• 제목/요약/키워드: railway construction

검색결과 1,402건 처리시간 0.026초

3차원 수치해석을 이용한 RPS 공법의 적용성 평가 (Estimation of RPS Method Using 3-Dimensional Numerical Analysis)

  • 노정민;신은철
    • 한국철도학회논문집
    • /
    • 제9권2호
    • /
    • pp.174-179
    • /
    • 2006
  • Recently, the crossing tunnel has been constructed frequently to connect the separated area by highway and railroad. The construction of crossing tunnel must be progressed while maintaining the existing traffic of the highway as well as railroad. There are many cross funnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(Roof Panel Shield) method in crossing tunnel construction with comparing other existing cross funnelling methods are needed a little volume of concrete and easy to change the direction of cutting shoe during the construction of pipe roof, The 3-dimensional numerical analysis of RPS to consider the arching effect was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

건설공사 설계도서매뉴얼의 전자화 절차구성 및 실무 적용효과 분석 (Procedure Development for Organizing Electronic Technical Manual of Construction Design Information and Applicability Analysis for Practical Project)

  • 강인석;문현석;곽중민
    • 한국철도학회논문집
    • /
    • 제10권2호
    • /
    • pp.103-111
    • /
    • 2007
  • The existing design materials by document type are restricted in searching and acquiring necessary design information because the materials consist of huge information and various document types. This study suggests a methodology to develop an electronic technical manual that can manage construction design materials by XML-base integrated information system. Electronic technical manual for design materials can provide visualized information through various multimedia tools such as multi-link, virtual reality and animation. Using an integrated electronic manual for construction project can prevent to miss necessary design information. The results of this study includes a data flow diagram to develop an interactive electronic technical manual (IETM) for construction design information. Finally the study suggests some scenarios for practical use and quantitative analysis of application effect analysis by AHP method.

철도교량 F.C.M(Free Cantilever Method) 공법 시공사례 연구 (The Application Of F.C.M(Free Cantilever Method) Case Study Of The Railway Bridge)

  • 권순섭;김경연;최동기;정인철;신상철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.562-567
    • /
    • 2005
  • F.C.M applied from Jin Jung Li to Yang Su Li(660m) in Puk Han River Bridge(1,414m) construction part is a construction method on the double-track construction which is the third section part of work, called Chung Ang Railroad Line(Deok-So${\sim}$Won-Ju). This method is the beginning application on Railroad Bridge. After completing upper slab structure, there are several following works such as setting up ballast, sleepers and laying long rails. So it is important to consider the properties of Railroad Bridge while designing the length of bridge and its single span. After the physical process study the shrinkage and creep of concrete, bending up by prestressing in general PSM bridge, relaxation of tendons as time goes by after post-tension, the conclusion of such a study is applied to the Puk-Han River Bridge in this construction field.

  • PDF

Article - 환기.방재측면에서의 초장대.대심도 터널에 관한 고찰

  • 이항
    • 건설안전기술
    • /
    • 통권54호
    • /
    • pp.41-55
    • /
    • 2011
  • The current railway projects under plan, design, or construction have been designed as 'very long and deep underground tunnel'. Therefore, it is reasonable that the standards for preventing disaster in such conditions should be intensified in order to avoid repeating the same failure which happened in Daegu subway disaster, Although we consent to the opinion that nothing can compete with human being's life, it is very difficult to protect the life from all of potential disasters perfectly in railway fields because the excessive standards can result in excess construction cost, which can bring about cancelation of the project itself eventually. Therefore optimized disaster design standard is required to negotiate the conflict between economical cost and social tolerance limitation simultaneously.

  • PDF

도시철도 SYSTEM 도입시 경제성 평가 방법에 대한 연구 (A study on the economical feasibility analysis method for introducing the urban transit system)

  • 박정화;이호용;홍순흠
    • 한국철도학회논문집
    • /
    • 제9권1호
    • /
    • pp.23-28
    • /
    • 2006
  • Many services have been served by the exiting subway systems since they have opened in 1975. But its efficiency and competition were going down because of the high construction cost and difficult connection with other transportations, etc. Otherwise, the light rail transit system is much lower construction cost than the subway and the high way building. Also those systems are good at the inexpensive operation cost, the fixed time and safety, the easy access. Recently, the several provinces are planning or advancing the light rail transit system because of these many benefits. Consequently, those system's economical feasibility analysis is required rapidly to show the resonable construction's cause and to get the private investment. This paper offers the system's economical feasibility through the several benefit analysis after the light rail transit system's construction.

건설.운영비를 고려한 수도권 전철의 운임체계 및 승차권제도 개선방안 (The Improvement Plan on Fare and Ticketing System of Seoul Metropolitan Subway Considering Construction and Operational Costs)

  • 이태식;류종원;정철;이동욱
    • 한국철도학회논문집
    • /
    • 제10권3호
    • /
    • pp.327-336
    • /
    • 2007
  • Operation a subway company requires high amount of early construction, operation and maintenance costs. Seoul Metro, one of the public subway companies in Seoul, Korea, has undergone operational deficit from its establishment, and the main reason is that the early construction and operation cost exceed the total revenue. Therefore, detailed researches on current operation system and possible alternatives are conducted to settle down finance trouble of the company. In particular, problems on operation and ticketing systems are analyzed, and based on that, necessity and detailed plan of railroad pass for one day are introduced and analyzed.

타설 경계면을 고려한 철도교 콘크리트궤도 전단키의 전단 거동 해석 (Analysis of Shear Behavior of Shear Key for Concrete Track on Railway Bridge Considering Construction Joint)

  • 이성철;강윤석;장승엽
    • 한국철도학회논문집
    • /
    • 제19권3호
    • /
    • pp.341-350
    • /
    • 2016
  • 철도교량 구간의 콘크리트 궤도는 교량 상부구조의 움직임에 효과적으로 대응할 수 있도록 설계되어야 한다. 이를 위해 일반적으로 전단키로 명명되는 전단키를 교면 보호 콘크리트층(PCL) 위에 일정 간격으로 설치하여 그 위에 궤도 슬래브를 타설함으로써 궤도와 교량 상부구조의 상대 변위에 의해 발생하는 전단력을 전달하도록 설계하고 있다. 이 연구에서는 전단키의 전단 거동을 예측하기 위해 타설 경계면을 고려한 비선형 구조 해석 방법을 제시하였다. 제시된 해석 방법은 콘크리트 면에서의 마찰력과 철근의 다월 거동을 고려함으로써 전단키 타설 경계면(시공이음부)에서의 전단력-전단 미끌림 거동을 예측할 수 있으며, 해석 결과 4개의 시험체에 대한 실험 결과를 잘 예측하는 것으로 나타났다.

철도 개발지 완충지역 기준 설정에 대한 연구 (A Study on the Establishment of the Standard for Buffering Region in Railway Development Areas)

  • 김민경;김동엽
    • Ecology and Resilient Infrastructure
    • /
    • 제5권1호
    • /
    • pp.45-53
    • /
    • 2018
  • 생태네트워크는 일반적으로 핵심지역, 완충지역, 코리더 등으로 구분될 수 있으며, 특히 핵심지역이나 생태적 코리더를 연결하기 위한 완충지역은 생태 네트워크의 지속성을 보호하고 외부로부터의 충격을 완충시키는 역할을 한다. 생태적 가치 및 보호적 가치가 높은 자원과 관련된 완충지역 설정에 대한 연구 및 관련법 등을 검토한 결과, 완충지역 설정에 대한 구체적인 연구가 더 필요한 것으로 생각된다. 본 연구에서는 국내외 완충지역을 설정하기 위한 기준을 제시한 다양한 분야의 사례를 조사하고, 철도환경영향평가 결과서 및 철도건설지침을 기준으로 철도개발지에 적용할 수 있는 활용방안을 분석하여 이를 평가하기 위한 항목으로 토지피복현황, 종다양성, 희귀성, 연계성을 제안하였다. 이를 통해 철도개발지 주변의 환경생태적 가치를 검토하여 철도 건설로 인한 환경 훼손 등 영향을 저감하고자 하였다.

A Scientometric and Meta-analysis of Rail Infrastructure in Nigeria

  • Awodele, Imoleayo Abraham;Mewomo, Modupe Cecilia
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.960-966
    • /
    • 2022
  • Mobility is an essential human need. Human survival and societal interaction depend on the ability to move people and goods. Efficient mobility systems are essential facilitators of economic development. Cities could not exist and global trade could not occur without systems to transport people and goods cheaply and efficiently. Rail has been considered as one of the important components of the transportation infrastructure required to service and improve the performance and productivity of an economy. In Nigeria, the rail infrastructure built by the colonial master several decades ago has been left in a state of total deterioration. This long neglect was occasioned by the failure of the government to pay adequate attention to infrastructure development. There is a vital and urgent need for rail infrastructure development in Nigeria. This study presents a systematic review of the evolution of rail, the current nature of railway infrastructure delivery in Nigeria, and offers possible suggestions on how to achieve an effective and sustainable rail infrastructure delivery in Nigeria. A thorough literature search of academic databases was conducted on current research trends on the subject of railway infrastructure by systematically reviewing selected published articles from reputable research domains. The analysis of the selected articles revealed the following among others (1) the existing railway infrastructure is in a state of mess and not sustainable, and (2), Government's investment/commitment in rail infrastructure seems inadequate compared to what is obtainable in other developed countries. Rail infrastructure development cannot be left to the Federal government of Nigeria to solve on its own; collaboration and participation are required. Government as a matter of priority should devote considerable attention to the development of rail infrastructure to harness the economic potential and transformation that sustainable rail infrastructural projects will provide.

  • PDF