• Title/Summary/Keyword: railway construction

Search Result 1,402, Processing Time 0.034 seconds

A Study on technical items in the speed-up of catenary system according to a conventional railway′s electrification (기존선 전철화에 따른 전차선로의 스피드업관련 기술사항에 대한 고찰)

  • 안영훈;강창호
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.516-521
    • /
    • 2002
  • This paper was reviewed technical items of catenary system for electrification of Gyeongbu(Dongdaegu∼Busan) and Honam(Daejeon∼Mokpo) conventional Railways. The lines have adopted new technical items in order to connect to Gyeongbu high speed railway. We can use the technology and experience of Gyeongbu and Honam lines to a new catenary system design up-graded for speed-up of conventional lines and new lines construction.

  • PDF

A Suggestion on the Eligibility Criteria for the Construction of Urban Rail Transit (우리나라 도시철도 건설기준의 재정립 방향)

  • 이창운
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.47.1-52
    • /
    • 2002
  • According to the current eligibility criteria in Korea, only cities with populations of more than one million are eligible to carry out urban rail transit construction projects. This paper suggests measures for improving such systems by reviewing current eligibility criteria for the construction of urban rail transit including subway and LRT in Korea.

  • PDF

A Railway Network Design Problem Considering Passengers Route Choice (철도승객의 노선선택을 고려한 철도망 설계모형 연구)

  • Lim, Yong-Tae k;Jang, Jun-Seok;Park, Jin-Kyung;Lee, Jun
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.6
    • /
    • pp.581-587
    • /
    • 2008
  • This paper presents a railway network design problem (RNDP), which can be formulated as a bi-level program. In bi-level program upper level program is to minimize total travel cost including the construction cost of the railway facilities, whilst lower one describes the railway route choice behavior of passengers. We also propose a heuristic method for solving the program because it is a kind of NP-hard problem. From two numerical railway examples, we confirm that the RNDP and its algorithm produce a reasonable solution and that it is applicable to real world.

The Parameter Study of Serviceability Review of End Track on Railway Bridge installed Concrete Slab Track (콘크리트궤도 부설 교량의 단부 사용성 검토를 위한 매개변수 연구)

  • Sung, Deok-Yong;Kim, Young-Ha;Park, Yong-Gul;Kim, Sung-Il
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.117-124
    • /
    • 2008
  • Construction of concrete slab track is trending to increase gradually in national and international for reduction in track maintenance cost and secure of ride comfort. However, in case of railway bridge installed concrete slab track, the serviceability review of end deck should be performed for reducing the maintenance cost of track. The serviceability review of track contains that the compression force which is occurred on fastener of end bridge should be smaller than the compression force causing the deformation limit of elastic pad and the uplift force which is occurred on fastener of end abutment should be smaller than initial fastening force. Therefore, this study calculated the deflection and end rotation of the railway bridge according to the span length and stiffness of railway bridge and estimated the compression force and uplift force which are occurred on the track of end bridge using the finite element method. This study indicated the several diagrams that are contained the correlation between the behaviour of the track and the behaviour of the railway bridge. As a result, to reduce the end rotation of the railway bridge is very efficient to increase the height of railway deck.

  • PDF

Communication Structure for Smart Railway Network (스마트 철도 네트워크를 위한 통신 구조)

  • Kim, Young-dong
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2021.05a
    • /
    • pp.197-199
    • /
    • 2021
  • High speed railway system is progressed to SRN(Smart Railway Network) having entirely automation function beyond each componet automations. It is necessity to use mobile communication technology of LTE-R(Long Term Evolution - Railway) and 5G-R(5th Generation - Railway) and information technology of convergence based on AI, Big Data, Deep Learning to construct this smart railway networks. In this paper, a communication structure is suggested for SRN. This suggested communication structure for SRN is composed to include safety operation of high speed train, railway system management and customer services, and also have complexing function of these each functions. Results of this study can be used for SRN construction and opeation, and development of railway communication standards.

  • PDF

A Study of Analysis Method for the Track geometry measuring data on High Speed Railway (고속철도 궤도검측자료 분석기법에 관한 연구)

  • Kang, Kee Dong
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.1
    • /
    • pp.47-51
    • /
    • 2006
  • Measuring the track geometry of a high-speed railway is the most important task in track construction and track maintenance work. Measuring accuracy is particularly sign the formulation of the maintenance plan and in the assessment of the work quality, and because it can set the train speed limit. To determine the track geometry of a high-speed railway, it is important to use KNR's track recording coach (EM-120). According to the result of the spectrum analysis, noise near the 1-m wave band was found on the track recording data. A new filter was thus applied to remove the noise from the track recording data. A similar result can be acquired when this method is used in real track geometry.

Reliability-based assessment of American and European specifications for square CFT stub columns

  • Lu, Zhao-Hui;Zhao, Yan-Gang;Yu, Zhi-Wu;Chen, Cheng
    • Steel and Composite Structures
    • /
    • v.19 no.4
    • /
    • pp.811-827
    • /
    • 2015
  • This paper presents a probabilistic investigation of American and European specifications (i.e., AISC and Eurocode 4) for square concrete-filled steel tubular (CFT) stub columns. The study is based on experimental results of 100 axially loaded square CFT stub columns from the literature. By comparing experimental results for ultimate loads with code-predicted column resistances, the uncertainty of resistance models is analyzed and it is found that the modeling uncertainty parameter can be described using random variables of lognormal distribution. Reliability analyses were then performed with/without considering the modeling uncertainty parameter and the safety level of the specifications is evaluated in terms of sufficient and uniform reliability criteria. Results show that: (1) The AISC design code provided slightly conservative results of square CFT stub columns with reliability indices larger than 3.25 and the uniformness of reliability indices is no better because of the quality of the resistance model; (2) The uniformness of reliability indices for the Eurocode 4 was better than that of AISC, but the reliability indices of columns designed following the Eurocode 4 were found to be quite below the target reliability level of Eurocode 4.

Prediction of aerodynamic coefficients of streamlined bridge decks using artificial neural network based on CFD dataset

  • Severin Tinmitonde;Xuhui He;Lei Yan;Cunming Ma;Haizhu Xiao
    • Wind and Structures
    • /
    • v.36 no.6
    • /
    • pp.423-434
    • /
    • 2023
  • Aerodynamic force coefficients are generally obtained from traditional wind tunnel tests or computational fluid dynamics (CFD). Unfortunately, the techniques mentioned above can sometimes be cumbersome because of the cost involved, such as the computational cost and the use of heavy equipment, to name only two examples. This study proposed to build a deep neural network model to predict the aerodynamic force coefficients based on data collected from CFD simulations to overcome these drawbacks. Therefore, a series of CFD simulations were conducted using different geometric parameters to obtain the aerodynamic force coefficients, validated with wind tunnel tests. The results obtained from CFD simulations were used to create a dataset to train a multilayer perceptron artificial neural network (ANN) model. The models were obtained using three optimization algorithms: scaled conjugate gradient (SCG), Bayesian regularization (BR), and Levenberg-Marquardt algorithms (LM). Furthermore, the performance of each neural network was verified using two performance metrics, including the mean square error and the R-squared coefficient of determination. Finally, the ANN model proved to be highly accurate in predicting the force coefficients of similar bridge sections, thus circumventing the computational burden associated with CFD simulation and the cost of traditional wind tunnel tests.

3D Terrain Analysis and Modeling for Double-Tract Railway Route (복선 철도노선에서의 3차원지형분석 및 모델링)

  • Yeon Sang-Ho;Lee Young-Wook
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2005.05a
    • /
    • pp.131-137
    • /
    • 2005
  • Recently remote sensing technology is applied for construction projects planning and design areas by use of remote sensed satellite images according to engineering application technology in the various experimental tasks. In this study, It was applied for 3 dimensional terrain analysis and basic design by comparing to present railway and new expand doble-tract railway route of forest sites on the new construction site of 15km at national railway lines, and then showed 3-D perspective images and fly simulation images to possibility for various application as terrain analysis modeling and running simulation at the course. As a results of its applied, It gained the results not only improvement of present methods but also real various application possibilities.

  • PDF

Design and Construction Method Considering Turnout for High-speed on The Bridge with Concrete Track (콘크리트궤도에 고속분기기 설치를 고려한 교량설계 및 시공기법)

  • Kim, In-Jae;Oh, Sei-Young;Joo, Hwan-Joong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.71-79
    • /
    • 2008
  • The concrete track is being used at the Phase II of the Kyeongbu High Speed Railway and New Constructed Honam High Speed Railway. When it makes a decision of bridge type, It has to consider about longitudinal forces of Continuous Welded Rail, Displacement at the end of bridges, Up-lift forces for fastener on the track. If it is installed turnout on the bridge, There is likelihood of the deck twist by applying the each difference longitudinal forces at the 4 each rails and the buckling by concentration of rail stress at the turnout. Moreover, If it is installed turnout on the continuous bridge and REJ(Rail Expansion Joint) on the main track or turnout track. It is hard to keep a safety for rail because of coming to twist or folding at the expansion of deck on the turnout track. Therefore when it is a design of bridge with turnout. It need to take bridge type to minimize an additional axial force and a displacement at the turnout. This paper makes a study of the composite steel arch bridge that is able to resolve criteria requirements of safety for track with turnout and suggest a helpful design method for bridge considering track with turnout by being based on design and construction method of Eonyang Bridge at the north part of Ulsan Station in Phase II of the Kyeongbu High Speed Railway.

  • PDF