• Title/Summary/Keyword: railway site

Search Result 311, Processing Time 0.028 seconds

A Study on the Construction Work to Reduce Vibration Effect to the Structure (건축물에 영향을 미치는 열차하중에 대한 방진공사에 관한 연구)

  • 김상용;윤지언;박태하;강경인
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.27-32
    • /
    • 2004
  • Recently, the expansion of social infrastructures and urban redevelopment, the construction works have been a rapidly increase. The subway's noise and vibration are on a continuously increasing status in its importance as by the industrial and cultural development process. Nevertheless, in our country, adequate alternative idea for the construction noise and vibration are not yet established. In this point, the purpose of this study is to know the vibration effect to the structure. This study was used to determine the standard of vibration and the way of losing vibration. The case of construction site is a good example. The data of this study was obtained by a construction company in Korea. Vibration effect could cause structural problems and affect human mental state. The results of this study are as follows; check the vibrating point, determine the suitable limit of vibration, make a good plan and construction.

  • PDF

A Study on the Evacuation Time of the Subway Station (지하역사 승강장 피난시간 분석 연구)

  • Shin, Min-Jung;Kim, Jin-Ho;Kim, Dan-Hee
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.214-220
    • /
    • 2011
  • As the number of subway user increases, not only interests in safety increase but also interests in evacuation for a conflagration expand after 'Daegu Subway Fire Disaster' took place. It is necessary to revise the standard of evacuation time and guidelines to guarantee safety of station and platform considering changes in subway environments caused by construction of the deeply underground subway station. Hence this study investigates the current status of the evacuation time of respective station through a site investigation and the results of this study may be utilized as a basic material to calculate an appropriate evacuation time.

  • PDF

Study on the improvement of Memory-device unification for Point-switch machine (선로전환기용 기억쇠 단일화 개선방안 연구)

  • Lee, Nam-Il;Ko, Yang-Ok;Jung, Ho-Hung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1440-1444
    • /
    • 2011
  • Memory-device is one of the auxiliary components of point-switch machine; connecting front-rod and tongue-rail. The right side and left side of memory-device are different from each other. When there would be a derailing accident of rolling stock or motor-car, the memory-device properly bends and protects the internal of point-switch machine. Memory-device is one of the important site maintenance spare parts. Memory-device for each of right and left side should be secured so that they can be installed on correct side during an exchange work. This study suggests the development of memory-device with different left and right side and the performance test of it. The study intends to contribute in the convenience improvement of maintenance by improving the unification of memory-device.

  • PDF

SMRT STnF Construction and Performance (서울특별시도시철도공사 STnF 구축과 성과)

  • Lee, Jong-Kye;Park, Jong-Hun;Kim, Ki-Chun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2573-2580
    • /
    • 2011
  • SMRT(Seoul Metropolitan Rapid Transit Corporation) changed PC-oriented office system to Smart-Phone oriented mobile office system(STnF: SMRT Talk & Flash), and provided smart phone to all staffs. STnF make it possible not only voice communication between staff, but also to input and inquiry all kind of information related to work(ex: Facility maintenance, Rolling Stock management, office management, Finance, human resource etc.) based on smart phone. STnF conquers the limitation of time and space. All staffs can commute to the site directly to reduce moving time and to share information between staffs, so SMRT improve speed and reliability of work by making a quick decision and action on the spot. After introduction of STnF, within 1 year, the equipment failure ratio fell to 47%. Mobile office system reduced and level-off the step of approval. so enhanced civil customer service. Quantification and scientific movement of work make it fast evolution and development. These business improvement make it possible to put more outstanding manpower on new business and R&D project, and this contributes to company's management effectiveness.

  • PDF

Characteristics of the Bimodal Tram in terms of Traffic Engineering (교통공학적 측면에서 바이모달 트램의 특성 연구)

  • Yoon, Hee-Taek;Park, Young-Kon;Chang, Se-Ky
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1760-1765
    • /
    • 2011
  • Recently, a variety of new transportation systems have been developed or introduced, but there has been a lot of confusion in the selection process of systems because there is no such domestic cases, and a lack of information on the systems. It does not make sense to analyze the strengths and weaknesses of the systems in a single frame because each system has different characteristics and purposes. It is important to compare the relative values of the systems considering the status of the project site, transport demand, costs, and environmental aspects of cities. In the present paper, the operational system and infrastructure technologies of the bimodal tram developed in Korea were investigated. Based on this, the values for the bimodal tram was compared with similar new transportation systems through several practice cases. It is expected to promote in the practical use of the bimodal tram through this study.

  • PDF

A Study on the Market Conditions and Foreacast of housing and office market relating with Station Area Development (역세권에 연계한 주거.업무시설 시장현황 및 전망 연구)

  • Sun, Sang-Hun;Park, Jong-Koon;Kim, Ju-Young;Kim, Eun-Ju
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1766-1784
    • /
    • 2011
  • In the past, station-area development projects were proceeded for modernizing the station facilities and improving the customer's convenience facilities by attracting private financing. But the site of station-are a development has a limitation that limits of benefits comparing with initial cost and absence of collateral by constructed the national property. For the advancing business value, merchandising facilities were adopted. There were many problems like coming the loss of city development opportunities. Now, station-area developments are considered the station and city plan. so, they are rapidly rised up the life in the station, need of making cultural space, improvement efficiency, combination and connectivity of transportation system and need of journey to Work Distance. Accordingly, this study suggests the station-area development projects by analysis of market conditions and forecast about housing and office that meets the trend of station-area development and secures feasible business value.

  • PDF

Evaluation of Degree of Compaction of Railroad Trackbed Fills Using Elastic Wave Velocities (탄성파 속도를 이용한 철도 토공노반의 다짐도 평가)

  • Kim, Hak-Sung;Jung, Young-Hoon;Gang, Dong-Yeob;Lee, Seong-Hyeok
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1650-1658
    • /
    • 2011
  • The quality control of compaction fills has been commonly performed via the field density measurement and plate load tests. However, the engineer frequently encounters difficulties in actually controling the quality due to the uncertainty in the field density measurement as well as the plate load tests. To overcome these difficulties, Park et al. (2009) proposed an alternative quality control method based on the measurement of the compressive wave velocities. In this study, the compressive wave velocities measured in the full-scale model test site were analyzed. Direct arrive seismic tests were performed after the completion of each trackbed layer. To identify a relationship between elastic wave velocities and degree of compaction, laboratory compaction tests were conducted.

  • PDF

A Study on ground behavior of shield TBM lunching area during xcavation (Shield TBM 발진부 굴착에 따른 지반거동에 관한 연구)

  • O, Tae-Sang;Kim, Bae-Sik;Sin, Han-Cheol;Kim, Sang-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.353-364
    • /
    • 2011
  • This paper presents the ground behaviour of shield TBM lunching area during excavation. In order to perform this study, a scaled model test was carried out in the 1/45 scale for a field tunnel in practice where the tunnel had about 7.8 m diameter at Seoul Metro Line 9 construction site. The test to simulate earth pressure balance (EPB) shield TBM tunnelling at the lunching area was conducted with the developed small scaled shield TBM machine. Measurements were performed during simulation of excavation for total jacking thrust force, ground displacements and pressures. Based on the analysis of simulation results, the stability of ground was verified and evaluated. In particular, the suitable reinforcement range and methods are also suggested. In addition, these results are useful for engineers and technicians to select suitable and serviceable machine operation parameters and reduce environmental influence at all stages of tunnel construction.

  • PDF

Geotechnical parameters from pressuremeter tests for MRT Blue Line extension in Bangkok

  • Likitlersuang, Suched;Surarak, Chanaton;Wanatowski, Dariusz;Oh, Erwin;Balasubramaniam, Arumugam
    • Geomechanics and Engineering
    • /
    • v.5 no.2
    • /
    • pp.99-118
    • /
    • 2013
  • Construction of the extension project of the Bangkok MRT Blue Line underground railway was recently started in 2011. The construction of approximately 5 km long underground tunnel and 4 deep excavations of underground station are considered to be the most important geotechnical works. The pressuremeter was selected as a high-quality in situ testing of the soil to evaluate design parameters for the project. In addition, other field and laboratory tests such as vane shear and $CK_0U$ triaxial tests were included in the investigation programme. This paper aims to present the ground conditions encountered along the MRT Blue Line extension project as well as the site investigation and interpretation techniques with particular focus on the pressuremeter tests. The results are also compared with the pressuremeter investigation from the previous Bangkok MRT project.

Experimental Verification of Design Parameters of Track (실측을 통한 궤도설계 파라메타의 검증)

  • Lee Jee-Ha;Hwang Sung-Ho;Na Sung-Hoon;Kim Jung-Hwan;Suh Sa-Bum
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1065-1070
    • /
    • 2004
  • When the track designer analyze the track structure uses many known & unknown parameters. Unknown parameters, equivalent rail support spring factor, unit rail support spring factor, track damping coefficient, should be assumed. Known parameters are section properties (area, section factor, etc), material properties(modulus of elasticity, mass, etc) and track conditions(wheel load, loading conditions, gauge, etc.). In the assumption of track design parameters, some parameters can be overestimated or under estimated. The purpose of this study is to verify design parameters used in track design, in the way of experimental measurements. Data of displacements, banding stresses, loads, accelerations are measurable at track site. From these data, unknown parameters are derived. Compare these assumed and derived parameters, estimate the entire track stability.

  • PDF