In recent years, China's high-speed railway (HSR) line continues to expand into seismically active regions. Analyzing the features of earthquake rail irregularity is crucial in this situation. This study first established and experimentally validated a finite element (FE) model of bridge-track. The FE model was then combined with earthquake record database to generate the earthquake rail irregularity library. The sample library was used to construct a model of desired earthquake rail irregularity based on signal processing (SFT) and hypothesis principle. Finally, the effects of random pier height and random span number on desired irregularity were analyzed. Herein, an equivalent method of calculating earthquake rail irregularities for random structures was proposed. The results of this study show that the amplitude of desired irregularity is found to increase with increasing pier height. When calculating the desired irregularity of a structure with unequal pier heights, the structure can be regarded as that with equal pier heights (taking the largest pier height). For a structure with the span number large than 9, its desired irregularity can be considered equal to that of a 9-span structure. For the structures with both random pier heights and random span number, their desired irregularities are obtained by equivalent calculations for pier height and span number, respectively.
Recently, in the era of low carbon and green growth, the importance of railway transportation is being emphasized However, there is a lack of research on simulation for railway depot. This paper presents the development of the dynamic simulator for LRT(Light Rail Transit) depot. This study presents explanations of requirement analysis, architecture, database design, simulation algorithm, and design and development of the simulation tool. The dynamic LRT depot simulation tool consists of four modules; a Network Editor to create and modify information regarding railroad, train, signal, turnout, job and station, a Simulator to calculate train movement algorithm, a Reporter to show simulation results in table and graphs, and an Animator to animate simulation results dynamically. It is hoped that this study on general details of structure, design and development of LRT depot dynamic simulator will perform as a good reference to future development of new simulation tools.
Train speed controlling systems are now changing from wayside systems to onboard signaling systems. Locomotive engineers refer to wayside markers to decide on a braking point when the train speed appears to be lower than the current speed. However, in the onboard signaling systems that have been installed recently, the braking point is not determined by the wayside signal but by an onboard value. In this paper, we studied braking points and methods for deciding on such points by engineers using the onboard systems. An optimized braking point is proposed via simulation of decelerating velocity to control the velocity in the signaling system through a predefined point; Gaussian distributions are used to simulate the actual situation. We estimated and demonstrated how to obtain braking parameters in order to satisfy the interval of permitted error.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.2
/
pp.71-79
/
2008
High voltage distribution lines in the electric railway system placed according track with communication lines and signal equipments. Case of the over head lines is occurrence the many fault because lightning, rainstorm, damage from the sea wind and so on. According this fault caused protection device to wrong operation. One line ground fault that occurs most frequently in railway high voltage distribution lines and sort of faults is line short, three line ground breaking of a wire, and so on. For this reason we need precise maintenance for prevent of the faults. The most important is early detection and fast restoration in time of fault for a safety transit. In order to develop an advanced fault location device for 22.9[kV] distribution power network in electric railway system this paper deals with new fault locating algorithm using flow technique which enable to determine the location of the fault accurately. To demonstrate its superiorities, the case studies with the algorithm and the fault analysis using PSCAD/EMTDC (Power System Computer Aided Design/Electro Magnetic Transients DC Analysis Program) were carried out with the models of direct-grounded 22.9[kV] distribution network which is supposed to be the grounding method for electric railway system in Korea.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.10
/
pp.702-708
/
2016
The railway signaling system has evolved to maximize its safety and maintainability based on the experiences in the construction and operation of railway systems. The newly developed systems was established to cope with the changes in an operating environment. In the process of a transition to the new system, both the existing ATS (Automatic Train Stop) and new ATP/ATO (Automatic Train Protection/Automatic Train Operation) systems are operating simultaneously in parallel. In this situation, modifications of the conditions of the interlocking diagram and logic are necessarily required on the existing ATS systems due to the frequent improvements in signaling equipment. This paper reports the enhancement of safety and operational efficiency of the system through an improvement of the security and the interlocking conditions of the existing ATS systems. The independent display of signals for each track was ensured to avoid giving the effect of On/Off signals for the selected track on the opposite side, and the security was improved by adjusting the position and interlocking conditions. In addition, the increased traffic density of railway systems was achieved by removing the unnecessary conditions and detailed signal display, which resulted in enhanced operational efficiency.
Park Young Kon;Lee Jin Wook;Yoon Hee Taek;Kim Seon Jong
Proceedings of the KSR Conference
/
2005.05a
/
pp.530-535
/
2005
To monitor the flood level under heavy rainfall and the scour at railroad bridge, the system, which can effectively collect, store and transmit the data, is developed and applied to the field. The results in this study are as follows. 1) Monitoring for water level and scour depth is well done in view of the recording velocity and the accuracy of data which are measured. 2) This system is based on the web, internet and it is able to collect the realtime data and to analyze the risk. 3) When water level excesses the limit of danger level of a river on which railroad bridge is located, or when scour depth and angle of inclination of pier is increased, the scenario for early warning signal which sends to managers at central traffic control and drivers of trains is automatically made. It is judged that this system secures the safety of railroad and protects lives of train passengers as the warning signal sends to running train in advance at risky situation of railroad bridge under heavy rainfall.
Recently, as the road capacity reaches the limit and environmental problems becomes serious, there is gradually increased a need for railroad vehicles that are environment-friendly and have time regularity, reliability and safety. Accordingly, in addition to conventional railroad vehicles, lots of vehicles are being newly developed. We developed the hardware and software of the measurement system for on-line test and evaluation of korean high speed train. The software controls the hardware of the mesurement data and acts as interface between users and the system hardware. In this paper, we is studied for electric apparatus performance of railway vehicle using sensor. In order to this test is developed signal conversion system. Using this system, we obtained important result for pantograph voltage, battery voltage, axle speed, and inverter current.
Before introducing high speed train, train signal system was operated passively depending on a driver by signal lamp display. Now it is changing to onboard signaling system because of train speed increased(conventional track is 230km/h, high speed track is 380km/h), high speed. low speed freight train operation mixed, operation for high speed train in conventional track and dense operation. ie. ETCS(European Train Control System) Level 1 is introducing. Also, in case of high speed train, the train control system of France was introduced and has operated from 2004, now we have a difficulty for rising speed more than 300km/h because of commercial operation speed limited as 300km/h. Therefore, it need to establish the train control technique according to trackside surroundings and develope standard system like European ERTMS/ETCS, China CTCS(Chinese Train Control System), Japan D-ATC(Digital Automatic Train Control). In this paper, we derive the systematization method for Korea train technique by network-oriented, information-oriented, intelligence-oriented and combination-oriented corresponding train development direction. Proposed method has a merit to prevent cross by mixed operation with existing system and improvement after validity demonstration and system development and supply train system to meet user requirement in exporting.
This paper introduces a result of internal signal modeling for a defect diagnosis of the UM-71C track circuit using on HSL. Actually, We fixed a sample area within operating section on HSL and performed the simulations for short circuit current that is reflected characteristic impedance and propagation factor. We compared the measuring data with the result of the simulation. These modeling can be used as the basic data for secure of the safety. Also, It need to make a criteria of analysis for the maintenance through comparison simulation data and inspection data.
Urban rail transit offers target performance and function because various lower part system such as rolling-stock, signal, power and trackis consisted as complex. In order to function properly an urban rail transit which is complicated system to work as safety and reliability, System must secure safety with structure, design, manufacture, install and verification and it is important to establish a safety standard follows it procedures, establish what step all it is important to operate. Safety standard of urban transit infrastructure is minimum standard necessary to secure safety of signal, power and track. Urban rail transit standard business leads to make many requirements. Recently, many types of equipment have applied to manage requirements and standards for system efficiently in part of universal, airline and car accordingly applied equipments use to manage a pursuit(Trace) between standard of system. Especially importance of management is emphasized more become more. Importance of standard management which usesa computing support tool recently in transit filed is embossed and is predicted to be more such forward. Therefore we propose the effective method of management with infrastructure system by constructed data-base system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.