• Title/Summary/Keyword: railway signal

Search Result 441, Processing Time 0.023 seconds

A Case Study for the Selection of a Railway Human Reliability Analysis Method (철도 인간신뢰도분석 방법 선정을 위한 사례분석)

  • Jung, Won-Dea;Jang, Seung-Cheol;Wang, Jong-Bae;Kim, Jae-Whan
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.5 s.36
    • /
    • pp.532-538
    • /
    • 2006
  • The railway human reliability analysis(R-HRA) plays a role of identifying and assessing human failure events in the framework of the probabilistic risk assessment(PRA) of the railway systems. This study introduces a case study that was performed to select an appropriate R-HRA method. Three HRA methods were considered in the case study: (1) the K-MRA(THERP/ASEP-based) method, (2) the HEART method, (3) the RSSB-HRA method. Two case events were selected based on the review of the railway incidents/accidents, which include (1) a real-end collision event, which occurred on the railway between the Gomo and Kyungsan stations in 2003, (2) the signal passed at danger(SPAD) events, which are caused from a variety of factors. The three HRA methods were applied to both case events, and then the strengths and limitations of each method were derived and compared with each other from the viewpoint of the applicability of a HRA method to the railway industry.

A study on the efficient management of the railway safety regulation which uses system engineering tools. (SE도구를 이용한 철도안전규정의 효율적 관리 방안)

  • Hong Seon-Ho;Wang Jong-Bae;Cho Yuen-Ok;Hong Yong-Ki;Park Ok-Jung
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.250-257
    • /
    • 2004
  • Typical railway systems are composed of the various sub-systems, such as tracks, structures, electricity supplying systems, signal systems and vehicles. The roles of the sub-systems are clarified in the railway regulations in terms of their whole life cycle, as like design, operation and disposal stages. The regulations express clearly the basic specifications and requirements that need to accomplish their own performance and also state the standards and procedures for the normal operations and emergency conditions. In this paper the current railway regulation systems are analyzed and average revision periods are presented as the results of the analysis on revision history of railway safety regulations. This paper also presents the requirements for national safety standards based on Railway Safety Act and the necessity of application of system computer aided system engineering (CASE) tool for the improvement of legislation tasks. By exemplifying the cases of high speed rail system and Japanese cases that had developed softwares for supporing regulation revision management, the methodologies was studied for reconstruction of railway safety regulation system. As the results, it was presented such as the considerations for actual implementation and systematic safety regulation revision.

  • PDF

Analysis of Distance between ATS and ATP Antenna for Normal Operation in Combined On-board Signal System

  • Kim, Minseok;Kim, Minkyu;Kim, Doogyum;Lee, Jongwoo
    • International Journal of Railway
    • /
    • v.5 no.2
    • /
    • pp.77-83
    • /
    • 2012
  • Railroad signaling systems are to control intervals and routes of trains. There are ATS, ATP, ATO and ATC system. Trains are operated in the section which is met on the signaling system because various signaling systems are used in Korea. Hence, trains are not operated in the section which is used in the other signaling system. To solve this problem, recently combined on-board system has been developed. The combined on-board system designed by doubling the ATS, ATP and ATC system to ensure the safety of system. The inductance of antenna is change and in return the resonance frequency of antenna is varied by the electromagnetic induction. Therefore, the information signal is not received exactly in the combined on-board system and in return accidents between trains occur. In this paper, electric model of the combined on-board system for considering the ATS and ATP antenna is presented. Moreover, the mutual inductance including the distance between the ATS and ATP antenna is calculated. As a result of the frequency response of the antennas, the mutual inductance met on operation range of resonance frequency is defined.

Establishing the Methodology of Economic Analysis to Take into Account Opportunistic Valuation for a Radio Communication & Train Control System (철도무선신호제어시스템 실용화의 기회가치성을 고려한 경제성분석 체계 정립 -일반 및 고속철도용 무선 및 제어시스템 실용화 사례를 중심으로-)

  • Cho, Shin-hyung;Seo, Young-hyun;Kho, Seung-young;Rhee, Sung-mo
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.3
    • /
    • pp.373-379
    • /
    • 2016
  • Development of a train wireless signal control system using LTE-R technology is expected to have a great ripple effect to the existing signal control market. To make inroads into the international market, it is an urgent issue to practicalize the train wireless signal control system. Because it will require a huge budget to commercialize the wireless signal control system, it is necessary to analyze the feasibility beforehand, with a consideration of the domestic and foreign marketability and the impact on related industries. This study investigated the effect of the practicalization of train control system on future railway and national industrial sectors. We suggested the establishment of a framework for economic feasibility analysis, one that can provide criteria for opportunistic valuation. We also verified this framework through case analysis.

The Extraction of Train information using FFT (FFT를 이용한 열차 정보 추출 방법)

  • 임관수;김기승;박상진;조용기
    • Proceedings of the KSR Conference
    • /
    • 1998.05a
    • /
    • pp.419-426
    • /
    • 1998
  • The information for operating the train should be transmitted to train, with extreme security. In our system, The information, such that the allowable velocity of the train, train existence in current area, and other data necessary for operating train, is transmitted in the form of FM signal. Received by the receiver located on train, the signal is filtered, demodulated, and analyzed for extracting the original information. The analysis of the demodulated signal is done through FFT algorithm using sliding slot. The simulation results shows the validity of the algorithm.

  • PDF

The Study of Railroad Signal control system for old line speed elevation (기존선 속도향상을 위한 철도신호시스템의 동향 연구)

  • Kim You-Ho;Lee Hoon-Koo;Lee Soo-Hwan;Kim Young-Kyu;Baek Jong-Hyen
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.958-963
    • /
    • 2005
  • Much research for speed elevation of old first move of internal railroad is achieved. Also, several fees of foreign flag age of forty years improvement of a signal system and development accomplish. This treatise examines about. improvement and development. of consisting signal system in internal. Also, examine about development for technological reduced scale of internal relationship and research propulsion system. Wish to present direction accordingly.

  • PDF

A Study on the Interference of Harmonic Frequency during the Change of Urban Transit's Signalling Systems (도시철도 신호시스템의 절체에 따른 주파수 간섭 연구)

  • Jeong, Rag-Gyo;Kim, Beak-Hyun;Joung, Eui-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.2
    • /
    • pp.469-475
    • /
    • 2010
  • The railway signalling system plays an essential role in the safe and efficient train operation as serving control functions of train operation intervals and train routes. The reliability and safety of the system are very important because the failure of the railway signalling system can lead to train collision or derailment as well as train operation stop. Until now, in railway signalling system the conventional wayside signal mode has been used generally. There are, however, the risk of accidents such as human mistakes caused by that the driver identifies the signal lamp status and controls train speed with the naked eye. It is also necessary to refurbish the obsolete system. Thereby, It is being effective that the onboard signal mode has been recently introduced and applied in order to transmit the speed control information to train by using the computer and communication equipment. It is necessary to switch over the system in a way while providing passengers with an operation service to replace the obsolete signal system. In this paper, we verify the cases through trial assessment which are solved by the way of adding specific functionalities in the problems of interference among the procedure of switch-over processes and a serial of processes for system verification while a train is operated in the new system in parallel to the existing system.

Performance of Cooperative Networks with Mixed Relaying Protocols in Railway Environments (철도환경에서 혼합 중계 프로토콜을 이용한 협력 네트워크의 성능)

  • Cho, Woong
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.11 no.3
    • /
    • pp.271-276
    • /
    • 2016
  • Cooperative networks enhance the overall communication performance by combining signals from relay nodes and direct signal. In this paper, we analyze the performance of cooperative communication systems which use mixed relaying protocols. By assuming several relay nodes exist between the source node and destination node, we consider the systems use not a single relaying protocol but both decode-and-forward and amplify-and-forward protocols randomly. We analyze the effect of each relying protocol for the overall system performance, and also consider the performance depending on the relay location. Differential modulation scheme which demodulates signal without channel state information is adopted where it can be applicable fast varying channel such as railway environments.

A Study on the Hazard Identification and Risk Mitigation for ATSRX Using Hazard and Operability Study (HAZOP Study를 사용한 ATSRX의 위험원도출 및 리스크 완화에 관한 연구)

  • LEE Jun-Ho;LEE Kang-Mi;KIM Yong-Kyu;SHIN Ducko
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.6 s.31
    • /
    • pp.533-538
    • /
    • 2005
  • In this paper we identity the hazard using HAZOP study for ATSRX which is a subsystem of the ATP system, and we study a safety management method for the mitigation of the risk to the acceptable level. ATSRX is a device that make a train which has a ATP system operate in ATS line. For this ATSRX send a induction signal with ATS system to vehicle controller. Thus ATSRX can be said a safety equipment that makes a train operate safely. In order to identify the hazard for the internal faults in ATSRX system, we employ HAZOP study method which is recommended as hazard identification in IEC 62278, RAMS requirements in railway signal, and also it provide the detail activity in IEC 61882. Thus, in this paper we perform HAZOP study based on ATSRX related standards and using the assessment of the identified hazard we study a method to guarantee the system safety through the change of the design to mitigate the risk to the acceptable level.

A Study on ground fault at low voltage line and apparatus in urban railway station (도시철도역사의 저압선로 및 기기에서의 지락사고 방지 방안에 관한 검토)

  • Min Kyung-Yun;Kim Jin-Ho;Han Hag-Su
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.699-704
    • /
    • 2005
  • In the station of the railway and the subway various illumination equipment and a general power equipment for a passenger convenience, the signal equipment and the communication equipment which is necessary to the train operation provided. At the all of like this equipment from the electric room which is established in each station by changing from high voltage to low voltage and it supplies from the illumination transformer, the power transformer and the signal transformer. If it supplies to the equipment from the high voltage to the low voltage, it must be established to contact protection device in between the high voltage coil and the low voltage coil. Also it must do the grounding faulting device at the low voltage lines, the earthing devices at apparatus for the protection of an electric shock and an electric fire by the electric relation law. Compared the related regulations between the facilities which require protective functions such as grounding fault or earthing in public utilities like subway stations, and the facilities which do not require line earthing or protective functions such as electricity supplied for signalling the train. Also, will describe a countermeasure for the accident from a grounding fault.

  • PDF