• Title/Summary/Keyword: railway site

Search Result 311, Processing Time 0.026 seconds

A Methodology for Compaction Control of Crushed-Rock-Soil-Fills (암버럭-토사 성토 노반의 다짐 관리 방안)

  • Park, Chul-Soo;Hong, Young-Pyo;Joh, Sung-Ho;Mok, Young-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.607-616
    • /
    • 2006
  • More strict construction control of railway roadbeds is demanded in high speed railway system because of heavier repeated dynamic loading than conventional railways. The aim of this study is to propose a compaction control methodology of crushed-rock-soil-fills including as large particles as $200\sim300mm$ in diameter, which are easily encountered in high speed railway roadbed. Field tensity evaluation and in turn compaction control of such crushed-rock-soil-fills are almost impossible by conventional methods such as in-situ density measurements or plate loading tests. The proposed method consists of shear wave measurements of compaction specimens in laboratory and in-situ measurements of fills. In other words, compaction control can be carried out by comparing laboratory and field shear wave velocities using as a compaction control parameter. The proposed method was implemented at a soil site in the beginning and will be expanded to crushed-rock-soil-fills in future. One interesting result is that similar relationship of shear wave velocity and water content was obtained as that of density and water content with the maximum value at the optimum moisture content.

  • PDF

A Tentative Methodology for Quality Control of Trackbed Fills Using Field and Laboratory P-Wave Measurements

  • Park, Chul-Soo;Park, In-Beom;Kim, Eun-Jung;Mok, Young-Jin
    • International Journal of Railway
    • /
    • v.1 no.2
    • /
    • pp.64-71
    • /
    • 2008
  • The quality of track-bed fills of railways has been controlled by field measurements of density $({\gamma}_d)$ and the results of plate-load tests. The control measures are compatible with the design procedures whose design parameter is $k_{30}$ for both ordinary-speed railways and high-speed railways. However, one of fatal flaws of the design procedures that there are no simple laboratory measurement procedures for the design parameters ($k_{30}$ or, $E_{v2}$ and $E_{v2}/E_{v1}$) in design stage. A new quality control procedure, in parallel with the advent of the new design procedure, is being proposed. This procedure is based upon P-wave velocity involving consistently the evaluation of design parameters in design stage and the field measurements during construction. The Key concept of the procedure is that the target value for field compaction control is the P-wave velocity determined at OMC using modified compaction test, and direct-arrival method is used for the field measurements during construction. The procedure was verified at a test site and the p-wave velocity turned out to be an excellent control measure. The specifications for the control also include field compaction water content of OMC${\pm}$2% as well as the p-wave velocity.

  • PDF

A Study on the Overcurrent Relay Modeling and Protective Coordination for Overload in Domestic AC Electrical Railway System (국내 교류 전기철도 급전계통 보호용 과전류 계전기 모델링 및 과부하 보호 협조에 관한 연구)

  • Kim, Hyun-Dong;Cho, Gyu-Jung;Huh, Seung-Hoon;Kim, Chul-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.7
    • /
    • pp.1121-1127
    • /
    • 2016
  • In this paper, modeling of overcurrent relay(OCR) to protect domestic AC electric railway Auto Transformer(AT) feeding system and operation characteristic analysis on overload condition are described. The target system of this paper is actual site where overload trip of circuit breaker occurs frequently. Because this AT feeding system is made of parallel single track which had a load(electric train) respectively, and is connected with only T phase of Scott Transformer. In addition, this system has been feeding 66kV voltage by KEPCO, not 154kV. We focus on protective coordination of Scott Transformer primary side and secondary side OCR for Korea single track AC electrical railway system in operation currently. We modeled single track AT feeding system and OCR. Also we performed faults and overload analysis for verification of OCR's setting values and system modeling. To analyze above mentioned research, we used PSCAD/EMTDC software tool.

Field Model Tests on Frost Penetration Depths and Frost Heave Amounts in Ballast track and Concrete track (현장모형실험을 통한 자갈궤도와 콘크리트궤도의 동결심도 및 동상량 측정)

  • Kim, Young-Chin
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.4
    • /
    • pp.506-514
    • /
    • 2016
  • Experimental ballast track and concrete track were installed on the railway site and the frost penetration depth and the frost heave amount in the winter were measured. As a result, when the freezing index was the same, the frost penetration depth of concrete track was deeper than that of ballast track. Furthermore, when an XPS and polyethylene aggregate layer was installed below the ballast track, the frost penetration depth of the ballast track decreased significantly; in the case of the concrete track, the frost penetration depth decreased when the thickness of the subbase increased. Meanwhile, the frost heave amount also decreased when an XPS and polyethylene aggregate layer was installed below the ballast track ; in the case of the concrete track, the frost heave amount decreased when the thickness of the subbase increased.

Selection method of public transportation vulnerable area using GIS buffering analysis (GIS Buffering기법을 이용한 대중교통취약지구 선정방법)

  • Kim, Yeon-Woong;Chang, Sung-Bong;Jang, Gwang-Woo;Park, Min-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1739-1742
    • /
    • 2011
  • Public transportation network in our country is concentrated and advanced focusing on urban area in order to secure economic feasibility. As a result, as dependence on private vehicles is relatively getting higher in public transportation vulnerable area, traffic problem occurs since the average running speed in urban area is 22.5km/h. This paper has an objective to suggest an improvement plan by selecting public transportation vulnerable area, and defining according to urban structure, formation and function, and understand traffic characteristics and draw problems. As a method selecting public transportation vulnerable area, an area with high division rate of vehicle was selected as a primary proposed site by calculating division rate of means of public transportation according to area. Final proposed site was selected by using GIS Buffering technique aiming at selected proposed site, and selecting non-benefit area 500m outside, which is the road limit distance from each subway and bus station. Lastly, the degree of improvement effect was studied by constructing imaginary public transportation network aiming at final proposed site and comparing to the amount of change in division rate of means of transportation.

  • PDF

Research on Facility Layout of Prefabricated Building Construction Site

  • Yang, Zhehui;Lu, Ying;Zhang, Xing;Sun, Mingkang;Shi, Yufeng
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.42-51
    • /
    • 2017
  • Due to the high degree of mechanization and the good environmental benefits, the prefabricated buildings are being promoted in China. The construction site layout of the prefabricated buildings has important influence on its safety benefit. However, few scholars have studied the safety problem on it. Firstly, in order to give a follow-up study foreshadowing the characteristics of prefabricated buildings are analyzed, the research assumptions are given and three types of safety buffers are established. And then a mult-objective model for the prefabricated buildings site layout is presented: taking into account the limits of noise, the coverage of the tower crane and the possibility of exceeding boundaries and overlapping, the constraints are and designed established respectively; Based on the improved System Layout Planning (SLP) method, the efficiency\cost\safety interaction matrices among the facilities are also founded for objective function. For the sake of convenience, a hypothetical facility layout case of the prefabricated building is used, the optimal solution of that is obtained in MATLAB with particle swarm algorithm (PSO), which proves the effectiveness of the model presented in this paper.

  • PDF

A Study on the Existing State of Preventive Maintenance and the Improvement Measures for a Point Machine (선로전환기 예방정비 현황 및 개선 방안에 관한 연구)

  • Lee, In-Hyun;Kim, Dae-Hyun;Kim, Min-Ho;Seo, Jung-Wook;Kim, Du-Ill;Jung, Ho-Hung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1174-1181
    • /
    • 2011
  • This paper investigates the current established preventive maintenance and its corresponding data on a point machine among railway signalling facilities and suggests a part of considerable plans when the policy of the preventive maintenance is modified. It is not appropriated to apply the optimized preventive replacement period considered with the cost simply. In that case, it is suggested that the reliability should be analyzed failure mode and effects through collecting the on-site failure data sufficiently. Then, that result can be proposed to adjust the proper criteria into the rational way by comparing the initial maintenance criteria. In this paper, the alternative way to determine the feasibility of the inspection period using failure probability is introduced.

  • PDF

Urban Rail Power Facilities on-site Implementation of an Integrated System Diagnosis (도시철도 전력설비 상태진단 통합시스템 현장구현)

  • Im, Hyeong-Gil;Lee, Byung-Du;Kim, Yong-Duk;Jang, Soon-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2015-2020
    • /
    • 2011
  • Key set the current non-urban rail power failure of equipment to operate the railway will generate a lot of problems. I know in advance the ideal of power equipment to prevent the failure to derive an efficient replacement cycle for the power equipment monitoring and diagnosis of the condition can become necessary to develop a system. In order to determine the status of the power plant during operation and behavior of the partial discharge current state data, regular monitoring and inspection requirements also stamp the basic current, voltage, temperature and humidity should be identified.

  • PDF

D.C. Power system Failure Point Informing Device Development of Face Trial for the Site Installation (직류급전시스템 고장점표정장치 개발을 위한 현장시범 설치)

  • Kim, Youn-Sik;Kim, Yong-Duk;Ha, Tae-Yoo;Han, Moon-Seob;Park, Jong-Gook;Im, Hyeong-Gil
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2011-2014
    • /
    • 2011
  • A "failure point informing device" is that if a accident of short or ground occurs in electric railway it inform us of the distance to accident point. SeoulMetro, KRRI, 2ISYS have developed this device and installed in line no.4 substation Iy-Chon, Sam-Gakgi to test its performance. A line resistance will be measured to test this device in November.

  • PDF

A Study on the Assessment of Track Stabilization on Ballast Cleaning work site (크리너 작업구간 선로안정화 상태평가에 관한 연구)

  • Jeon, Il-Sik;Lee, Syeung-Youl;Choi, Hyoung-Su;Kim, Han-Chip
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.268-274
    • /
    • 2011
  • In railway, Ballast plays an essential role as intermedium in transmitting train load to subgrade safely. Gyoung-Bu HSL 1st phase consists of ballasted track except for over 5km long tunnels. Ballast track occurred track irregularity by train loads and requires periodic maintenance work. However, Repetitive train operation and tamping work cause to accelerate track irregularity and ballast deterioration such as abrasion and crushing. For these reason, Track irregularity areas had occurred ballast cleaning work to improve track quality. However, for the train to run safety, ballast cleaner working area needs train speed reduction and track stabilization work due to ballast relaxation and initial settlement. In this study, according to train speed-up and cumulative traffic tonnage, we measured and analyzed the track settlement and acceleration of sleepers to evaluate of track stabilization in order to keep the ballast condition stable after cleaning work.

  • PDF