress in the spread of hydrogen fuel cell vehicles. In this paper, we analyzed the consequences of accident damage to determine the risks of constructing a hydrogen charging station on a railroad site frequently used by citizens. The target hydrogen charging station site was a railroad depot in Busan, and there are trains, national highways, and commercial facilities around this site. Assuming the worst-case scenario, we would like to consider the safety of the hydrogen refueling station site by analyzing the area affected by the accident and its consequence.

Applicability of IGM theory Partial Drilled Shaft constructed on Granite Rocks (화강풍화암에 시공된 부분현장타설말뚝의 IGM이론의 적용성)

  • Ahn, Tae-Bong
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.5
    • /
    • pp.379-385
    • /
    • 2013
  • In this study, partial drilled shafts (Bottom Cast-in-place Concrete pile) were applied to the pilot test site to ensure the bearing capacity; we used the skin friction force in the IGM to analyze the feasibility of the application of IGM theory. The soil characteristics were analyzed in cohesive, non-smear, and smooth conditions for the application of the IGM theory via geotechnical investigation and measurement of the disturbance and surface roughness. Static load and load transfer tests were conducted to calculate the allowable bearing capacity and the skin friction force by depth. The skin friction force increased with increase in the depth and standard settlement, showing a very high correlation. In addition, because the unconfined strength ($q_u$), which is the most important parameter in the cohesive IGM, cannot be measured in a weathered granite area, the static load and load transfer test results and the N value were used to obtain $q_u$.

The Strategy for Interconnection Branch Line Construction used Optimization Program (최적화 기법을 적용한 효율적인 철도 연결선 구축 전략)

  • Kim, Yong-seok;Kim, Sigon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.853-858
    • /
    • 2019
  • One of the methods which can enhance the efficiency of railroad network is construction of interconnection branch line for several route to share one railway. In Korea, this method already has been implemented or excuted as project level. This study suggests a network design model and a solution algorithm to choice most proper site to construction it and determine the priority of branch lines which can be considered in planning level, not project level. The model is a non-linear optimization program which minimize total cost-construction cost, operating cost and passengers' travel cost. The decision variables are a binary variable to explain whether construction or not and its direction and a integer variable of the frequencies of travel routes. The solution algorithm-problem solution and route choice and also the result of implementation for example network are suggested. This result can be more advanced after application in real network and calibration of parameters.

Investigation on the Temperature Characteristics of CWR for the Climate Change (기후변화에 대비한 장대레일 온도특성 연구)

  • Choi, Jin-Yu;Lee, Gyu-Sei;Bae, Hyun-Ung;Park, Beom-Ho;Lim, Nam-Hyoung
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.2
    • /
    • pp.179-185
    • /
    • 2010
  • In order to secure safety for the buckling and fracture of continuous welded rail and improve the efficiency of maintenance work, it is very important that grasp the characteristics of rail temperature. Recently, the maximum air temperature in summer season rises gradually and the minimum air temperature in winter season is decreasing gradually due to the climate change. Therefore, these phenomenon influences in the change amount of yearly rail temperature and can cause change of laying and maintenance temperature. In this study, actual measurement of rail temperature including climatic factors is carried out by constructing the temperature and climate measurement system as realistic as possible. Through the intensive investigation of actual data, it is founded that the existing prediction formulas for rail temperature may be used only in certain climatic conditions (certain combination of climatic factors). It may be more reasonable that the rail temperature considering actual climatic factors in site is predicted on probabilistic approach.

A Study on the Verification of Heavy Overhaul Maintenance Allowances for the Maintenance Shop (시뮬레이션과 BPR을 응용한 Layout 기반의 철도차량기지 중정비 검수 여유율 검증)

  • Choi, Sung-Hwan;Lee, Hi-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.9-15
    • /
    • 2010
  • When designing the size of a heavy maintenance shop for rolling stock, it is required to arrange buildings and facilities in the minimum site so as to improve the maintenance efficiency. However, the fluctuation rate (hereinafter "allowance rate") on which factors such as service and maintenance fluctuation should be applied when estimating the size of the maintenance shop has been used without verification. The objective of the study is to calculate a reasonable allowance rate and to review its appropriateness through the analysis of the facilities layout and process simulation to absorb the above elements into the staying time in the heavy maintenance shop. Since the working time, in this study, is assumed to be average working time, 10~20% was given to the standard deviation of working time in consideration of difference between workers, and possible allowance rate was drawn by analysis of the simulation results. In the future, it is required to optimize the size of the shop by applying appropriate allowance rate through scientific review of such factors as O&M plan, R/S reserve rate, capability of the shop, outsourcing rate, standard work amount, and so on.

RF Characteristics Analysis of Smart Braille Block for Location Identification in Subway Station (지하 철도역사에서 위치확인을 위한 스마트 점자블럭의 RF 특성 분석)

  • Hwng, Jong-Gyu;Kim, Kyung-Hee;An, Tae-Ki
    • Journal of IKEEE
    • /
    • v.24 no.2
    • /
    • pp.378-384
    • /
    • 2020
  • The location information of the people or mover is essential for supporting various smart mobility services in railway stations which are mostly underground. For this purpose, a smart braille block is proposed to identify the location of the mover of the people. In this paper, the frequency characteristics of each material of the upper and lower parts of the braille block are analyzed to examine the appropriate materials for railway history. In addition, the guidelines for actual manufacturing were derived by analyzing the separation distance between two RF sensors in the smart braille block. As a result of analysis through the characteristic analysis in this paper, after selecting the material suitable for the construction site when the smart braille block is applied, the performance change of the RF system, especially the antenna that greatly influences the RF performance, must be reviewed in advance. It seems to have to be applied after checking through.

Comparative Study on Ride Comfort and Optimum Horizontal Curve Conditions for Superimposition of Vertical and Horizontal Curve (종곡선/평면곡선 경합여부에 따른 최적평면선형조건 및 승차감 비교 분석)

  • Um, Ju-Hwan;Choi, Il-Yoon;Yang, Sin-Chu;Lee, Il-Hwa;Kim, Man-Cheol
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.6
    • /
    • pp.589-594
    • /
    • 2010
  • Superimposition of horizontal and vertical curves may hamper the ride comfort and running stability of train and largely affect the maintenance costs. However, in many cases, it is not easy to make a track alignment plan because of the geographic conditions or undesirable environmental factors. In this paper, a comparative study on the effect of superimposition of vertical and horizontal curve on the ride comfort and optimum horizontal curve conditions was performed. That is, optimal cant and ride comfort analysis with and without a vertical curve superimposed on the horizontal curve were evaluated. Also the superimposition effect on ride comfort and alignment conditions in high speed zone were evaluated. From the analysis results, it was found that the ride comfort is similar to that at the only horizontal curves when applying the compensation cant for the superimposed site.

A Compaction Control Procedure of Railway Trackbed Fills Using Elastic Waves (탄성파를 이용한 철도노반의 다짐관리 방안)

  • Park, Chul-Soo;Park, In-Beom;Oh, Sang-Hoon;Kim, Hak-Sung;Mok, Young-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1427-1439
    • /
    • 2008
  • The quality of track-bed fills of railways has been controlled by field measurements of density (${\gamma}_d$) and the results of plate-load tests. The control measures are compatible with the design procedures whose design parameter is $k_{30}$ for both ordinary-speed railways and high-speed railways. However, one of fatal flaws of the design procedures is that there are no simple laboratory measurement procedures for the design parameters ($k_{30}$ or, $E_{v2}$ and $E_{v2}/E_{v1}$) in design stage. A new quality control procedure, in parallel with the advent of the new design procedure, is being proposed. This procedure is based upon P-wave velocity involving consistently the evaluation of design parameters in design stage and the field measurements during construction. The key concept of the procedure is that the target value for field compaction control is the P-wave velocity determined at OMC using modified compaction test, and direct-arrival method is used for the field measurements during construction. The procedure was verified at a test site and the p-wave velocity turned out to be an excellent control measure. The specifications for the control also include field compaction water content of $OMC{\pm}2%$ as well as the p-wave velocity.

  • PDF