The Parameter Study of Serviceability Review of End Track on Railway Bridge installed Concrete Slab Track

콘크리트궤도 부설 교량의 단부 사용성 검토를 위한 매개변수 연구

  • 성덕룡 (서울산업대학교 철도전문대학원 철도건설공학과) ;
  • 김영하 (서울산업대학교 철도전문대학원 철도건설공학과, 한국철도시설공단 건설본부 장항선PM 파트) ;
  • 박용걸 (서울산업대학교 철도전문대학원) ;
  • 김성일 (한국철도기술연구원 철도시스템연구센터 철도구조연구실)
  • Published : 2008.11.13

Abstract

Construction of concrete slab track is trending to increase gradually in national and international for reduction in track maintenance cost and secure of ride comfort. However, in case of railway bridge installed concrete slab track, the serviceability review of end deck should be performed for reducing the maintenance cost of track. The serviceability review of track contains that the compression force which is occurred on fastener of end bridge should be smaller than the compression force causing the deformation limit of elastic pad and the uplift force which is occurred on fastener of end abutment should be smaller than initial fastening force. Therefore, this study calculated the deflection and end rotation of the railway bridge according to the span length and stiffness of railway bridge and estimated the compression force and uplift force which are occurred on the track of end bridge using the finite element method. This study indicated the several diagrams that are contained the correlation between the behaviour of the track and the behaviour of the railway bridge. As a result, to reduce the end rotation of the railway bridge is very efficient to increase the height of railway deck.

Keywords